Pennsylvania Railroad class T1


The Pennsylvania Railroad's 52 T1 class duplex-drive 4-4-4-4 steam locomotives, introduced in 1942 and 1945-1946, were the last steam locomotives built for the PRR and arguably its most controversial. They were ambitious, technologically sophisticated, powerful, fast and distinctively streamlined by Raymond Loewy. However, they were also prone to wheelslip both when starting and at speed, complicated to maintain and expensive to run. The PRR decided in 1948 to place diesel locomotives on all express passenger trains, leaving unanswered questions as to whether the T1's flaws were solvable, especially taking into account that the two prototypes did not have the problems inherent to the production unit. An article appearing in a 2008 issue of the Pennsylvania Railroad Technical and Historical Society Magazine showed that inadequate training for engineers transitioning to the T1 may have led to excessive throttle applications, resulting in driver slippage. Another root cause of wheelslip was faulty "spring equalization": The stiffnesses of the springs supporting the locomotive over the axles were not adjusted to properly equalize the wheel-to-track forces. The drivers were equalized together but not equalized with the engine truck. In the production fleet the PRR equalized the engine truck with the front engine and the trailing truck with the rear engine, which helped to solve the wheelslip problem.

Development

Before the T1, the last production express passenger engine the PRR had produced was the K4s of 1914, produced until 1928. Two experimental enlarged K5 locomotives were produced in 1929, but they weren’t considered enough of an improvement to be worthwhile. After that, the PRR's attention switched to electrification and the production of electric locomotives; apparently, the railroad decided that it did not need more steam locomotives.
But the deficiencies of the K4s became more evident during the 1930s. They were fine locomotives, but as train lengths increased they proved to be underpowered; double headed K4s locomotives became the norm on many trains. The railroad had many locomotives available, but paying two crews on two locomotives per train was expensive. Meanwhile, other railroads were leaping ahead, developing increasingly powerful passenger train locomotives. Rival New York Central built 4-6-4 Hudsons, while other roads developed passenger 4-8-2 "Mountain" type and then 4-8-4 "Northern" type designs. The PRR's steam power began to look outdated.
The PRR began to develop steam locomotives again in the mid-to-late 1930s, but with a difference. Where previous PRR locomotive policy had been conservative, new radical designs took hold. Designers from the Baldwin Locomotive Works, the PRR's longtime development partner, were eager to prove the viability of steam in the face of new competition from Diesel-electric locomotives. They persuaded the railroad to adopt Baldwin's latest idea: the duplex locomotive. This split the locomotive's driving wheels into two sets, each with its own pair of cylinders and rods. Until then, the only locomotives with two sets of drivers were articulated locomotives, but the duplex used one rigid frame. In a duplex design cylinders could be smaller, and the weight of side and main rods could be drastically reduced. Given that the movement of the main rod could not be fully balanced, the duplex design would reduce the "hammer blow" on the track. The lower reciprocating mass meant that higher speeds could be achieved. Use of poppet valves also increased the speed because they gave very accurately timed delivery of steam to the cylinders. However, there was a drawback of the metallurgy used; the poppet valve could not withstand the stress of sustained high-speed operation.
The first PRR duplex was the single experimental S1 #6100 of 1939. It was powerful and managed to reach 100.97 miles per hour on level track with 1350 tons passenger stock behind her. Its performance encouraged the PRR continued to develop duplex steam locomotives. The S1 was built unnecessarily large for her exhibition at the 1939 New York World's Fair until October 1940; therefore its turning radius prohibited it from operating over most of the PRR network. The 6-4-4-6 design reduced driving set traction to the point that it was especially prone to wheel slip; thus only one Class S1 was built. The PRR returned to Baldwin to develop a duplex design fit for series production. The PRR ordered two Baldwin prototypes at a cost of $600,000 in June 26, 1940. Both prototypes had numerous teething problems and were prone to wheelslip if not handled carefully by the engineer. But favorable test reports resulted in a production order for 50 T1s, split between the PRR's own Altoona Works and Baldwin. On Dec 20, 1944, the PRR Board authorized the purchase of 50 Class T1 locomotives for $14,125,000. Baldwin's chief designer, Ralph P. Johnson, was responsible for the mechanical aspects of the new T1 class. Designer Raymond Loewy obtained US Patent D 136,260 for an early T1 conceptual design with a high-mounted cab located over the forward driving set. While that suited Baldwin's objective of making the most distinctive steam locomotive possible, practical considerations led the T1 design to be revised to the conventional cab position with a slight modification of the unique nose design included in Loewy's patent.
The last production T1 entered service on August 27, 1946. The T1 was fitted with the PRR passenger locomotive standard 3 note whistle.
Engine #5539 developed, as tested between September 11, 1946 and September 14, 1946 by Chesapeake and Ohio Railway dynamometer car DM-1 while on loan to C&O. In 1944 #6110, tested on the Stationary Test Plant in Altoona, developed in the cylinders at.
Due to their complexity relative to other steam locomotive designs, T1s were known to be difficult to maintain. Recommended to a maximum speed of 100 miles per hour, T1s were so powerful that they could easily exceed their designed load and speed limitations, which in turn often caused wear and tear issues. A technician charged with determining the cause of frequent poppet valve failures on the T1s claimed to have observed them being operated at speeds of up to 140 mph to make up time. The T1 was designed to run reliably at speeds of up to. Although such reports are viewed as dubious, some think T1s regularly exceeded 100 mph, making them among the fastest steam locomotives ever built. The price paid for such speed was higher maintenance costs and increased failures in service.
The T-1 4-4-4-4 was so powerful that violent wheel slip over a wide speed range could occur if the throttle was not handled carefully by the engineer. Loss of driver traction at high speeds, especially when the T1 was under heavy load while ascending grades, caused damage to the poppet valves. They were described as "free steaming," meaning they could maintain boiler pressure regardless of throttle setting.
'' to New York.

Fate

Most T1s were degraded to power secondary train when the PRR Board decided to dieselize all first-class prime train in 1948. Some of them were withdrawn from passenger service as early as 1949. All of them were out of service by 1952. All T1 locomotives were sold for scrap between 1951 and late 1955. The last engines were towed westward for scrapping in early 1956. However, an exact scale live steam replica in 1 inch/foot scale has been built by Ed Woodings, using the original T1 plans. Not to mention, the T1 has proven a fairly popular subject to be reproduced in model form. A fairly loose computer generated version of a PRR T1 also appeared in the 2004 film Lemony Snicket's A Series of Unfortunate Events.

No. 5550

In 2014, a non-profit group known as The T1 Trust is constructing an all-new, fully operational T1 using the original plans with subtle performance improvements where necessary. The T1 Trust's goal is to provide mainline excursion service and to set the world speed record for a steam locomotive currently held by the LNER Class A4 4468 Mallard at 126 mph. It is worth mentioning the original T1s were reported to have broken Mallard's speed record as far back as 1948, but these claims have never been officially confirmed. The T1 Trust's cost estimate to build T1 number 5550 is $10 million with an expected completion date of 2030. The construction of 5550 is also following construction and financing methods pioneered by the LNER Peppercorn Class A1 60163 Tornado project. The first piece of the locomotive, the keystone shaped number plate, was cast in April 2014, followed by the first minor component, a driving spring link pin, in October 2014. Major components completed as of March 2019 include two Boxpok drivers, the prow, cab, third-course boiler and fire door. Front tube sheet construction was underway at a St. Louis, Missouri-based fabricator.