Yamal 204


Yamal 204 was a geostationary communications satellite ordered by Gazkom to RSC Energia. It was to be a twin of Yamal 202 and was supposed to ride along with Yamal 203 on what would have been the third launch of the Yamal program. As a copy of Yamal 202, it would be the second iteration of the USP Bus. It would have been a satellite with 4,080W of power on an unpressurized bus. It would have had eight SPT-70 electric thrusters by OKB Fakel for station keeping. Its payload was 18 C band transponders to be supplied by Space Systems Loral.

History

During 1997, even before the launch of their first satellites, Gazkom was planning the second generation. At that time they planned a 24 satellites of the second generation. This extremely aggressive plan was scaled back by 2001 with a plan to launch four 200 series satellites. The first two, Yamal 201 and Yamal 202 would be launched by 2001 and the second pair, Yamal 203 and Yamal 204 by 2004.
Yamal 201 and Yamal 203 would be identical and be positioned at the 90°E slot and Yamal 202 and Yamal 204 would also be twins and be positioned at the 49°E slot. But the program was delayed and while Yamal 201 and Yamal 202 actually launched on November 24, 2003, Gazkom moved to the Yamal 301 and Yamal 302 project, cancelling both Yamal 203 and Yamal 204.