Waterloo East railway station
Waterloo East railway station, also known as London Waterloo East, is a railway station in central London on the line from through London Bridge towards Kent, in the south-east of England. It is to the east of London Waterloo railway station and close to Southwark tube station.
The station opened in 1869 as Waterloo Junction, to provide a connection between the London and South Western Railway at Waterloo, and the South Eastern Railway at Charing Cross. A dedicated line was built between Waterloo and Waterloo East, which was later converted to a footpath. Trains originally ran to, but after competition from the London Underground, these were withdrawn as a wartime measure in 1916. The station continued to be connected to Waterloo mainline via a footbridge. Waterloo East was given its current name in 1977, and remains an important interchange in London. It is part of the London station group.
Location
The station is on the South Eastern main line down the line from Charing Cross, on the other side of the River Thames across from Hungerford Bridge. Although Waterloo East is a through-station, it is classed for ticketing purposes as a central London terminus.Services through the station are operated by Southeastern and it is situated within fare zone 1. The main access is via an elevated walkway across Waterloo Road, which connects it to the larger Waterloo station. The eastern ends of the platforms provide pedestrian connection to Southwark station which is served by London Underground's Jubilee line; at street level there is an entrance in Sandell Street. Connections with the Underground's Bakerloo, Northern and Waterloo & City lines are available at Waterloo Underground station.
The four platforms at Waterloo East are lettered rather than numbered to ensure that staff who work at both Waterloo East and the adjoining Waterloo station, which is managed and branded separately and features numbered platforms, do not confuse the platforms at the two stations. Platforms for the Thameslink platforms at St Pancras International and their predecessors at use this numbering convention, as well as at.
London Buses routes 1, 26, 59, 68, 76, 77, 139, 168, 172, 176, 188, 211, 243, 341, 381, 507, 521, peak hours express route X68 and night routes N1, N68, N171, N343 and N381 serve the station.
History
South Eastern Railway
The station was built by the South Eastern Railway after the line to opened in 1864. The company were under pressure to connect with London and South Western Railway services, as it would allow the latter to connect to the City of London via Cannon Street. The LSWR were not interested in making Charing Cross a joint station, but were amenable to providing a connection with the SER next to Waterloo.In 1867, the two companies agreed to build a joint connection so that passengers could change from LSWR to SER services in order to reach the City of London via. Another station, was built to the east, but it was closed in favour of a connecting station with the LSWR. Construction of a single-line, connection begun in May 1868, and the new connection station opened on 1 January 1869 at a total cost of £14,290. Blackfriars Road station closed on the same date. Trains began running from Waterloo Junction to Charing Cross and Cannon Street around every five minutes. Queen Victoria used the connection for royal trains travelling from Windsor Castle to Dover and Continental Europe.
The original station was built with two platforms, which were and long, and both wide. The waiting room and ticket offices were housed in arches underneath the line. The bridge connection from the main Waterloo station included a movable platform, which allowed passengers to cross directly into Waterloo East when trains were not running. It was mounted on a four-wheel truck which could easily be moved out of the way if a train needed to come through. The connection ran until January 1893, when it was discontinued because of overcrowding.
When the SER line opened between Charing Cross and Cannon Street in 1864, it was frequented by prostitutes, who discovered the journey between the two stations was sufficiently long to service clients while paying minimum rent. After Waterloo East opened, the frequent stopping of trains there made this impractical.
The connection from Waterloo Junction through to Cannon Street did not prove a success because of competition from the Metropolitan District Railway and the spread of the Underground. Passengers were generally unaware of the existence of the station, as it was not obvious to find it from the main concourse in Waterloo. Following the opening of the Waterloo and City line on 8 August 1898, connections to Cannon Street were reduced. Cross train services from Waterloo Junction to Cannon Street ended on 31 December 1916, as a wartime economy measure.
The dedicated line from Waterloo through to Waterloo Junction was demolished in 1911 when the main-line station underwent an extensive reconstruction. The bridge which carried the line over Waterloo Road subsequently accommodated the pedestrian walkway between the two stations.
Southern Railway and later
The Southern Railway renamed the station Waterloo on 7 July 1935 and it took its present name on 2 May 1977. The platforms were designated A – D at the same time.The pedestrian access from Waterloo mainline was replaced by the current high level covered walkway in 1992. The site of the original rail link, which had been out of use since 1916 was then demolished.
Waterloo East was closed for maintenance on 24 July 1993 so a link with Southwark tube station, then under construction, could be built. It re-opened on 16 August. Southwark tube station opened on 20 November 1999 with the extension of the Jubilee line to, and included a direct connection to Waterloo East.
In 2012, ticket barriers were installed at the Sandell Street and Southwark station entrances, and also at the main entrance from Waterloo station following the completion of the retail balcony. In 2018, Transport for London announced a new entrance would be built on Greet Street, providing access to both Waterloo East and Southwark.
Services
All "up" trains run to Charing Cross only, and depart from platforms B and D. All "down" trains run from platforms A and C. The typical off-peak service is:- 18 trains per hour to Charing Cross
- 2 tph to via
- 2tph to Dartford via Sidcup
- 2 tph to via Sidcup
- 2 tph to Dartford via and
- 2 tph to via Catford Bridge
- 2 tph to via Orpington
- 2tph to Tunbridge Wells via Orpington
- 2 tph to via Orpington and Tunbridge Wells
- 1 tph to Dover Priory via
- 1 tph to via Ashford International and