is a semiarid country with scarce water resources. The largest water consuming sector in Syria is agriculture. The domestic water use stand only at about 9% of total water use. A big challenge for Syria is the high population growth with a rapidly increasing demand of urban and industrial water. In 2006 the population of Syria was 19.4 million with a growth of 2.7%.
Access
Public water supply systems cover about 95% of the households in urban areas and about 80% in rural areas. Drinking Water Supply
Year
Urban
Rural
1996
95%
71%
2002
98%
83%
2006
94%
80%
In 2002 96% of all urban households were connected to a sewer system. Nearly half of rural house connections were connected to a pipe sewerage system in 2002. In 2002 about 30% of the rural households were connected to a pit latrine. Improved Sanitation
Year
Urban
Rural
1996
97%
56%
2002
98%
75%
Water quality
All major cities - with the exception of Aleppo – and all rural distribution networks in the rural areas are supplied with water of good quality from springs and groundwater. Major water treatment facilities exist only for the domestic water supply system for Aleppo, which is provided with water from Lake Assad.
Water resources
Most of the domestic water in Syria is supplied by groundwater, wells and springs. One exception is Aleppo city, which receives water for domestic use by pipelines from the Assad reservoir. However, the city ofHoms is supplied with surface water from the Orontes River through a pipeline from Lake Homs.
Wastewater management
In 2002, total wastewater produced in Syria was estimated at 1,364 million m3. Of this total 550 million m3 was treated in the cities of Damascus, Aleppo, Homs and Salamiyah. All treated wastewater is reused for irrigation. In October 2009, the Ministry of Housing and Construction announced a plan to develop Syria’s wastewater infrastructure. The plan involves the construction of 180 new wastewater treatment plants across the country. Two plants are in the foreground: one located in Jaramanah and the other serving the southern city of As Suwayda. The procurement of the two plants has been assigned to Syrian-Qatari Holding Company. SQH had planned to seek potential strategic partners through competitive tenders before February 2010. To increase the attractiveness of the project the Syrian Ministry of Finance has pledged to provide a sovereign guarantee for the agreements that will be signed with the partners. The two new plants would allow reusing treated effluent for agricultural irrigation, an established practice in Syria. However, as of December 2010 the projects were delayed after SQH failed to reach a financial agreement with the government. Also, a law on public-private partnerships that would have been the legal basis for the Build-Operate Transfer projects was delayed.
Institutional framework
The Syrian water sector is fragmented and different institutions have overlapping functions and responsibilities. The Ministry of Housing and Construction is responsible for proposing, planning and executing the Government's programme in the field of water supply and sanitation. Through its 14 water and sanitation directorates it is also in charge of providing water supply and sanitation services. The Ministry of Local Administration has the task to plan and implement all governmental activities at regional level. MLAE is responsible for the protection of the environment by issuing the required standards and monitoring the quality of water for all uses. The State Minister for Environment Affairs is responsible for dealing with all main environmental issues. The Ministry of Irrigation is responsible for supplying water for agriculture.