WES Commuter Rail


WES Commuter Rail is a commuter rail line serving part of Washington County, Oregon, United States, within the Portland metropolitan area. Owned by TriMet and operated by Portland and Western Railroad, it serves five stations in the cities of Beaverton, Tigard, Tualatin, and Wilsonville. The line spans, running north–south and generally parallel to, and west of, Oregon Highway 217 and Interstate 5. It operates on a 30-minute headway on weekdays during the morning and evening rush hours, connecting suburban commuters to MAX Light Rail at Beaverton Transit Center. In May 2018, WES carried an average 1,590 riders.
Local officials began exploring the possibility of an intercity commuter rail service in 1996 and the Washington County commuter rail project acquired approval from affected jurisdictions in 2002. Construction commenced in 2006 and the commuter rail line opened on February 2, 2009. From the start of the first serious discussions of the idea, it took thirteen years and $166 million to get WES operational.

History

The route of WES consists of two historically separate railroads.
The route between Greton and Wilsonville was originally built by the Oregon Electric Railway in 1908; at Greton the line continued northeasterly to Portland, a route that was abandoned in the mid-1930s. The Oregon Electric stopped running passenger trains in the late 1930s and soon after switched to diesel locomotives, continuing to run freight trains to Beaverton and Portland to the north, and to Salem, Albany and Eugene to the south.
The route from Greton to Beaverton was built by an affiliate of the Southern Pacific Railroad beginning in 1906, and opened to traffic in 1910. This route connected with Southern Pacific's existing west-east line in Beaverton that provided service to Portland and Hillsboro, and a second route south of Tigard to Cook, which was a junction with an existing route between Lake Oswego and McMinnville. In 1914, the Southern Pacific electrified these lines as part of its Red Electric service in competition with the Oregon Electric Railway; by 1929 the Southern Pacific ended electric service, and passenger service was switched first to steam trains and doodlebugs, and later buses.
Both the Southern Pacific and the Oregon Electric continued to provide freight service on the line until the 1990s when both railroads leased its low-density branches to shortline operators. In this case, the Southern Pacific leased its lines to newly formed Portland and Western Railroad in August 1995; followed by the Burlington Northern leasing its lines to the Portland & Western in October 1995. This put the operations of two competing railroads in the same hands for the first time in history.
Led by Washington County, planning for WES began in 1996, when county officials started working with the cities of Beaverton, Tigard, Tualatin, Wilsonville and Sherwood, as well as government transportation agencies to study the idea of establishing passenger rail service between Beaverton and Wilsonville on the existing P&W line. TriMet took over as the project's lead planning agency in 2002. After years of delays due to lack of funding, the project received approval from the Federal Transit Administration in May 2004, resulting in the funding of approximately 50 percent of the line's capital costs.

Construction

Track work began October 23, 2006, in Wilsonville, and a ceremonial "ground-breaking" was held two days later in Tigard, although the project had already started and no dirt was moved.
During planning and construction, the project was called the Washington County Commuter Rail, or alternately the Wilsonville to Beaverton Commuter Rail since much of Wilsonville is in Clackamas County. TriMet held a naming contest to choose a name for the new line, and in November 2007 it announced WES as the winner. By December of that year, construction on the rail line was 75 percent complete and included five new bridges and two rehabilitated bridges, and improvements to of track and 14 road crossings. A distinctive feature of the line is the gauntlet track sections installed at the three intermediate stations. The feature allows freight trains to swing clear of the high-level platforms at the stops, so that wider cars do not strike them.
In June 2008, the line was more than 90 percent complete, with all the track in place. The four Colorado Railcar Diesel multiple unit cars ordered for the line then arrived; a total of three powered DMU cars and one non-powered "trailer car" were tested on the route. A ceremonial inaugural run for dignitaries and journalists took place on January 22, and public preview rides on January 30, ahead of a February 2, 2009, public opening.

Delays and problems with Colorado Railcar

Originally scheduled to open in September 2008, opening was delayed several times and eventually to February 2009 due to technical and other difficulties, most notably the failure of Colorado Railcar. TriMet lost $3 million from the delays and from its financial support of CR, which included paying CR's suppliers and providing "rail engineering expertise and on-site technical assistance." They provided bailout funds to CR, paying rent, phone, and power bills, and ultimately taking control of the failing company long enough to take delivery of its vehicles.

Ridership

Service

WES trains run every 30 minutes between Wilsonville and Beaverton during morning and afternoon rush hours. The scheduled one-way travel time is 27 minutes. For its first 3 years of service, the WES line was located entirely within TriMet fare zone 3, but travel on WES required a TriMet "All-Zone" fare, rather than a one-zone or two-zone fare. However, effective September 2012, TriMet discontinued all use of fare zones, and WES fares consequently became identical to the fares on any other TriMet rail or bus line. C-Tran all-zone day and monthly passes are also accepted as valid fare on WES. P&W, which continues to run freight trains on the line, operates the commuter trains, and TriMet maintains them.

Stations

The self-propelled rail cars on the line serve stations in Wilsonville, Tualatin, Tigard, and at two locations in Beaverton. At the Beaverton Transit Center, the northern terminus of the line, commuters using WES are able to transfer between the WES cars and either of two light-rail lines: the MAX Blue Line, serving the Hillsboro–Gresham corridor via downtown Portland, and the MAX Red Line, connecting to Portland International Airport via downtown Portland. The Beaverton Transit Center station also offers connections to 11 TriMet bus lines. Hall/Nimbus Station, the second stop in Beaverton, is served by local TriMet bus lines 76 and 78 and has about 50 park-and-ride spaces. The station is within walking distance of Washington Square Mall and Nimbus Business Park. The Beaverton Transit Center station has no park-and-ride facility.
Tigard Transit Center Station was an existing TriMet transit center and is served by seven TriMet bus lines. Located in downtown Tigard, the station has about 100 park-and-ride spaces. Tualatin Station is in downtown Tualatin, on Boones Ferry Road near the intersection with Tualatin-Sherwood Road. The Tualatin station is served by TriMet bus lines 76 and 97 and includes 130 park-and-ride spaces, plus another 24 spaces in a nearby lot connected to the station by line 76.
The Wilsonville station, at the southern end of the line, provides about 400 park-and-ride spaces. Wilsonville's South Metro Area Regional Transit opened a new transit center, known as "SMART Central", at the station in January 2009. Wilsonville Station is connected via buses to residential and employment zones in the city. Wilsonville and Salem-Keizer Transit currently provide express bus service between the two cities, linking to the rail line. The city of Canby to the southeast also links to WES through SMART's service. Other neighboring communities are also expected to use the Wilsonville stop, including Lake Oswego, Donald, Woodburn, and Aurora.
StationImageLocationOpenedConnections and notes
Beaverton Transit CenterBeaverton2009 MAX Light Rail: Blue and Red lines
TriMet: 20, 42, 52, 53, 54, 57, 58, 61, 76, 78, 88
Secure bike parking
Beaverton2009 TriMet: 76, 78
50 park and ride spaces; secure bike parking
Tigard Transit CenterTigard2009 TriMet: 12, 42, 45, 64, 76, 78, 93; YCTA
103 park and ride spaces; secure bike parking
Tualatin2009 TriMet: 76, 97; Tualatin Shuttle
129 park and ride spaces; secure bike parking
Wilsonville2009 SMART, Cherriots
399 park and ride spaces; secure bike parking

Equipment

TriMet's fleet of commuter-rail cars consists of three powered cars and one "control trailer", a type of car which isn't powered but has an operating cab at one end and can control the powered car to which it is coupled. The trailer can be pulled or pushed. The self-propelled diesel cars do not require a locomotive or overhead electrical wires. Each of the three powered rail cars seats 74 passengers, while the control trailer seats 80. The cars are numbered 1001–1003 and 2001 in TriMet's fleet of vehicles. Originally priced at $4 million each prior to cost overruns, the cars are equipped with places for two mobility devices and two hanging bicycle racks, and have enough space for 139 standing passengers. In a two-car train, passengers can pass between the two connected cars. Interiors of both car types contain high-back seats with blue upholstery.
Trains on WES were designed to travel at an average speed of with a top speed of. Each self-propelled car has two Detroit Diesel Series 60 12.7L engines, each of which is rated at 600 horsepower. TriMet was required to purchase U.S.-manufactured trains due to federal funding of the commuter line, and purchased from Colorado Railcar, the sole U.S. maker of DMUs that comply with Federal Railroad Administration rules. The WES cars and the 35 freight locomotives sharing the track with WES include cab signals as part of a system designed to prevent train-to-train collisions. Positive train control is being installed along the line. Cars on the line are serviced and maintained by TriMet at the maintenance facility at the southern end of the line in Wilsonville. Adjacent to Wilsonville Station, the blue metal structure employs six mechanics. The adjacent rail yard is used to store all WES trains when not in service.
One piece of equipment replaced only a month after WES began operations is its train horn. The FRA requires all trains operating on heavy rail lines to sound their horns for at least 15 seconds at a minimum level of 96 decibels as they approach crossings. For the rush hour-only schedule used when WES began operation, that meant over a thousand blasts a week along its route, starting as early as 5:30 am. Complaints about the noise caused TriMet to replace the original 102-decibel Leslie rs3k horns for a fleet-wide cost of $5,000. The new 96-decibel k3la horns, which met the minimum requirements, still led to complaints. TriMet asked the FRA for a waiver, proposing that they install yet another horn — similar to that used on MAX Light Rail — that would sound at 80 decibels and be accompanied by bells that would ring at 60 decibels continuously as the train neared a crossing. However, the FRA turned down this request, citing safety concerns.
Equipment failures and periodic maintenance on the agency's Colorado Railcar DMUs resulted in TriMet substituting buses for some runs on several occasions since the service began. To provide backup equipment for the line, TriMet purchased two Budd Rail Diesel Cars from the Alaska Railroad in 2009. The cars were originally built in 1953, and had been taken out of service in 2008. TriMet refurbished the cars, and planned to operate them as a backup for the Colorado Railcar units when they are out of service. They entered service on January 24, 2011.
In 2014, TriMet considered purchasing one two-car Nippon Sharyo DMU trainset to supplement the WES fleet, as an option under an existing contract between that manufacturer and Sonoma–Marin Area Rail Transit, but could not reach an agreement with the manufacturer on the price. US Railcar, Colorado Railcar's successor, offered to sell TriMet two cars at $5 million each. TriMet opted instead to purchase two more used Budd RDCs, for a total of not more than $1.5 million, in 2017 from Allearth Rail, LLC, of Vermont, which had last been operated by Dallas Area Rapid Transit's Trinity Railway Express commuter rail service. TriMet had unsuccessfully bid to purchase the same two cars in 2016, when they were auctioned by DART, but subsequently negotiated to purchase them from the winning bidder and new owner, Allearth Rail. The two cars, ex-TRE 2007 and 2011, arrived at the WES maintenance facility in August 2017. They were originally expected to enter service on the WES line in fall 2018, after the completion of a few modifications, but this was subsequently delayed to sometime in 2021.
Car numberManufacturerModelYear builtFirst used
on WES
Notes
1001–1003Colorado RailcarAero20082009Diesel multiple units
2001Colorado RailcarAero20082009Unpowered control car
1702BuddRDC19532011Ex-Alaska Railroad 702; originally New Haven 129
1711BuddRDC19522011Ex-Alaska Railroad 711; originally New Haven 121
2007BuddRDC1957 Ex-Trinity Railway Express 2007; ex-Via Rail
2011BuddRDC1957 Ex-Trinity Railway Express 2011; ex-Via Rail

Costs

According to TriMet, WES Commuter Rail has a cost of $16.32 for each rider; compared to $4.21 for a bus rider or $3.23 for a MAX light rail rider.

Future

There are no plans to expand WES service, owing to low ridership. In the past, there have been proposals to extend WES along existing P&W tracks to Salem.