A railway was first planned in 1885. Investigations into the line were conducted in 1968, funding was agreed in 1973, and construction began the following year. The first section, from Owendo to Ndjolé, opened in 1978, with the remaining sections opening in stages until December 1986. Costs were well over budget and almost bankrupted the country. The Trans-Gabon Railroad is overall adjacent the Ogooue River until Ndjolé. Most important constructions are the Juckville Tunnel, the viaduct over the Abangaswamp, and the bridge over the confluence between the Ogooue and the Ivindo Rivers. The line to Franceville was completed in 1987. Originally intended to reach Makokou and carry iron ore, its route was changed for political reasons, namely to keep within national bordersmanganese ore traffic from COMILOG that went on the COMILOG Cableway via the Republic of Congo. When the railway reached the manganese mine at Moanda, the Cableway was closed. The railway was privatisedin 1999. Plans regularly surface proposing an extension to Brazzaville in the Republic of the Congo.
Construction and specifications
Because the line was built well into the era of earthmoving machinery, the need to choose a narrow gauge to save costs was no longer important. However the choice of standard gauge took advantage of off the shelf equipment. It was constructed by a consortium of Impregilo, Astaldi, Philipp Holzmann, Constructions Et Entreprises Industrielles and Entreprise De Construction Franco-Africaine. Following the injection of sterling from the then P.M Margaret Thatcher and the Conservative government, the discovery of uranium helped to secure British interest in the project. Many UK expatriates took the place of French workers and the building of the railway progressed rapidly from this point. Circa May 1983 CCI Eurotrag took over funding. British firms involved included Wimpey International, who seconded staff to Taylor Woodrow. The initial building of 182kms from Owendo to Ndjole took over 10 years to complete. The remaining 400+kms took only 5 years.
Recent history
In 2003 Hughes Network Systems installed a satellite based telephony system into all the railway stations of the railway. In June 2006 a new line for iron ore from Belinga to port was announced. It is unclear if it will use part of the existing line. The track will be standard gauge. This line was supposed to open in 2012, but in 2014 completion is still awaited. Two EMD JT42CWR locomotives shipped September 2011. A further 4 locomotives and 10 passenger coaches were also ordered. On 18 May 2019 three workers were killed in an accident on the line.
Network
There are no links with the adjacent states of Equatorial Guinea, Cameroon, or the Republic of the Congo. The railway is important for transporting timber and uranium in addition to being the only important public transport route in the nation. In 1996, the railway carried 3MT of freight and 190,000 passengers. The Trans-Gabon Railway, has 23 stations.
Trivia
The Trans-Gabon Railway crosses the Ogooue River five times, at Franceville, at Ndjolé, and three times around Booué.
Literature
Minko Monique. 1983. Les communications Terrestres. in Geographie et Cartographie du Gabon, Atlas Illustré led by The Ministère de l'Education Nationale de laRepublique Gabonaise. Pg 86-87. Paris, France: Edicef