Talybont Reservoir


Talybont Reservoir is the largest stillwater reservoir in the central Brecon Beacons at. Talybont-on-Usk is downstream of the dam.
Construction of the current dam started in 1931 by Newport Corporation, and in 1939 the reservoir started supplying Newport with treated water.
The reservoir is now owned be Welsh Water. In 2019 a £10 million modernisation took place, including upgrading the pipework inside the dam.