The station has one island platform and one side platform. The current station structure opened on 15 March 1936, which included a hotel on the second floor. The hotel closed in 1965, and the restaurant was closed in 1986. Construction is ongoing for a plan to move the tracks and station underground by 2017.
History
1899-12: The construction on the station began.
1900-05-15: Construction on the station was completed.
1900-11-29: The section from Tainan to Dagou opens for service.
1901: The section from Tainan to Wanli opens for service.
1905: Slight expansion of the station.
1911: Rebuilt due to collapse from wind and rain.
1927: Due to double track construction from Tainan to Kaohsiung and inadequacy of the station, the station was demolished. Construction began on the second-generation station the same year.
1936-03-15: The current station is completed, taking a total of two years seven months to complete. A hotel was opened on the second floor of the station.
1945: The Station sustained damage from an American bombing. A restaurant was also added on the second floor.
1954-06-06: The Taiwan Sugar Railways Guanmiao line is extended to south of Tainan Station.
1965: The hotel on the second floor of the station was closed.
1969-05-20: The Guanmiao line was demolished.
1977-06: A station rear entrance/exit was constructed to benefit East District residents and the students and teachers of nearby schools who otherwise would have to go through the main entrance/exit on Beimen Road.
1986: The restaurant on the second floor of the station was closed.
2007-04-26: The Tainan Urban District Railway Underground Project is finalized. This plan moves the station as well as the railroad tracks from around Shijian Park to the southern end of Shengchan Road completely underground. The original station aboveground will be preserved as a landmark and some of original railroad tracks area converted into a park.
2009-09-09: The Executive Yuan Council for Economic Planning and Development approved the Tainan Urban District Railway Underground Project. Construction was expected to begin and last for over seven years to be completed by 2017.
2010-12-21: Two additional barrier-free elevators at the front station were put into operation
2010-12-21: The Shalun Line begins operation, allowing passengers to reach the Shalun Station and the connected Tainan HSR station in 20 minutes.
2012-05-08: A barrier-free elevator connecting Platform 1 and 2 is completed and put into operation.
2016-04-21: Puyuma Express trains began to stop at Tainan Station.
2017-05-07: The collapse of the lobby ceiling injured two passengers, causing an investigation into the structural integrity of the historical site.
2017-10: Renovations began, costing a total of NT$157 million and an estimated construction period of 40 months.
2019-11: The main construction on the new underground station began with expected completion and opening in 2023.