Sunderpahari


Sunderpahari is a community development block that forms an administrative division of Godda district, Jharkhand state, India. It is located 15 km from Godda, the district headquarters.

Geography

Sundar Pahari, the CD Block headquarters, is located at.
Sunderpahari CD Block has 13 panchayats and 203 villages.
The Rajmahal Hills cover most of the Boarijore and Sunderpahari CD Blocks in Godda district.

Demographics

As per 2011 Census of India Sundarpahari CD Block had a total population of 65,463, all of which were rural. There were 32,895 males and 32,568 females. Population below 6 years was 11,724. Scheduled Castes numbered 1,399 and Scheduled Tribes numbered 50,133.
In 2011 census Sundar Pahari had a population of 888.

Literacy

As per 2011 census the total number of literates in Sundarpahari CD Block was 23,441 out of which 14,662 were males and 8,779 were females.
As per 2011 census, literacy in Godda district was 57.40.Literacy in Jharkhand was 66.41% in 2011.Literacy in India in 2011 was 74.04%.

Economy

Agriculture

Around 80% of the population depends on agriculture, the main economic activity of the district but lack of irrigation facilities is a major constraint in raising the existing low levels of productivity. A sizable population is also engaged in animal husbandry and cottage industries.

Coal mining

Godda district is rich in coal. A major coal mining project of Eastern Coalfields Limited is going on in Boarijore, Mahagama and Sunderpahari CD Blocks.
Rajmahal open cast project supplies coal to the 2,100 MW Farakka Super Thermal Power Station and the 2,340 MW Kahalgaon Super Thermal Power Station. Both the power stations are owned by NTPC and the mines are operated by Eastern Coalfields Limited. Opened in 1985, the mine presently produces 10.5 million tonnes annually and efforts are on to raise it to 17 million tonnes per annum.
The two public sector power stations located nearby in West Bengal and Bihar have been facing coal supply problems. Essel Mining and Industries, of the Aditya Birla Group, is likely to take over the operations of the Rajmahal open cast project. It is amongst the larger mines in operation in the country.

Power plant

The foundation stone of Jindal Steel and Power’s 660x2 MW power plant at Nipania under Sunderpahari CD Block was laid in 2013 by President Pranab Mukherjee. The coal requirement is estimated to be 6.5 million tonnes annually, out of which 2.5 million tonnes will come from the Jitpur Block locally, and 4 million tonnes imported from Mozambique and Indonesia.