A submerged floating tunnel, also known as submerged floating tube bridge, suspended tunnel, or Archimedes bridge, is a proposed design for a tunnel that floats in water, supported by its buoyancy.
The tube would be placed underwater, deep enough to avoid water traffic and weather, but not so deep that high water pressure needs to be dealt with—usually 20–50 m is sufficient. Cables either anchored to the Earth or to pontoons at the surface would prevent it from floating to the surface or submerging, respectively.

Construction

The concept of submerged floating tunnels is based on well-known technology applied to floating bridges and offshore structures, but the construction is mostly similar to that of immersed tunnels: One way is to build the tube in sections in a dry dock; then float these to the construction site and sink them into place, while sealed; and, when the sections are fixed to each other, the seals are broken. Another possibility is to build the sections unsealed, and after welding them together, pump the water out.
The ballast used is calculated so that the structure has approximate hydrostatic equilibrium, whereas immersed tube tunnels are ballasted more to weight them down to the sea bed. This, of course, means that a submerged floating tunnel must be anchored to the ground or to the water surface to keep it in place.

Applications

Submerged floating tubes allow construction of a tunnel in extremely deep water, where conventional bridges or tunnels are technically difficult or prohibitively expensive. They would be able to deal with seismic disturbances and weather events easily, and their structural performance is independent of length.
On the other hand, they may be vulnerable in regards to anchors or submarine traffic, which therefore has to be taken in consideration when building one.
Likely applications include fjords, deep, narrow sea channels, and deep lakes.

Proposals

A submerged floating tunnel has never been built, but several proposals have been floated by different entities.
DatePlaceCountryProposerlink
1886Patent N.9558United KingdomSir Edward James Reed
1890Patent N.447735United StatesH. Moerser
1905Patent N.357983FranceM.F. Hennebique
1907Patent N.862288United StatesH.O.Smith
1923PatentNorwayTrygve Olsen
1947patent pending nr. 91699NorwayErik Ødegård
1960Patent N.1262386FranceM.F. Cristaldi
Strait of MessinaItalyAlan Grant
1984Como LakeItalyG.Magrini
HøgsfjordenNorwayNorwegian Public Roads Administration
Transatlantic tunnelDiscovery Channel's Extreme Engineering
2011SognefjordNorwayNorwegian Public Road Administration
2016BjørnafjordNorwayNorwegian Public Road Administration
Multiple potential sitesHyperloop One
Funka Bay, HokkaidoJapanSociety of Submerged Floating Tunnel Technology
Lake Washington, SeattleUnited StatesJames Felch / Subterra, Inc.
Vancouver IslandCanadaMinistry of Transportation of British Columbia, Canada
Lugano LakeSwitzerland
Cook StraitNew ZealandStuff.co.nz
Garda LakeItaly

Europe

In Norway, a first patent on this structure was presented in 1923 by Trygve Olsen and a new request was done in 1947 by the engineer Erik Ødegård. The interest has been revived during the last centuries with several studies in Norway, but it is just with the studies done by the Norwegian Public Road Administration that the feasibility of the structure is proven, with the recent developments of the offshore structures. The Norwegian Public Roads Administration has investigating the technical and economic potential for eliminating all ferries on fjord crossings along the western corridor between Kristiansand and Trondheim. This project also linked with FEHRL through the Forever Open Road programme. If the project were to proceed it estimated to cost $25 billion and be completed by 2050.
Ponte di Archimede International, an Italian company, investigated the SFT in collaboration with the Norwegian Roads Research Laboratory, the Danish Road Institute and the Italian Shipping Register, with a financial grant from the European Union and the coordination of FEHRL an International Association of over 30 National Road Centres. Furthermore, the Provincial Administrations of Como and Lecco, in Italy, have officially shown great interest in the Archimedes' Bridge for crossing the Lario and the study of the submerged floating tunnel in the Strait of Messina has been promoted by Ponte di Archimede S.p.A. and verified with a feasibility analysis by the Italian Naval Register.

China

The SIJLAB, created in 1998, between Institute of Mechanics, Chinese Academy of Sciences, China and Ponte di Archimede S.p.A., is financed by the Italian Ministry of Foreign Affairs, the Chinese Ministry of Science and Technology and the Institute of Mechanics of the Chinese Academy of Sciences.
The consortium has started to build a 100m demonstration tunnel in Qiandao Lake in China eastern province of Zhejiang. Inside it, two layers of one-way motorways will run through in the middle, with two railway tracks flanking them. The Qiandao Lake prototype will serve to help plan for the project of a 3,300-meter submerged floating tunnel in the Jintang Strait, in the Zhoushan archipelago, also situated in Zhejiang.
According to Elio Matacena, the President of Ponte di Archimede International, the only difficulty building such tunnels in deeper waters is the price of the structure. Namely, the cables, which are very expensive, would be very long. He also notes that the tunnel is capable of supporting more weight than a traditional bridge, which has very strict weight limits, while being up to two times cheaper. Matacena points out that environmental studies show that the tunnel would have a very low impact on aquatic life.

Indonesia

has also expressed interest in the technology. For the infrastructure that would connect Sumatra to Java Island two options were explored: a conventional bridge or an undersea tunnel.
In 2004 the tunnel option was more widely discussed, especially when Kwik Kian Gie, then the Minister of National Development, announced that a European consortium was interested in investing in an undersea tunnel between Java and Sumatra. The budget was said to be around 15 billion US dollars for an undersea tunnel in the Sunda Strait; in the long term it would link up Java and Sumatra in an uninterrupted chain. The project was to begin construction in 2005 and be ready to use by 2018, and was a part of the Asian Highway.
However, the bridge option was later favored.
In 2007, Indonesian experts, led by Ir. Iskendar, Director for the Center of Assessment and Application of Technology for Transportation System and Industries, participated in a meeting with SIJLAB engineers, from the Sino-Italian Archimedes Bridge project. As an archipelagic country, consisting of more than 13 thousand islands, Indonesia could benefit from such tunnels. Conventional transportation between islands is mainly by ferry. Submerged floating tunnels could thus be an alternative means to connect adjacent islands, in addition to normal bridges.