Steventon railway station


Steventon railway station was built when the Great Western Railway extended their main line from Reading to the village of Steventon, opening the line on 1 June 1840. Two months later, on 20 July, it was extended to Faringdon Road, and in December of that year, to Swindon.

Station for Oxford

For four years stagecoaches transported passengers between Steventon and Oxford, until 1844 when a branch was built to the city from Didcot; despite this, mail trains from the West continued to call at Steventon, rather than Didcot, in order to drop off mails for Oxford – this practice did not end until March 1962.
On 7 December 1964 British Railways withdrew passenger services from Steventon and all other intermediate stations between Didcot and Swindon.
The station was demolished soon after closure and there is no evidence remaining, except for a house used briefly as the company headquarters of the Great Western Railway which still stands on the "up" side of the line.

Headquarters of the GWR

Steventon was briefly the headquarters of the GWR: in October 1841, the Board decided to merge the previously-separate London and Bristol committees. Steventon was chosen as a suitable new location because it was close to the half-way point of the line. A building for this purpose was erected: reputedly designed by the Engineer of the GWR, Isambard Kingdom Brunel in the Jacobean style, but modified by the Resident Engineer for the Reading/Swindon section of the line, J.H. Gandell, this building still survives on the north side of the line, set back slightly from the site of the station platforms. After a delay of several months, during which the accommodation was made ready, the weekly board meetings were held at Steventon from 21 July 1842 until 5 January 1843, when the permanent headquarters was established at Paddington.

Accidents and incidents