The St. Clair Tunnel is the name for two separate rail tunnels which were built under the St. Clair River between Sarnia, Ontario and Port Huron, Michigan. The original, opened in 1891 and used until it was replaced by a new larger tunnel in 1995, was the first full-size subaqueous tunnel built in North America. It is a National Historic Landmark of the United States, and has been designated a civil engineering landmark by both US and Canadian engineering bodies.
First tunnel (1891-1995)
The first underwater rail tunnel in North America was opened by the St. Clair Tunnel Company in 1891. The company was a subsidiary of the Grand Trunk Railway, which used the new route to connect with its subsidiary Chicago and Grand Trunk Railway, predecessor to the Grand Trunk Western Railroad. Before the tunnel's construction, Grand Trunk was forced to use time-consuming rail ferries to transfer cargo. The tunnel was an engineering marvel in its day and designed by Joseph Hobson. The development of original techniques were achieved for excavating in a compressed air environment. The Beachtunnelling shield, designed by Alfred Ely Beach, was used to assist workmen in removing material from the route of the tunnel and left a continuous iron tube nearly long. Freight trains used the tunnel initially with the first passenger trains using it in 1892. The tunnel measured from portal to portal. The actual width of the St. Clair River at this crossing is only. The tube had a diameter of and hosted a single standard gauge track. It was built at a cost of $2.7 million.
Locomotives
Steam locomotives were used in the early years to pull trains through the tunnel, however concerns about the potential dangers of suffocation should a train stall in the tunnel led to the installation of catenary wires for electric-powered locomotives by 1907. The first use of electric locomotives through the tunnel in regular service occurred on May 17, 1908. The locomotives were built by Baldwin-Westinghouse. In 1923, the GTR was nationalized by Canada's federal government, which then merged the bankrupt railway into the recently formed Canadian National Railway. CN also assumed control of Grand Trunk Western as a subsidiary and the tunnel company and continued operations much as before. The electric-powered locomotives were retired in 1958 and scrapped in 1959 after CN retired and scrapped its last steam-powered locomotives on trains passing through the tunnel. New diesel-powered locomotives did not cause the same problems with air quality in this relatively short tunnel.
The second tunnel was built to handle intermodal rail cars with double-stacked shipping containers, which could not fit through the original tunnel or the Michigan Central Railway Tunnel in Detroit. By the early 1990s, CN had commissioned engineering studies for a replacement tunnel to be built adjacent to the existing St. Clair River tunnel. In 1992, new CN president Paul Tellier foresaw that CN would increase its traffic in the Toronto–Chicago corridor. The Canada-U.S. Free Trade Agreement was implemented in 1989 and discussions for a North American Free Trade Agreement between Canada, the United States and Mexico discussions were underway at that time. It was only logical that import/export traffic on CN's corridor would increase dramatically. In 1993, CN began construction of the newer and larger tunnel. Tellier declared at the ceremonies:
" tunnel will give CN the efficiencies it needs to become a strong competitive force in North American transportation"
Unlike the first tunnel, which was hand dug from both ends, an earth boring machine called the Excalibore made by the Lovat Tunnel Equipment Inc. was used. It started on the Canadian side and dug its way to the U.S. The tunnel opened later in 1994 whereupon freight and passenger trains stopped using the adjacent original tunnel, whose bore was sealed. The new tunnel was dedicated on May 5, 1995 and measures from portal to portal with a bore diameter of with a single standard gauge track. It could accommodate all freight cars currently in service in North America, thus the rail ferries were also retired in 1994 at the time of the tunnel's completion and opening for service. On November 30, 2004, CN announced that the new St. Clair River tunnel would be named the Paul M. Tellier Tunnel in honour of the company's retired president, Paul Tellier, who foresaw the impact the tunnel would have on CN's eastern freight corridor. A sign now hangs over each tunnel portal with this name.
Incident
On June 28, 2019, train CN M383-28, hauling 100+ cars, had 40 cars derail in the tunnel, spilling 13,700 gallons of sulfuric acid and closing the tunnel for several days afterwards. The tunnel re-opened on July 10, 2019.