South African Class 19B 4-8-2


The South African Railways Class 19B 4-8-2 of 1930 was a steam locomotive.
In 1930, the South African Railways placed fourteen Class 19B steam locomotives with a 4-8-2 Mountain type wheel arrangement in service. One of them was later reboilered and reclassified to Class 19BR.

Manufacturer

Fourteen Class 19B 4-8-2 Mountain type steam locomotives were built in Germany by Berliner Maschinenbau AG and were delivered in 1930. All but one were built with Walschaerts valve gear.

Characteristics

The South African Class 19B, numbered in the range from 1401 to 1414, was a later model of the original Class 19 which had been designed in 1928 under the supervision of Colonel F.R. Collins DSO, Chief Mechanical Engineer of the SAR from 1922 to 1929. It was virtually identical to the Class 19 apart from the wheelbase of the front bogie which had been increased from to to improve the clearance between the cylinders and the bogie wheels, since the bogie wheels of predecessors Classes 19 and 19A fouled the cylinder covers on sharp curves. The longer wheelbase bogie also facilitated the removal of cylinder covers at running sheds. Because of this difference, the new engines were designated Class 19B.
The first thirteen Class 19B locomotives were delivered with Walschaerts valve gear, but like Class 16DA no. 879 of the same year, no. 1414 was equipped with Caprotti valve gear as an experiment. In January 1943, after thirteen years in service, the Caprotti rotary cam poppet valve gear was removed at the Uitenhage workshops and replaced with Walschaerts valve gear. The experiment did result in the successor Class 19C being built with rotary cam poppet valve gear.
The trailing bissel truck was constructed with three holes to enable the compensating beam to be fitted at three locations, which enabled it to be used to redistribute the engine's weight on the trailing axle. The axle load weights as shown for the Class 19B are with the trailing truck compensating beam pin in the rearmost of the three holes. The axle load weights as shown for the Class 19BR are also with the trailing truck compensating beam pin in the rearmost of the three holes.
A drawback of the Class 19B was that it was conservatively engineered with outdated short-travel valves which caused them to consume more coal for a given task than the later Class 19D.
As built, the Class 19B was delivered with Type MT tenders with a coal and a water capacity, even though the axle load of of these tenders exceeded the permissible limits on the branch lines for which the Class 19B was intended. Upon delivery, their new Type MT tenders were exchanged for the smaller modified Type MP1 tenders from some of the reboilered mainline locomotives. The Type MP1 had a lighter axle load of and was therefore more suitable for branch line work. This policy was followed with all the Classes 19B, 19C and 19D locomotives except the last batch of Class 19D, which was delivered with Type MX torpedo tenders.

Watson Standard boilers

From the 1930s, many serving locomotives were reboilered with a standard boiler type designed by then CME A.G. Watson as part of his standardisation policy. Such Watson Standard reboilered locomotives were reclassified by adding an "R" suffix to their classification.
When Class 19B no. 1410 was reboilered with a Watson Standard no. 1A boiler, it therefore became the sole member of Class 19BR. It was not equipped with a Watson cab with its distinctive inclined front in the process, but retained its original vertical fronted cab. It did, however, have the tell-tale rectangular regulator cover just to the rear of the chimney which identified it as a Watson Standard reboilered locomotive.

Service

South African Railways

Some Class 19B locomotives served around Cape Town and between Kimberley and Vryburg, but most of them spent their working lives on the line between Graaff-Reinet and Rosmead across the Lootsberg Pass. A couple were also allocated to Sydenham in Port Elizabeth and occasionally worked on the Grahamstown branch.
During the motive-power shortages of the late 1950s, the Rosmead-based engines and their crews were required to exert an almost super-human effort on the Mossel Bay-Johannesburg express on the section from Klipplaat to Noupoort and back to base at Rosmead in one day, hand-firing an inefficient engine more than a mile vertically over the Lootsberg and Carlton Heights mountain passes during the course of a, 12-hour shift. This schedule only became possible after completion of the mile-long Carlton tunnel under the continental divide in mid-1958, which eliminated the long 1 in 40 gradients up the old line to Carlton summit.
Since the Class 19B was heavy on coal, a ground-level concrete coal bin was built at Graaff-Reinet especially to replenish these locomotives on through runs while standing in the platform road. There was no standpipe alongside the platform road, however, so even though coal was taken here, through-working engines took water at Charlwood and Pretoriuskloof.
During 1974–1975 they were replaced by Class 19D locomotives on the Rosmead-Klipplaat section. By 1977, they were all withdrawn from service.

Industrial

After being retired from SAR service, several were sold into a second career in industrial service.
NumberWorks nmrTHF / PrivateLeaselend / OwnerCurrent LocationOutside South Africa?
1402Berliner 9828PrivateRailway Society of South AfricanHilton Station
1412Berliner 9838PrivateCeres Railway CompanyRoyal Cape Yacht ClubOPERATIONAL
1413Berliner 9839PrivateSasol Synfuels eastSecunda

Illustration

The main picture shows the Transnet National Collection's preserved Class 19B no. 1412 taking water at Blouwater before piloting a Class GMAM Garratt and the Union Express across the Lootsberg Pass, c. 2001. When withdrawn, no. 1412 was initially plinthed at Middelburg in the Cape Province and later restored. During 2016 it re-entered service as Bailey, restored at Voorbaai for the Ceres Rail Company.