Specification R.14/40 replaced an earlier specification R.5/39 which was an up-armed revision of specification R.3/38 for a faster flying boat than the Short Sunderland. Shorts, among others, had tendered a design for R.5/39 but the Ministry had changed their minds about the need for an immediate replacement for the Sunderland. R.5/39 had considered a maximum weight up to 84,000 lb – R.14/40 allowed for a maximum takeoff of nearly 100,000 lb with a bomb load of 20,000 lb. The projected engines were the Bristol Centaurus radial or the Napier Sabre inline. Shorts and the other British manufacturer of big flying boats, Saunders-Roe, were involved in the competitive tender for R.14/40; Saro proposed the Saunders-Roe S.41. Rather than selecting either company's design, the Air Ministry asked the companies to submit a combined project, stipulating the terms under which the work was to be shared between them. The detailed design was performed by Saro, their experience with the Saro Shrimp contributing to the hull shape, as well as building the wing. Shorts built the hull, tail and the final assembly.
Variants
Short S.35 Shetland I
The first prototype and what was to be the only Shetland I first flew on 14 December 1944, piloted by Shorts' Chief Test PilotJohn Lankester Parker as captain and Geoffrey Tyson as co-pilot. The aircraft flew without gun turrets at Felixstowe in October 1945. Testing indicated satisfactory water handling but the stabilising floats were mounted too low and did not offer sufficient clearance for takeoffs with maximum load. Flight testing revealed problems with the harmonisation of controls and marginal longitudinal stability. Before the trials were complete, the aircraft burnt out at its moorings on 28 January 1946 as a result of a galley fire.
Short S.40 Shetland II
With the end of the war, the second prototype was completed as a civil transport and designated Shetland II. It was designed to carry 70 passengers but only 40 seats were fitted. Registered "G-AGVD," the Shetland Mk. II's first flight took place on 17 September 1947. After trials, it was delivered to Short's factory at Belfast, but no orders were forthcoming and it performed only limited flight trials before being scrapped in 1951.