After the railroad was damaged by the Labor Day Hurricane of 1935, the line was sold to the United States government, which refurbished Seven Mile Bridge for automobile use. Unsupported sections were added in 1935 to widen it for vehicular traffic. Dismantled trackage was recycled, painted white, and used as guardrails. It had a swing span to allow passage of boats in the Moser Channel of the Intracoastal Waterway, near where the bridge crosses Pigeon Key, a small island that held a work camp for Flagler's railroad. Hurricane Donna in 1960 caused further damage. The current road bridge was constructed from 1978 to 1982. The vast majority of the original bridge still exists, although the swing span has been removed. The 2.2-mile section to Pigeon Key, used as a fishing pier and long open to motorized vehicles to give access to the key, was closed to motorized traffic in 2008 after the unsupported sections began to sag. In 2014, the Florida Department of Transportation approved a $77 million plan to restore the old bridge. By 2017 the pedestrian section was closed, with extensive repairs predicted to be finished by about late 2021.
Engineering
The new bridge is a box-girder structure built from precast, prestressed concrete sections, comprising 440 spans. Near the center, the bridge rises in an arc to provide -high clearance for boat passage. The remainder of the bridge is considerably closer to the water surface. The new bridge does not cross Pigeon Key. The total length of the new bridge is actually or, and is shorter than the original. The bridge carries the Florida Keys aqueduct, supplying water to points west, as well as fiber optic cables, providing telecommunications to and from the lower Keys. Each April, the bridge is closed for about 2.5 hours on a Saturday for the Seven Mile Bridge Run that commemorates the Florida Keys bridge rebuilding project. The event began in 1982 to commemorate the completion of a federally funded bridge building program that replaced spans that oil tycoon Henry Flagler constructed in the early 1900s to serve as a foundation for his Overseas Railroad. The Seven Mile Bridge was engineered by Figg & Muller Engineers. The structure was completed six months ahead of schedule and has earned eight awards, including an Exceptional Award for Cost Savings Innovation from the Federal Highway Administration.
In fiction
The bridge has been featured in films and television series, such as Licence to Kill, True Lies, 2 Fast 2 Furious, and Burn Notice.