The Semmering railway was constructed between 1848 and 1854 by some 20,000 workers under the project's designer and director Carl von Ghega born in Venice as Carlo Ghega in an Albanian family. The construction features 14 tunnels, 16 viaducts and over 100 stone arch bridges and 11 small iron bridges. The stations and the buildings for the supervisors were often built directly from the waste rock dug out when making the tunnels. Across an overall track length of 41 km the Semmering railway overcomes an altitude difference of 460 m; on 60% of its length the gradient is 2.0-2.5% and 16% exhibit a curvature radius of only 190 m. This was an entirely new technical dimension of railway construction, and new instruments and methods of surveying had to be developed to handle the resulting challenges. Also, new technologies were employed for the Engerth locomotives because the types in general use at this time could not handle the extreme gradients and turning radii. Even while being built, the Semmering railway was perceived as an effort of "landscape gardening", i.e. it attempted a harmonious combination of technology and nature. The unique travel experience which the Semmering railway offered contributed significantly to the original opening of the Semmering region for tourism. Numerous hotels and mansions are witnesses of this epoch. This enormous upswing to the turn of the century and the re-evaluation of the region as a winter sports area in the first third of the 20th Century were interrupted first by World War I and then by the changed recreational needs of the population. Therefore, this unique culture landscape could be preserved with little change. A trip on the Semmering railway, which is in full use 160 years after its building, still impresses the traveller as a special experience by its varied landscape, the typical style of its mansions and the characteristic sequence of viaducts and tunnels. In 1998 the Semmering railway was added to the list of the UNESCO World Heritage sites.
Locomotives
The Semmering trials
A competition was held to decide which locomotives would be bought for operation on the Semmering Railway. One stretch of the line had gradients of 1 in 40 and curves with a minimum radius of and a maximum radius of. A speed of was required to be maintained and a maximum axle loading of 14 tonnes, with a boiler pressure not exceeding 8.5 kgf/cm².
Entrants
There were four entrants, Bavaria, built by Maffei; Neustadt built by Wiener Neustädter Lokomotivfabrik; Seraing built by Société anonyme John Cockerill in Belgium; and Vindobona built by the Locomotive Factory of Wien-Gloggnitzer Bahn in Vienna. All four locomotives fulfilled the conditions of the trial, but did not prove reliable in practice.
The Engerth design articulated the tender with the main locomotive frame, allowing some of the weight of the fuel and water to be carried on the driving wheels to improve adhesion. Because the tender was articulated, rather than directly attached to the frame, the locomotive could traverse relatively sharp curves, while still enjoying the advantage of the additional adhesive weight gain. The original design also included an indirect drive from the main driving wheels to the wheels under the tender. This arrangement proved too complex to maintain and was dropped from the design. Sixteen locomotives were supplied to the Semmering Railway between November 1853 and May 1854. They proved capable of uphill on gradients of 1 in 40. An Engerth locomotive was featured on an Austrian stamp commemorating the 150th anniversary of the Semmering Railway in 2004. The Engerth locomotive also appeared on a 25 Euro coin issued by Austria in 2004.
Present day
Currently, the Semmering railway uses the well-known Siemens ES64U2 locomotives for this route as the main workhorse of the ÖBB. Starting with 1963 it also uses ÖBB class 1142 locomotives, now used as banking engines on the line, and also the ÖBB Class 1144 since 1977 as banking engines and also freight/passenger engines. In 1971 this is where a SJ Rc locomotive conducted trials that put the basis of the ÖBB Class 1043. For local trains the Bombardier Talent and ÖBB Class 4020 are used.
Semmering Base Tunnel
On April 25, 2012 ground was broken for the construction of the 27.3 km Semmering base tunnel. This tunnel will bypass 41 km of the Semmeringbahn. The tunnel is expected to open in 2024, with a total cost of €3.1b.
The Semmering alpine railway has been the main motive for many collector coins and medals. One of the most famous and recent ones is the 150 Years Semmering Alpine Railway Coin. The obverse shows two locomotives: a historical and a modern one. The reverse of the coin shows a typical Semmering view. An Engerth steam locomotive just emerged from a tunnel crossing one of the distinctive viaducts. The 1967 Austrian schilling note features the engineer on one side, and a Semmering scene on the other.