Santiago Metro Line 6
Santiago Metro Line 6 is a line on the Santiago Metro, Santiago, Chile. It connects the commune of Cerrillos, in the south west of the city, with Providencia in the east of the city, where most economic activity is concentrated. It has 10 new stations on 15.3 km of track.
The main purposes of Line 6 is to relieve the saturated Line 1 and to provide extra connections across the Santiago transport network. The line connects with Line 1, Line 2, Line 3 and Line 5, with the suburban train network at Lo Valledor station, and with the Transantiago bus network at Avenida Pedro Aguirre Cerda, Avenida Departamental, Avenida Santa Rosa and Avenida Grecia. It is also hoped that the line will incentivise development in the south central area of the capital city.
The line directly benefits the communes of Cerrillos, Estación Central, Pedro Aguirre Cerda, Santiago, San Miguel, San Joaquín, Ñuñoa, Providencia and Las Condes.
It was inaugurated on November 2, 2017, by President Michelle Bachelet.
History
The project was announced by Chilean president Michele Bachelet in 2009. In January 2012 a modification to the original track plan was announced, with the “Maestranza” and “Club Hípico” stations relocated on Avenida Carlos Valdovinos.However, on December 22, 2017, as a result of the announcement of the construction of the new Line 7, the lengthening of Line 6 from the Los Leones station to the future Isidora Goyenechea station is confirmed, with which both lines will remain connected.
Initial criticisms
Mayors of some of the wealthier communes in the east of the city have criticised the project, claiming that insufficient consultation had taken place before it was announced. Other critics complained about further delays in the construction of Line 3, whose completion date was pushed back in favour of Line 6.Technical studies carried out by the Catholic University of Chile claimed that Line 6 has several advantages over Line 3, primarily because of its greater social impact and the potential for development it brings to derelict areas of the city.
Innovations
The new metro lines are expected to comply with high security and passenger comfort standards. The new security measures will include cameras inside the trains, an overhead electric transmission line, auto-drive, doors located on the platform, air conditioning in the trains and connections with suburban trains.Line 6 suffered the least amount of damage from the October 2019 protests, but was nevertheless closed on the weekend of October 18, 2019 due to security issues. Service on Line 6 was partially restored on October 23, and all stations were reopened by the end of the year.
Communes">Communes of Chile">Communes served by Line 6
Line 6 serves the following Santiago communes from west to east:- Cerrillos
- Estación Central
- Pedro Aguirre Cerda
- Santiago
- San Miguel
- San Joaquín
- Ñuñoa
- Providencia
Stations
Line 6 stations, from west to east, are:
Pictogram | Stations | Transfers | Location | Opened | Commune | Note |
Cerrillos | Pedro Aguirre Cerda/Departamental Avenues | November 2, 2017 | Cerrillos | |||
Lo Valledor | Carlos Valdovinos Avenue/Maipú Street | November 2, 2017 | Pedro Aguirre Cerda | |||
Presidente Pedro Aguirre Cerda | Carlos Valdovinos/Club Hípico Avenue | November 2, 2017 | Pedro Aguirre Cerda | |||
Franklin | Placer/Nataniel Cox Streets | November 2, 2017 | Santiago | |||
Bío Bío | Placer Street/Santa Rosa Avenue | November 2, 2017 | Santiago | This station will be future combination with the line in 2027 | ||
Ñuble | Carlos Dittborn/Vicuña Mackenna Avenues | November 2, 2017 | Ñuñoa | |||
Estadio Nacional | Pedro de Valdivia/Grecia Avenues | November 2, 2017 | Ñuñoa | |||
Ñuñoa | Pedro de Valdivia/Irarrázaval Avenues | November 2, 2017 | Ñuñoa | |||
Inés de Suárez | Pedro de Valdivia/Francisco Bilbao Avenues | November 2, 2017 | Providencia | |||
Los Leones | Providencia/Suecia Avenues | November 2, 2017 | Providencia | This station will be future combination with the line in 2027 | ||
Isidora Goyenechea | Vitacura Avenue/Isidora Goyenechea Avenues | 2026 | Las Condes | This station will be future combination with the line in 2027 |
Line 6 data sheet
- Terminus communes: Cerrillos and Providencia
- Track:
- * Camino a Melipilla Avenue
- * Carlos Valdovinos Avenue
- * Isabel Riquelme Avenue
- * Placer avenue
- * Carlos Dittborn Avenue
- * Pedro de Valdivia Avenue
- * Avenida Providencia Avenue
- * Vitacura Avenue
- Construction Method:
- * Underground
- Opening Dates:
- * November 2, 2017