Saint John River High Level Crossing


The Saint John River High Level Crossing is a steel girder bridge crossing the Saint John River at Coytown, New Brunswick, Canada.
Completed in 2001 and opened to the public in October 2002, the bridge carries 4 lanes of the realigned Route 2. Total length is 1000 m with multiple spans resting on concrete piers. The centre span is 120 m with an airdraft clearance of 60 m for navigational traffic. It was built by the Maritime Road Development Corporation as part bg of a toll highway project..