Reverse electrodialysis is the salinity gradient energy retrieved from the difference in the salt concentration between seawater and river water. A method of utilizing the energy produced by this process by means of a heat engine was invented by Prof. Sidney Loeb in 1977 at the Ben-Gurion University of the Negev. In reverse electrodialysis a salt solution and fresh water are let through a stack of alternating cation and anion exchange membranes. The chemical potential difference between salt and fresh water generates a voltage over each membrane and the total potential of the system is the sum of the potential differences over all membranes. The process works through difference in ion concentration instead of an electric field, which has implications for the type of membrane needed. In RED, as in a fuel cell, the cells are stacked. A module with a capacity of 250 kW has the size of a shipping container. In the Netherlands, for example, more than 3,300 m³ fresh water runs into the seaper second on average. The membrane halves the pressure differences which results in a water column of approximately 135 meters. The energy potential is therefore e=mgΔh=3.3*106 kg/s*10 m/s2*135 meters ca.= 4.5*109Joule per second, Power=4.5 gigawatts.
Development
In 2006 a 50 kW plant was located at a coastal test site in Harlingen, the Netherlands, the focus being on prevention of biofouling of the anode, cathode, and membranes and increasing the membrane performance. In 2007 the Directorate for Public Works and Water Management, Redstack, and ENECO signed a declaration of intent for development of a pilot plant on the Afsluitdijk in the Netherlands. The plant was put into service on 26 November 2014 and produces 50 kW of electricity to show the technical feasibility in real-life conditions using fresh IJsselmeer water and salt water from the Wadden Sea. Theoretically, with 1m3/s river water and an equal amount of sea water, approximately 1 MW of renewable electricity can be recovered at this location by upscaling the plant. It is to be expected that after this phase the installation could be further expanded to a final capacity of 200 MW.