RapidRide


RapidRide is a network of limited-stop bus routes with some bus rapid transit features in King County, Washington, operated by King County Metro. The network consists of six routes totaling 64 miles that carried riders on approximately 64,860 trips on an average weekday in 2016, comprising about 17 percent of King County Metro's total daily ridership.
RapidRide lines are faster than a typical local bus routes because they service fewer stops, make extensive use of transit signal priority to preempt traffic lights, and on some lines, use special lanes to bypass traffic. RapidRide lines runs no less than every 10 minutes during peak commuting hours and every 15 minutes on weekends and during most off-peak hours. Most lines also have night owl service.

History

The creation of the RapidRide network was one of the main elements of King County's "Transit Now" initiative that was proposed in April 2006 and approved by voters in November 2006. Funding for the construction and operation of the lines came from a 0.1% sales tax increase included in Transit Now, contributions from local cities and over $80 million in grants from state and federal agencies. One of the most notable local contributions was from Seattle, which funded traffic signal and roadway improvements with the city's "Bridging the Gap" property tax levy, passed at the same time as Transit Now in November 2006.
Transit Now called for a network of routes that included these bus rapid transit features:
These improvements were to be made on five key travel corridors identified in the initiative:
Planning and construction began shortly after approval of the measure. Along each of the corridors, fiber-optic cable was utilized to enable a Transit Signal Priority system, an automated vehicle location system and the features on "tech pylons" to be installed at certain locations.
Every stop along the line received some level of improvement, with the degree of investment determined by the ridership. All stops were enhanced with new concrete, RapidRide signage, and a new bus stop flag featuring route information, a solar-powered area light, and a stop request strobe light, to signal to drivers that a passenger is waiting. Additionally, moderately busy stops received new shelters, benches and trash cans. The busiest stops were improved into "stations" with large shelters and a "tech pylon" with an electronic real-time arrival sign, audible arrival information, a backlit route map, and an ORCA reader for off-board fare payment.
Shortly after the approval of Transit Now, Metro's revenues sales tax revenues saw a steep and prolonged decline. To combat the loss of income Metro underwent a series of efficiency measures, including restructuring routes to reduce operating costs. The RapidRide system was largely shielded from these cuts because federal and state grant funding helped pay for new buses and infrastructure. Also, in many cases, Metro actively restructured its network to shift riders to the new faster, high-capacity RapidRide routes.
The A Line between Federal Way and Tukwila International Boulevard station was the first to begin service on October 2, 2010, leveraging the pre-existing high-occupancy vehicle lanes on Pacific Highway South and International Boulevard. The line replaced Route 174, that mainly operated along the same corridor and complements the nearby Central Link light rail line that opened just months before the A Line. The A Line has terminals at the Tukwila International Boulevard Link station and the Federal Way Transit Center.
One year later on October 2, 2011, the B Line opened on the Eastside, connecting Redmond, Overlake, and Bellevue. The opening of the RapidRide corridor enabled a major restructure of most of the bus routes serving the Eastside. In addition to the B Line, three new routes were created, 11 routes received new a routing, and 13 routes were deleted.
Next up were the RapidRide corridors in Seattle, but the nationwide economic downturn forced Metro to create a lower cost routing than was proposed in the Transit Now measure. The connection between Ballard and the south downtown stadium area was scrapped in favor of interlining the West Seattle and Ballard lines. Upon reaching downtown, northbound C Line buses would change signs to continue north as the D Line and southbound D Line buses would change signs to continue south as the C Line. For riders, that meant that instead of running to the south downtown stadium area, the Ballard line would only reach the midtown area of Downtown Seattle. The move allowed King County Metro to purchase fewer buses and save on operations expenses. This interline was finally broken in March 2016 after the passage of Proposition 1 in the City of Seattle, dedicating additional tax revenue to support the Metro system.
After several months of outreach by the Seattle Department of Transportation, it was decided that the C Line would serve the Alaska Junction, the Fauntleroy ferry terminal and Westwood Village. For the D Line, the decision was made to serve Ballard High School and the Crown Hill neighborhood and offer frequent connecting service to the Ballard business district via Route 44 on NW Market Street and the new Route 40 on Leary Ave NW. In the years since the change, both Route 40 and 44 have become so popular that they are now scheduled to be converted into RapidRide corridors.
RapidRide service from Downtown Seattle to Ballard and West Seattle began on September 29, 2012. The opening of the new lines prompted a substantial restructuring of Metro's system in Seattle. Five new routes were created, dozens were revised, and 15 were deleted.
The third line to open in Seattle, was the E Line along Aurora Avenue North. It replaced one of the busiest and most infamous routes in Metro's system, the 358 Express. While the implementation of the E Line did not trigger another major restructuring of routes, it did require a major improvement project along Aurora Avenue. As part of the project, the cities of Seattle and Shoreline implemented BAT lanes along most of the corridor, reserving the outside lanes for buses and right-turning vehicles. The cities also made major improvements to pedestrian facilities along the corridor. The E Line opened on February 15, 2014 after several months of delays.
In late 2009, the construction of a sixth line was added to the system that would run between Burien and Renton in South King County. The King County Executive had initially dropped the line from the Transit Now initiative, but higher than expected tax revenue and lower than expected costs from the five initial lines, allowed the line to be funded. The F Line connects several major South King County transportation hubs including the Burien Transit Center, the Tukwila International Boulevard Link station, the transit center at Southcenter Mall, the Tukwila Sounder station, and the Renton Transit Center. The F Line was initially slated to replace Route 140, but an extension to the Boeing Renton Factory and the Renton Landing also allowed Metro to eliminate Route 110. The F Line began operation on June 7, 2014, after several months of delays.
In June 2015, midday frequencies were improved on the RapidRide C, D, and E Lines, bringing up Monday-Saturday daytime frequency from every 15 minutes to every 10–12 minutes to accommodate increased ridership. Following those changes, in March 2016, the RapidRide C and D Line were disconnected from one another. The D Line was extended to its original planned terminus in Pioneer Square, connecting riders better to South Downtown employment sites and visitors attractions. The C Line was extended into the vastly growing Denny Triangle and South Lake Union areas using new transit priority lanes on Westlake Avenue.

Lines

Current

RapidRide operates on six corridors totaling in length.
There are plans to add 13 new RapidRide corridors by 2025. The city of Seattle plans to pay for seven of the routes located primarily within its borders, while King County will locate the funding for the six routes in suburban areas outside of Seattle. The improvements are expected to be funded by federal and state grants. Additionally, the improvements in the city of Seattle will be partially funded by the "Move Seattle" property tax levy passed in November 2015. The network will create a grid of frequent bus lines connecting the major population centers in King County. In many cases, the opening of the routes is timed to coincide with the expansion of Sound Transit's Link light rail system.
The table below details the routing, project status, and expected opening of each RapidRide line expected to open before 2025.
King County also plans to add a further seven RapidRide routes between 2025 and 2040.
Project NameStatusExpected OpeningRoutingComparable RouteLength
G LineDesign2022Downtown Seattle – First HillCentral District via Madison Street11, 12
H LineDesign2021South Lake Union – Downtown Seattle – West Seattle – Burien via Delridge Way120
I LinePlanned2023Renton – Kent – Auburn169, 180
J LinePlanning2024RooseveltU-District – South Lake Union – Downtown Seattle via Roosevelt Way/11th Avenue and Eastlake Avenue67, 70
R LinePre-concept2024Downtown Seattle – Mount BakerRainier Valley via Rainier Avenue7
K LinePlanned2025Kirkland – Bellevue – Eastgate234, 235, 271
PlannedTBDBothellKenmoreLake City – U-District372
MarketPlannedTBDBallard – Wallingford – U-District via Market Street and N 45th Street44
FremontPlannedTBDNorthgate – Ballard – Fremont – South Lake Union – Downtown Seattle via Westlake Avenue40
PlannedTBDDes Moines – Kent – Covington – Auburn164, 166
23rdPlannedTBDMount Baker – Central District – U-District via 23rd Avenue48
PlannedTBDOverlake – Eastgate – Newcastle – Renton240, 245
PlannedTBDFederal Way – Auburn181

Stations and stops

Stops are farther apart than typical Metro service in order to increase speed and reliability, and create "stations" that are akin to what is found on light rail lines. The stations look different from normal bus stops and have "tech pylons" that feature ORCA card readers for off-board fare payment, real time information signs and automated voice announcements to communicate estimated arrival times of RapidRide buses. To increase security, stations are lit and are patrolled by transit police. Because of the frequent headways, riders do not have to wait as long at stations as they do at normal bus stops.

Equipment

RapidRide uses low-floor, diesel-electric hybrid articulated buses that are equipped three doors and painted with an identifiable look distinct from the buses used on other Metro routes.
RapidRide uses a proof-of-payment system: passengers who have a valid transfer or who tap their ORCA Card at an off-board validator can board any of the three doors on the bus; those who do not must board through the front door, pay their fare, and get a transfer, which serves as proof-of-payment. Fares are enforced through random spot checks by contracted fare inspectors who are assisted by Metro's transit police. Coaches feature racks for 3 bikes, Wi-Fi, and security cameras. RapidRide buses have fewer seats than similar articulated buses in Metro's fleet, allowing for more room for standing riders, which increases the total number of passengers the bus can carry.
Coaches were the first to feature on-board automated announcements and signage that inform riders of the next available stop as the vehicle approaches. Metro has since deployed the same technology to all buses in the fleet.
In 2010, New Flyer discontinued the "Advanced BRT" styling that was purchased for the coaches running the A Line. Later coaches were ordered with New Flyer's "Restyled" package and include one passive restraint for wheelchair users.

Fleet roster

Prototype bus photo sets

*
*
*