Rail transport in Cambodia
has of metre gauge rail network, consisting of two lines originally constructed during the time when the country was part of French Indochina. Due to neglect and damage from civil war during the latter half of the 20th century, the railways were in a dilapidated state and all services had been suspended by 2009. By 2016, freight and limited passenger service was available between Phnom Penh and Sihanoukville.
In July 2018, passenger trains were running from Phnom Penh to Sihanoukville every Friday afternoon at 15.00 and both Saturday and Sunday mornings at 07:30. The Phnom Penh to Sisophon line had been opened and trains ran for free until the end of August 2018.
Recent development
The railways were partially rehabilitated by the Government of Cambodia, with funding from the Asian Development Bank, Australian Agency for International Development and Australian company Toll Holdings, operated under the name Toll Royal Railways and to complete a missing link in the Trans-Asian Railway. The first line to be reopened as part of this project was the section between Phnom Penh and Touk Meas in October 2010. The complete Southern line to Sihanoukville Port opened for freight traffic in January 2013, some 18 months behind schedule.Toll Holdings divested their stake in 2014, with the company renamed Royal Railway Cambodia.
A new railway connecting Phnom Penh to Ho Chi Minh City is in planning, which would complete the rail link from Singapore to Kunming.
China Railway Group is planning to build a north–south railway across Cambodia, which would support planned expansion of the steel industry in Cambodia.
Scheduled passenger train services between Phnom Penh and Sihanoukville have resumed in May 2016 after having been suspended for 14 years. The line between the Thai border at Poipet and Battambang was under reconstruction as of 2017, with the remainder of the line between Battambang and Phnom Penh planned to be reconstructed at a cost of $150 million.
In April 2018, trains operated by Royal Railway began running express from Phnom Penh International Airport to Phnom Penh railway station. As of 2019, Royal Railway runs 44 trains each day, and 15–16 freight trains to Sihanoukville and Poipet.
In May 2019, by request of the Prime Minister, Hun Sen, a team from China Railway Construction Corporation arrived in Cambodia to conduct feasibility studies on railway upgrades, including bridge and track repairs, double tracking, Siem Reap - Phnom Penh - Doun Kaev - Kampot high-speed service, and rapid transit construction in Phnom Penh.
History
French colonial era
The French colonial government built the first line, running from Phnom Penh to Poipet on the Thai border, between 1930 and 1940, with Phnom Penh Railway Station opening in 1932. The final connection with Thailand was completed by Royal State Railways in 1942. However, the service from Bangkok to Battambang was suspended when the French Indochinese Government resumed sovereignty over Battambang and the Sisophon area from Thailand on 17 December 1946, as Thailand was seen as a supporter of Khmer Issarak, the anti-French, Khmer nationalist political movement.;Route
Phnom Penh – Pursat – Moung Ruessei – Battambang – Sisophon – Poipet
Late 20th century
In 1955 Australia donated rolling stock, described as "railway wagons of various types", worth at the time £A 441,000, and "needed for new rail links." Assistance from France, West Germany, and the People's Republic of China between 1960 and 1969 supported the construction of the second line, which runs from Phnom Penh to Sihanoukville on the southern coast to cut down the reliance on Saigon Port of Vietnam and Khlong Toei Port of Thailand. In 1960, Australia provided four third-class passenger carriages under the Colombo Plan. Rail service ceased during the war but resumed in the early 1980s. Guerrilla activities, however, continued to disrupt service.21st century
However, by 2008 the service between Phnom Penh and Battambang had been reduced from daily to weekly service due to the lack of funds to maintain the tracks and rolling stock. Even the new diesel-electric locomotives from China could not run on the tracks due to the dilapidated condition. Derailing of trains in operation was not infrequent. As reported by the Phnom Penh Post in October 2008, the national railway earned merely $2 million per year; the annual freight amount stood at 350,000, and the passenger count at 500,000.The last regular rail service in Cambodia between Phnom Penh and Battambang was suspended entirely in early 2009, however in June of that year Australian business Toll Holdings was awarded the contract to begin reconstruction of Cambodia's rail network and to operate it once complete. It is envisioned that this line would reopen by mid-2013, together with the track further west to the Thai border, allowing for direct rail services into Cambodia from Bangkok for the first time in over 60 years.
In March 2012, Toll said that it would suspend its involvement in the railway project due to delays, caused by lack of equipment, 2011's flood rains, and the resettlement of thousands of Cambodians. The line from Phnom Penh to the deep water port at Sihanoukville was also scheduled to be reopened in 2011. However, the company came back in late July and said it will start transporting construction materials needed to build the southern line from 1 August.
The Australian government and the Asian Development Bank was said to spend $26 million to help rebuild Cambodia's rail system, the majority of the Northern and Southern lines in Cambodia. The project, if all up, would cost $143 million, with the disruption exposed in a report by the international consortium funding the $143 million project – Australia's international aid agency AusAID and the Asian Development Bank. 641 kilometers of track will be rehabilitated with the aim of integrating Cambodia with the regional network such as Vietnam and Thailand; however,about 1,400 families who are living in shanty towns, have been affected and 1050 families have had to move. The report which was prepared by AusAID and Asian Development Bank experts in April 2012 pointed out poor construction and botched surveys leading to evictions of families, infighting between contractors, delays and cost overruns.
In June 2012, Cambodia was discussing with the Chinese government on funding for a 250-kilometre stretch of rail line between Cambodia and Vietnam. Var Sim Sorya, director general of Ministry of Public Works and Transportation said: "China doesn’t have so many conditions, but Chinese technicians are still well-studied," he said yesterday at a workshop on infrastructure, although he did not specify which conditions were undesirable.
The line between Phnom Penh and the South opened to travellers on April 9, 2016.
It was announced in March 2018 that the line from Poipet to Sisophon would begin operations on April 4, 2018. Subsequently, operations were further extended to Battambang on 29 April, with plans to open the line to Pursat on 29 May. It was also reported that new railway routes were being studied by private companies.
Statistics
Historical
;Royal Cambodian Railways- Date: c. 1956
- Route: Connections with railways in Thailand and Vietnam
- Gauge:
- Route length: 242 miles
- Locomotives: 23 – it appears that 19 of these still exist and one is operational
Locomotives
Railway links with adjacent countries
- Thailand – yes – same gauge
- Laos – no – same gauge – indirectly via Thailand
- Vietnam – no – under construction – same gauge
Timeline
2006
- Trans-Asian Railway network planned -
- Link proposed Aranyaprathet, Thailand to Sisophon, Cambodia
- Malaysia offer to donate rails and sleepers to Cambodia, to help them complete the missing links, which would be of value to all countries in the vicinity.
- 17 November 2006 – To complete a missing link in the Singapore-Kunming rail route, Malaysia has donated rails to Cambodia which will be used to connect Poipet to Sisophon. According to Transport Minister Datuk Seri Chan Kong Choy, the rail was lifted from the old Rawang-Ipoh section where a new electrified double line has been built. A link between Cambodia and Vietnam including a crossing of the Mekong River is still required. The completed Singapore-Kunming line is expected to promote increased trade with China.
- 16 December 2006 – The Asian Development Bank is advancing a loan together with the donation in kind of rails from Malaysia will see restoration of the link with Thailand.
2007
- ADB and OPEC agree to lend $80m for Aranyaprathet to Sisophon link with completion in 2010.
- $500m is needed for another 254 km link from Phnom Penh to Lộc Ninh.
2008
- November, 2008 – agreement for Vietnam – Cambodia link
- October–November: A 30-year agreement is prepared with Australia's Toll Holdings to upgrade the national railway system, restore the link from the present western railhead at Sisophon to the Thai railhead at Poipet, and to construct a new 225-km line linking Cambodian railways to the Vietnamese railhead of Lộc Ninh. The renovation of the existing lines, to be carried out in 50 km segments, is expected to take 2–3 years. The link to Vietnam would involve construction of two major bridges: one across the Tonlé Sap River, and another across the Mekong River in Kampong Cham Province. The Cambodian government is hoping to get assistance from China to finance the project.
2009
- June 12 Toll Holdings and Royal Group sign concession agreement.
2010
- October Touk Meas to Phnom Penh reopens for freight.
2012
- March Toll Holdings publicly announced that it would suspend its work for a year due to refurbishment delays.
- August 1 the company started transporting construction materials to build the Southern line.
2014
- July 25 a ground-breaking ceremony was held in Poipet as work to reinstate the cross-border railway to Thailand was begun.
2015
- August work is expected to begin on rehabilitation of the line between Phnom Penh and Sisophon.
2016
- April 9 – Opening to travellers of the line Phnom Penh and the South.
2018
- April 4 – Opening of the line between Poipet and Sisophon
- April 29 – Extension of service from Sisophon to Battambang
- May 29 – Extension of service from Battambang to Pursat
- July 4 – Extension of service from Pursat to Phnom Penh
2019
- April 22 – Resumption of cross-border rail service between Poipet and Aranyaprathet.
Bamboo Railway