Porto Alegre Metro


The Porto Alegre Metro is operated jointly by the federal government, the state government of Rio Grande do Sul and the city of Porto Alegre through the company Trensurb in Brasil. It has 22 stations, totaling of route, and carries about 175,000 users a day.

History

The Line 1 of the subway built in Porto Alegre was started in 1980, linking the center of Porto Alegre to cities to the north of the metropolitan area, as Canoas, Esteio, Sapucaia do Sul, São Leopoldo and Novo Hamburgo. The choice of path was made to relieve the heavy traffic of highway BR-116, the only option before the construction of this line, which already had serious problems with the transit at the time.
The Line 1 was inaugurated on March 2, 1985 between the Central Public Market and Sapucaia do Sul, covering a route of and 15 stations.

Extensions

In December 1997, the line was extended to Unisinos.
A extension to São Leopoldo-Museum was added in November 2000, after two months of trial service.
A further extension to Novo Hamburgo opened in two phases: a, two station stretch opened in July 2012, followed by the final, three station stretch on December 21, 2013.

Operations

System characteristics

The Porto Alegre Rapid Transit has an average distance between each station of. The average speed of trains is, while the maximum speed is. The rail gauge is , with power supplied to the trains by a 3,000 VDC catenary.

Lines


'' Link the Trensurb's Airport Station to the International Airport Salgado Filho

Airport connection people mover

Construction of a single-line fully automated people mover connecting the Estação Aeroporto and Terminal 1 of Salgado Filho International Airport has been completed. The line has been operational since August 2013. It is a part of the Porto Alegre Metro system so users do not need to purchase a separate ticket. The journey time is 90 seconds. Depending on demand, one or two vehicles, will operate at any one time. Cost of construction was R$37.8 million with demand projected at 7,700 passengers per day. In the period 1 May 2014 to 7 September 2014, following the introduction of fare collection, the service averaged 3,165 passengers per day with a peak of 4,134 on 5 September 2014.
This is the first commercial installation in the world of the Aeromovel design, an atmospheric railway technology first developed in Porto Alegre in the late 1970s.

Future expansion

Line 2 of the metro is proposed to consist of a route from the city centre to Cachoeirinha, of which around half will be underground. In 2019, the estimated cost of the line was $2.9 billion.