Porter station


Porter is a Massachusetts Bay Transportation Authority transit station in Cambridge, Massachusetts. It serves the Red Line rapid transit line, the MBTA Commuter Rail Fitchburg Line, and several MBTA bus lines. Located at Porter Square at the intersection of Massachusetts and Somerville Avenues, the station provides rapid transit access to northern Cambridge and the western portions of Somerville. Porter is 14 minutes from Park Street on the Red Line, and about 10 minutes from North Station on commuter rail trains. Several local MBTA bus routes also stop at the station.
A series of commuter rail depots have been located at Porter Square under various names since the 1840s. The modern station with both subway and commuter rail levels was designed by Cambridge Seven Associates and opened on December 8, 1984. At below ground, the subway section is the deepest station on the MBTA system. The station originally had six artworks installed as part of the Arts on the Line program; five remain, including Gift of the Wind and Glove Cycle.

History

Early history

There has been a railroad station at Porter Square since the Fitchburg Railroad began operations in the early 1840s. The first station, built in 1843–1845, was called Porter's Station. Later stations at the site were known as North Cambridge, then later simply as Cambridge. In 1869, the original station was moved to the North Avenue bridge over the tracks.

B&M era

A new station was built in 1897, slightly to the southeast, behind the Lovell Block. In 1927, the Fitchburg Cutoff became freight-only between the Alewife area and Somerville Junction. Passenger trains from the Lexington Branch and the Central Massachusetts Railroad were diverted to the Fitchburg mainline and began to stop at Cambridge station. In 1937, the Boston and Maine Railroad built a two-story brick depot by the bridge, with the ticket office at street level and the waiting room and platforms below.

MBTA era

By the time the newly formed Massachusetts Bay Transportation Authority began subsidizing northside commuter rail operations in the late 1960s, both the Lexington Branch and the Central Mass Branch had been reduced to single rush hour round trips on poorly maintained track. The South Sudbury run on the Central Mass was terminated on November 26, 1971. The Bedford round trip on the Lexington Branch ended after a major snowstorm on January 10, 1977, leaving the Fitchburg Line as the only rail service at Cambridge station.

Adding the Red Line

In the late 1970s, Cambridge station was renamed to Porter when it became certain that the Red Line Northwest Extension would include a stop there. The Red Line platforms were built in a deep-bore tunnel, while the commuter platform was rebuilt with an accessible mini-high platform. During construction, commuter trains were accessed via a still-extant staircase from Somerville Avenue.
A new glass and concrete headhouse was built around 1982, and the complete new transfer station opened on December 8, 1984 along with. The new station, designed by Cambridge Seven Associates, won awards from the American Institute of Architects and the American Consulting Engineering Council of New England. Porter and Davis were the first MBTA stations made accessible during initial construction, rather than by renovation.
Because of its Red Line connection, Porter Square can serve as a temporary inbound terminus for the Fitchburg Line service when commuter rail service is disrupted between Porter and Boston's North Station. It served this role during the 2004 Democratic National Convention, when North Station was closed for a week for security purposes, and during Green Line Extension construction in 2015 and 2017.

Station layout

Porter station has a glass-covered headhouse located on the east side of Massachusetts Avenue just south of Somerville Avenue. The station has four below-ground levels.. The Fitchburg Line runs approximately east-west in an open cut, with a single island platform between the two tracks. Most of the platform is low, with a raised mini-high platform at the west end under Massachusetts Avenue. Direct stair entrances to the platform are located on both sides of Massachusetts Avenue.
A mezzanine, partially under Somerville Avenue east of White Street, is one level deeper. It contains fare machines, faregates for the Red Line, a convenience store, and – unusually for the MBTA system – public restrooms. Stairs, escalators, and elevators connect the mezzanine to the platforms and the surface.
South of Porter Square, the Red Line runs north-south under Massachusetts Avenue. North of the square, the avenue turns to the northwest, while the Red Line runs north in a deep-bored tunnel to Davis Square. The Red Line platforms are mostly north of the headhouse, partially under the Porter Square Shopping Center. The subway tracks and platforms are enclosed in a single cylindrical concrete shell. The two platforms are at different levels, with the inbound platform above and laterally offset from the outbound platform. The platforms are near the center of the shell, with the outbound track on the east side ad the inbound track on the west side.
At 105 feet below ground level, the outbound platform is the deepest in the MBTA system. Porter's unusual depth is due to the MBTA's decision to build the station in bedrock rather than soft clay, saving time and money in the construction process. Passengers reach Red Line platforms via a series of escalators, stairs totalling 199 steps, or a set of elevators. The longest single span of the escalators is, the longest in the MBTA system. In 2005, a man was killed when his sweatshirt tangled in the bottom of the escalator.

Accessibility

Porter is fully accessible; elevators lead from street level to the mezzanine with its accessible bathrooms, to the commuter rail platform, and to both Red Line platform levels. Although most of the commuter platform is low, there is a "mini-high platform" – a one-car-length high section – that allows level boarding.
The station was originally built with three elevators: from Elm Street to the fare lobby, from the lobby to both Red Line platforms, and from the lobby to the commuter rail platform. The MBTA installed additional elevators at Porter and four other busy MBTA subway stations as part of the settlement of Joanne Daniels-Finegold, et al. v. MBTA. The three existing elevators were overhauled, and two redundant elevators were added, in a $12 million project.
The elevator to the Red Line platforms was out of service for construction from March 21, 2011 to June 22, 2012; an accessible shuttle bus ran between Porter and. The elevator to the commuter rail platform was also taken out of service from December 9, 2011 to July 2012; a shuttle bus ran between, Porter, and. An elevator from Massachusetts Avenue to the lobby opened later that year, followed by an overhaul of the existing street elevator; the redundant Red Line platform elevator was completed in 2013.

Arts on the Line

As a part of the Red Line Northwest Extension, Porter was included as one of the stations involved in the Arts on the Line program, devised to bring art into the MBTA's subway stations in the late 1970s and early 1980s. It was the first program of its kind in the United States and became the model for similar drives for art across the country.
Six works, five of which remain, were placed at Porter:
Porter serves several MBTA bus local routes:
The 77 and 96 run on Massachusetts Avenue, while the 83 turns from Somerville Avenue to Massachusetts Avenue at Porter Square. Additionally, route stops on Elm Street at the Porter Square Shopping Center, one block northeast of Porter station.
The short turn of the 77 operates as a trolleybus on a limited number of runs, as trolleybuses on other routes are brought to and from the North Cambridge Carhouse.