Petronas Tower 3
The 60-storey Petronas Tower 3, previously known as Carigali Tower, is a skyscraper located in KLCC Kuala Lumpur. The building features a 6-level extension to the Suria KLCC shopping mall, while the rest of the floors above are solely made up of office spaces. It is the headquarters of Petronas Carigali, the E&P subsidiary of PETRONAS and some of the local subsidiary of Multinational Corporations such as Microsoft Malaysia. Along with the Kuala Lumpur Convention Centre and the Binjai condominium, development of Lot C falls under Phase 2 of the KLCC project. Development cost is reported at RM1 billion.Construction
Ground breaking started in late 2006 and finished in February 2009. In January 2009, KLCC Properties Holdings Berhad awarded a RM665mil contract for the superstructure to Daewoo Engineering and Construction, which began building the top structure in March 2009.
The retail mall section is expected to be ready by 2010, followed by the office block component by October 2011. The office tower will house net lettable office space, while the retail portion of the building will measure. The development will also feature a tunnel link to the adjacent Lot D1, KLCC for future development.