Pelton Dam is a major dam on the Deschutes River in Jefferson County, Oregon, owned and operated as a hydroelectric facility by Portland General Electric, one element of its Pelton Round Butte Project on the Deschutes.
The concrete arch dam at Pelton dates from 1958, has a height of from bedrock, a width of at its crest, and generates 110 megawatts of electricity.
Upstream, to the south, Pelton Dam impounds the waters of the Deschutes to create the deep Lake Simtustus in a relatively narrow canyon about back to the 1964 Round Butte Dam. The lake has a surface area of about and holds of water. The name "Simtustus" honors a native who scouted for the U.S. Army during the 1867–68 campaign against the Paiutes.
Downstream, north, a regulating dam controls the river flow. The area between is called the Pelton Regulating Reservoir. In 1982 the Confederated Tribes of Warm Springs installed a hydroelectric turbine unit in the regulating dam for additional power. Between 2000 and 2005 the CTWS also asserted itself as a stakeholder in the project's re-licensing negotiations between Portland General Electric and the Federal Energy Regulatory Commission, winning key environmental, cultural, and water rights concessions.