Peñitas Dam


The Peñitas Dam, also known as Ángel Albino Corzo, is a dam with a hydro-electric power station on the river Rio Grijalva, 83 km south west of the city of Villahermosa, lying in the municipality of Ostuacán in the state of Chiapas in southern Mexico. The power station has an installed production effect of 420 MW from four turbines, and an annual production of 2.035 TWh.

History

Construction on the dam began in 1979 and the river was diverted in October 1983. In June 1986, the dam structure was complete along with the right spillway and by July of that year, the dam began to impound its reservoir. By August, the spillway was tested; the left spillway would not be completed until July 1987. The dam's first generator was commissioned in January 1987 and the last on 15 September of the same year. Floods in 1999 and 2007 tested the limited flood protection of the dam as the Tabasco Flatlands were flooded and over one million residents effected. The Government of Mexico has initiated a project to expand the flood capacity of the dam which is still in planning stages.
In the Rio Griljava-Mexcalapa watercourse are installed a hydro-electric power capacity of 2,750 MW with an annual capacity of almost 15 TWh. The power stations are: