The program for nuclear power in Indonesia includes plans to build nuclear reactors in the country for peaceful purposes. The national legislative organ for nuclear energy, Badan Pengawas Tenaga Nuklir, was founded in 1998. The national agency for atomic energy is BATAN.
History
In 1954, research on atomic energy began in Indonesia. Apart from producing electricity, nuclear technology is also used for medical and agricultural purposes and for food safety. Plans for an atomic program were scaled back in 1997 due to the discovery of the Natuna gas field, but have since revived since 2005.According to Presidential Decree Five in 2006, Indonesia should have four nuclear-power plants built by 2025. Their total capacity will be at least 4,000 MW of electricity, about 1.96 percent of projected electricity demand in 2025. Indonesia has stated that the program will be developed in accordance with the International Atomic Energy Agency, and Mohammed ElBaradei was invited to visit the country in December 2006. Protests against plans for nuclear power were held in June 2007 in central Java, and increased in mid-2007.
In December 2013 it was reported that Indonesia was planning to begin constructing a reactor in 2015. In February 2014 the Indonesian Government confirmed that it was planning to construct a 30MW reactor in the near future. However, as of December 2015, Indonesia will not resort to nuclear energy to meet its target of 136.7 gigawatt of power capacity by 2025 and 430 gigawatt by 2050.
In August 2016, CNEC and BATAN agreed to jointly develop a HTGR in Indonesia.
Indonesia and International Nuclear co-operation
Indonesia is a member of the IAEA, and a signatory to the NPT.Comprehensive Nuclear-Test-Ban Treaty
On December 6, 2011 the Indonesian Parliament ratified the Comprehensive Nuclear-Test-Ban Treaty. Indonesia agreed not to conduct nuclear-weapons testing, but nuclear power plants are unaffected.Cooperation with other countries
In 2006 Indonesia signed treaties for nuclear cooperation with a number of countries, including South Korea, Russia, Australia and the United States. Australia has indicated its willingness to supply Indonesia with uranium for peaceful purposes. A well-publicized agreement with a Russian company to build a floating nuclear reactor in Gorontalo ran aground; Indonesia has since made it clear that it wants a higher-capacity nuclear power plant, and will construct a land-based plant. In mid-2014, BATAN and Russia's state-owned Rosatom have signed an agreement for developing the Indonesia's first nuclear power plant.IAEA appraisal
The International Atomic Energy Agency considers Indonesia ready to develop nuclear energy in a statement issued in November 2009. Its appraisal considered four readiness aspects: human resources, stakeholders, industry and regulations. The Indonesian Nuclear Board has carried out research since the 1980s.National Nuclear Energy Agency (BATAN)
BATAN is Indonesia's National Nuclear Energy Agency; it is an Executive Agency based in Indonesia as referred to in Indonesia Law Number 10 of Year 1997 on Nuclear Power, also in Indonesia Presidential Regulation No. 46. In 2013 BATAN is referred to as Non-Ministerial Government Institution responsible to the President via the Ministry of Research-Technology and Higher Education.BATAN has the task of carrying out Indonesian governmental duties in the field of research, development and utilization of nuclear science and technology in accordance to the provisions of the legislation.
BATAN exported a small amount of molybdenum-99 fission material to Malaysia, the Philippines and Bangladesh in 2011. Due to a drop in world radioisotope production and increased demand from China and Japan, BATAN will invest Rp 100 billion to increase its production capacity to 900 Ci per week. Full capacity could be realized in 2013, but large-scale exports are possible by late 2012.
Reactor locations
For research purposes, the following experimental nuclear reactors have already been built in Indonesia:- Kartini nuclear research reactor in Sleman, Daerah Istimewa Yogyakarta
- MPR RSG-GA Siwabessy nuclear research reactor in Serpong, Banten
- Triga Mark III nuclear research reactor in Bandung, West Java
BATAN continues searching for uranium sources and suitable sites for nuclear power plants. Bangka Belitung is geologically stable and near the country's greatest electricity-consuming regions: Java and Sumatra. Local residents are more receptive to hosting a nuclear power plant, compared with other locations. Although local residents were opposed, BATAN was still considering the previously-studied locations of Mount Muria, Jepara, Central Java and Serang, Banten.
In July 2011, the Bangka Belitung governor requested the government to continue its plans for nuclear power plants in the Muntok and Permis areas between 2025 and 2030. The two plants will produce two gigawatts of electricity at a cost of Rp 70 trillion, producing 40 percent of electricity needs in Sumatra, Java and Bali.
Several locations have been proposed for nuclear reactors to generate electricity:
- Cape Muria, Kudus
- Gorontalo, in northernSulawesi
- Bangka Belitung province
- Kalimantan
Proposals
A physics lecturer from Airlangga University has stated that the need for electricity continues to increase, while fossil-fuel reserves are being depleted; Indonesia is ready and able to develop a nuclear-power plant. Nuclear experts have conducted nuclear research since the 1970s. The Indonesian Nuclear Energy Regulation Agency BAPETEN has confirmed that seven nuclear supervisors were on IAEA missions in several countries, and Indonesia is ready to operate nuclear power plants as soon as those facilities are built.Despite the Fukushima nuclear disaster, Indonesia is unlikely to halt its plan to build its first nuclear-power plant due to an electricity crisis. A nuclear-energy development head at Indonesia's National Nuclear Energy Agency said that concerns about a disaster such as Japan's were misplaced; plants in Indonesia would use more advanced technology than the four-decade-old reactors at the Fukushima plant in Japan. Modern plants are designed to operate in the circumstances of total power failure like that experienced at Fukushima, relying on passive safety systems that do not require electricity to function.
P3Tek, an agency within the department of energy, has recommended the TMSR-500 molten salt reactor by ThorCon. The TMSR-500 is fueled by a mix of uranium and thorium.
https://www.nextbigfuture.com/2019/09/p3tek-recommends-thorcon-molten-salt-nuclear-reactor-for-indonesia.html
Natural resources
Indonesia has at least two uranium mines: the Remaja-Hitam and Rirang-Tanah Merah mines, located in western Kalimantan. If these prove insufficient, the country may import uranium.National Nuclear Energy Agency predicted that Indonesia has 70,000 tonnes of uranium reserves and 170,000 tonnes thorium reserves. Mostly Uranium found in West Kalimantan and the rest in Papua, Bangka Belitung and West Sulawesi, while Thorium found mostly in Bangka Belitung and the rest in West Kalimantan. In Mamuju Regency, West Sulawesi, Uranium is detected about 100–1.500 ppm and Thorium about 400–1.800 ppm. Singkep district, Mamuju Regency has the highest Gamma Radiation in Indonesia.
To commercialize the uranium and other radioactive materials, first parliament should amended the Law No. 10/1997 on Nuclear Energy which does not allow domestic or foreign investors to exploit radioactive resources for commercial purposes.