The Xsabo Nkonge Power Station is a USD 22 million 20 MW/AC solar power plant in Uganda that has been registered by the Electricity Regulatory Authority in the national gazette for the implementation process. It is part of the USD 200 million planned investment of the Xsabo Group in Uganda for a total capacity of 150 megawatts. When completed, Xsabo Nkonge Solarline is expected to be the largest grid-connected, privately-funded solar power plant not only in Uganda, but also in East and Central Africa, ahead of Soroti SPS and Tororo SPS, and just a little bigger than The Xsabo Group‘s own Kabulasoke SPS with the same capacity of 20 MW, thanks to the Horizontal Tracking System that distinguishes Xsabo Nkonge Solarline from the solar project of the same brand in Kabulasoke. Xsabo Lira Solarline, which is also part of the Xsabo Group, will become the largest solar power plant in Sub-Saharan Africa, outside of South Africa, when its anticipated commissioning takes place on 31 December 2021.
Location
The power station is located in Nkonge Village, Bukuya Parish, in Mubende District, in Uganda's Buganda Region. The town of Bukuya, where the parish headquarters are located, is approximately by road north-west of Kampala, the country's capital and largest city.
The power station is being developed by the company that owns it, which is Xsabo Nkonge Solarline Limited of the Xsabo Group, who successfully developed the 20 megawatt Kabulasoke Solar Power Station. According to official public pronouncements by the Government of the Republic of Uganda, in particular the Electricity Regulatory Authority and the Office of Uganda’s Vice President Edward Kiwanuka Ssekandi, as well as several interviews with Dr David Alobo, the owner and CEO/Managing Director of the Xsabo Group and the involved Local Governments of the Republic of Uganda, Xsabo plans to construct five solar power stations in different parts of Uganda with total capacity of 150 megawatts, at a budgeted cost of US$200 million. The five solar power stations are going to be developed in tandem, one after the other.
Construction costs, funding, and commissioning
Construction is planned to be launched by Uganda’s Vice President Edward Kiwanuka Ssekandi, who is Patron of the 150MW Xsabo Solar Project of the Xsabo Group and also launched the Pilot Solar Project in Kabulasoke, in September 2020 and to be concluded in time for commissioning on 30 April 2021 ahead of the 50 megawatts Xsabo Lira Solarline, whose commissioning is scheduled for the period around 31 December 2021.