Network Rail Route 7 (Great Eastern)


Strategic Route 7 - Great Eastern was the designation given by Network Rail, from 2004 to 2009, to a grouping of railway lines in the East of England that encompassed the Great Eastern Main Line and its various branch lines. The route serviced the regional centres of Colchester, Ipswich and Norwich as well as the ports of Felixstowe and Harwich.
In 2010, Network Rail restructured its route categorisation. Routes 5 and 7 were merged into Strategic Route D: East Anglia.

Strategic route sections

The Route was divided into a number of separate Strategic Route Sections that were defined based on route use, infrastructure and historical lines.
RouteStrategic Route Sections Corresponding historical lines
Route 7 –
Great Eastern
07.01 - Liverpool Street – ShenfieldGreat Eastern Main Line
Route 7 –
Great Eastern
07.02 - Shenfield–IpswichGreat Eastern Main Line
Route 7 –
Great Eastern
07.03 - Ipswich–NorwichGreat Eastern Main Line
Route 7 –
Great Eastern
07.04 - Freight linesfreight-only lines within area covered
Route 7 –
Great Eastern
07.05 - Shenfield–Southend Victoria/SouthminsterCrouch Valley line, Shenfield–Southend line
Route 7 –
Great Eastern
07.06 - Braintree branchBraintree branch line
Route 7 –
Great Eastern
07.07 - Harwich branchMayflower line
Route 7 –
Great Eastern
07.08 - Walton and Clacton BranchesSunshine Coast Line
Route 7 –
Great Eastern
07.09 - Romford–UpminsterRomford–Upminster line
Route 7 –
Great Eastern
07.10 - Sudbury to Marks TeyGainsborough line
Route 7 –
Great Eastern
07.11 - East Suffolk line and Norfolk branchesBittern Line, East Suffolk line, Wherry Lines
Route 7 –
Great Eastern
07.12 - Felixstowe–Ipswich YardFelixstowe branch line

Railway planning

As part of Network Rail's Strategic Business Plan a Route Plan for each route, including Route 7, was published annually. The Route 7 plans for 2008 and 2009 are made available online.
Together with Route 5West Anglia and Route 6North London Line and Thameside the route was included in the Greater Anglia Route Utilisation Strategy.

Proposed developments

The Greater Anglia RUS includes a number of proposals for the future development of the route.
In the medium term, 2009–14, this includes minor infrastructure works and additional rolling stock to allow main line peak-service trains to be extended to 12-car formation.
Also included is the proposal for the extension of platforms at Stratford to handle 12 cars, to allow all main line peak-service trains to be extended to 8 or 12-car formation.
In the longer term intentions are to continue the lengthening of peak trains to 12-car formation. Enhancements to the power supply of the route are intended for completion by 2012 to interface with those carried out on Route 5 and Route 6.