The Swiss National Redoubt was a defensive plan developed by the Swiss government beginning in the 1880s to respond to foreign invasion. In the opening years of the Second World War the plan was expanded and refined to deal with a potential German invasion. The term "National Redoubt" primarily refers to the fortifications begun in the 1880s that secured the mountainous central part of Switzerland, providing a defended refuge for a retreating Swiss Army.
The National Redoubt encompassed a widely distributed set of fortifications on a general east-west line through the Alps, centering on three major fortress complexes: Fortresses St. Maurice, St. Gotthard, and Sargans. These fortresses primarily defended the alpine crossings between Germany and Italy and were outside the industrialized and populated regions of Switzerland. These regions were defended by the "Border Line", and the "Army Position" somewhat farther back. While not intended as an impassable barrier, these lines contained significant fortifications, but the National Redoubt was planned as a nearly impregnable complex of fortifications that would deny an aggressor passage over or through the Alps by controlling the major mountain passes and railway tunnels running north-to-south through the region. This strategy was intended to deter an invasion altogether by denying Switzerland's crucial transportation infrastructure to an aggressor.
The National Redoubt has been the subject of debate in Swiss society, with many fortifications decommissioned by the early 21st century.
''Réduit'' in the Swiss Alps
The concept of "réduit" is a recurring theme in Swiss defense theory. Having stayed neutral during World War II, Switzerland retained the concept for its plans of resistance against a putative Soviet invasion during the Cold War, when it became a strong influence on the Swiss concept of neutrality.History
Fortification of the Swiss alpine region began in the 1880s, shortly after the opening of the Gotthard railway. Forts similar to those of Belgian military engineer Henri Alexis Brialmont were built at Airolo, the Oberalp Pass, Furka Pass, and Grimsel Pass, all in the Central Alps. Additional positions were constructed in the area of Saint-Maurice, using mining and tunneling techniques in the steep mountainsides of the glacial valley.In the immediate aftermath of World War I, there was little Swiss interest in further fortifications. However, during the 1930s, as France built the Maginot Line from its Swiss border to its Belgian, and Czechoslovakia built the Czechoslovak border fortifications, Switzerland re-examined its fixed defenses. At the same time, job creation programs became desirable as a result of the worldwide Great Depression. Design work began in 1935, and in 1937 construction began on the expanded Alpine fortifications, the Border Line, and the Army line fortifications.
Guisan plan
General Henri Guisan developed a strategy for the defense of Switzerland that recognized Switzerland's limited resources in equipment and manpower compared to its potential adversaries. Guisan proposed a delaying strategy in the broken terrain of the borders to keep an invading force out of the open country in the central plateau for as long as possible, allowing an orderly retreat to the secured Alpine perimeter. Once the retreat to the Alps was complete, the Swiss government could remain in hiding for an extended time. Accordingly, the border fortifications were improved with major programs along the Rhine and at Vallorbe in the Jura. The strategic Alpine nodes of Saint-Maurice, Saint Gotthard, and Sargans were identified as the primary points of access to the Alpine redoubt for a potential aggressor. While Saint Gotthard and Saint-Maurice had been previously fortified, the area of Sargans was newly vulnerable, owing to a drainage program of former wetlands along the Rhine that would now provide easy access to the eastern Alpine gateway at Sargans.Debate continued over the extent of the Redoubt under the Guisan plan. A proposal was developed by officers from German-speaking cantons, advocating a more compact redoubt. This was overcome by a proposal, authored by Guisan's chief of staff, Colonel Samuel Gonard, whose plan ratified the Saint-Maurice - Saint Gotthard - Sargans strategy, prefaced by a defense in depth. Additional impetus was provided by the fall of France in June 1940. Two days after the French surrender, on 23 June, the border zones were reduced in priority in favor of the "advanced position" or Army Line. The army was shifted to the center of the country, leaving industries and population centers relatively unprotected. The final Guisan plan, adopted on 12 July 1940, defined an organized retreat to the Alps, where supplies would be stocked for an indefinite resistance with no thought of further retreat. On 25 July 1940, the Swiss defensive plan was disseminated, dictating a fallback to the Alps in the event of an Axis attack, focusing in particular on the Gotthard massif and destroying all access points as necessary once inside.
The National Redoubt strategy was emphasized on 24 May 1941. Until this time only about two thirds of the Swiss Army had been mobilized. Following the swift overrunning of the Balkan countries by German forces in April 1941, in which relatively low mountains had proven to be little barrier to the aggressive German forces, the entire Swiss army was mobilized. The Swiss, lacking a significant armored force, drew the conclusion that withdrawal to the Redoubt was the only sound course. Any actions in the Central Plateau would be delaying actions only. This was publicly reported after Switzerland was surrounded by German and Italian forces, Guisan revealed on 25 July 1940 at the so-called Rütlirapport, a historic and highly-symbolic meeting of the Swiss army staff and the entire officer corps at the founding site of the Swiss confederation, that in case of attack the Swiss would only defend the high Alps including the important transalpine roads and rail links. As a last resort, the army would make these routes useless to the Axis by destroying key bridges and tunnels. This plan meant that the populated lowlands - including the economic centres of the country - would be effectively ceded to the Germans. The gold reserves of the Swiss National Bank in Zürich were moved farther away from the German border, to the Gotthard Pass and Berne.
World War II
The National Redoubt assumed great importance to the Swiss in 1940, when they were entirely surrounded by Axis powers, and hence effectively at the mercy of Hitler and Mussolini. The National Redoubt was a way to preserve at least part of Swiss territory in the event of an invasion. The Redoubt was to be manned by eight infantry divisions and three mountain brigades; the Swiss practiced for war by imitating the battles occurring around them.Switzerland's Réduit strategy during World War II was essentially one of deterrence. The idea was to make clear to the Third Reich that an invasion would have a high cost. Simultaneously, economic concessions were made to Germany in the hope that the overall cost of a German invasion would be perceived as higher than the potential benefits. Despite this, it is clear that Hitler intended to invade eventually and that the Allied landing at Normandy as well as the difficulties faced in invading Russia were pivotal in merely delaying an invasion. Concessions included a national blackout, and the destruction of a secret German radar system that had accidentally landed in Switzerland in exchange for a dozen aircraft. In their invasion plan, Operation Tannenbaum, Germany planned to capture Geneva and Lucerne while Italy would capture the Alps; the two countries would divide Switzerland.
Cold War
Swiss policy during the Cold War adopted a more aggressive defense of the borders, relying less on a retreat to the mountains. While Switzerland was again surrounded by an alliance, NATO was not considered a threat to Swiss national existence; however Warsaw Pact nations were considered threats. The Swiss strategy sought to exact a high price from any direct ground attack on Swiss territory. Control of the Alpine crossings remained a cornerstone of the Swiss strategy of neutrality. The dense network of passive and active barriers and large and small fortifications allowed considerable flexibility in the disposition of Swiss forces, and represented an almost optimal scenario of defense in depth.The strategic importance of the Alpine crossings had only increased since the Second World War, and any incursion by Warsaw Pact forces would require that they either be taken, or that terms for their use would need to be agreed upon to the satisfaction of Switzerland.
In 1953, Swiss policy was formalized to place greater emphasis on the defense of the borders and population centers, and to extend the concept of defense in depth, pioneered in the Redoubt, to the entire Swiss territory. This corresponded to an unspoken reliance on cooperation with NATO to secure the flanks of Swiss territory and to resupply Swiss forces, which already purchased equipment from members of NATO. The Redoubt, with its determinedly neutralist connotations, lost priority.
Many billions of francs have been invested in building the fortifications in the mountains, which are partly still used by the army. The most important buildings of the Réduit were the fortifications of Sargans, St. Maurice, and the Gotthard region. At the time, caverns in these areas were equipped with essential military infrastructure. Besides cannons and howitzers, this infrastructure consisted of dormitories, kitchens, field hospitals, rooms for the sick and bakeries; as well as providing enough space to accommodate 100 to 600 soldiers for up to several months. Because tensions between the western countries and the USSR cooled down and bunkers became increasingly obsolete because of newer weapon systems, a great number of the Réduit buildings were closed in the aftermath of the Cold War, in the mid-to-late 1990s and early 2000s. Some of them have been reopened as museums and can be visited.
Comparison with contemporary projects
The National Redoubt fortifications, when compared to contemporary French, Belgian, German, or Czech fortifications, were much more extensive and heavily armed than the Maginot Line, the Belgian border fortifications, the Siegfried Line, or the Czechoslovak border fortifications. While the Maginot fortifications were typically armed with short-barreled 75mm fortress howitzers or 120mm mortar/howitzers, the Swiss fortifications were armed with 75mm and 120mm guns, upgraded in the 1950s to 105mm and 150mm guns. The Swiss guns were typically casemate-mounted or turret-mounted long guns, not howitzers, and were more akin to naval guns than fortress guns. Because they were typically mounted on inaccessible cliffs or plateaus with an advantage of enfilade over any possible opposing force, they were not exposed to infantry attack or direct artillery fire and could afford to have exposed gun barrels. The French positions, which could be targeted by anti-tank weapons or infantry, avoided any exposed gun tubes.Fortress St. Gotthard
Airolo positions
Fort Airolo, also known as Forte di Airolo, was built between 1887 and 1890 at the southern end of the Gotthard Pass overlooking Airolo. The fort was a compact massif similar to a Brialmont fort, with an encircling ditch defended by caponiers and provided with a twin 120mm gun turret and four 53mm gun turrets for close defense, with five 84mm guns in casemates. A tunnel links Fort Airolo to the Gotthard Rail Tunnel. Abandoned by the military in 1947, the fort is maintained as a museum by a preservation group and may be visited.Battery Motto Bartola is located just up the hill from Fort Airolo and mounted an additional four 120mm guns. The fort, built between 1888 and 1890, also mounted four 84mm guns, with extensive underground galleries linking the firing positions.
Battery Foppa Grande mounted one 105mm gun in a camouflaged turret above Motto Bartola, with three 20mm anti-aircraft guns. The position featured a mortar battery, installed in 1953. The position was deactivated in 1997 and classified as potentially historical. The position may be visited by prior arrangement.
Fort San Carlo is an artillery fort
Fort Stuei
Saint Gotthard Tunnel South Portal monitored the original south entrance to the Gotthard Rail Tunnel. Portions of the original installation remain, but the tunnel entrance has been extended to the south and the historic portal no longer exists. These positions were built in 1886-87 and represent the first modern fortifications in Switzerland. A gallery links the main tunnel positions back to Fort Airolo.
St. Gotthard Pass positions
Redoubt Hospiz, also known as Forte Ospizio, was built in 1894 and operated until 1947 near the summit of the Gotthard Pass. The fort mounted two single 120mm gun turrets. The fort is now operated as a museum and may be visited by the public.Fort Sasso da Pigna was built during the early part of World War II, becoming operational in 1943, effectively replacing Redoubt Hospiz. The fort consists of an eastern battery overlooking the Leventina valley and a western battery overlooking the Bedretto valley and the main pass. The main entrance is located just to the north of Fort Ospizio, with of galleries and four 105mm gun positions. A proposed addition of two more guns in the late 1950s never proceeded. The position was used until 1999. It opened to the public as a museum on 25 August 2012.
Infantry positions: A number of small infantry bunkers exist near the top of the pass, most notably Bunker No. 3. Construction took place in three stages: 1886-87, 1892–1920, and 1946-1973. These works exhibit a high quality of workmanship and integration into the landscape.
Göschenen
Andermatt
Urseren Valley North
Fort BühlFortin Altkirch
Fort Bäzberg
Oberalp Pass
Fort StöckliOberalp infantry positions
Fort Gütsch
Furka Pass
Fort GalenhüttenFort Fuchsegg
Fortress St. Maurice
Fortress Saint-Maurice encompasses the area around Saint-Maurice in the western, French-speaking portion of Switzerland. The Rhône leaves the central Alpine region through a narrow defile, between mountains to the south and mountains to the north. The only comparatively easy access to the upper Rhône valley, and thus to the western National Redoubt, is through Saint-Maurice. Fortress Saint-Maurice is a series of fortifications set into the mountains on either side of the valley, dominating the region as far as Lake Geneva with their artillery. The principal fortification is the enormous Fort de Dailly, supported by forts Savatan, Fort du Scex, and Fort de Cindey, as well as lesser positions. The extent of the area designated as Fortress Saint-Maurice is not clearly defined, but according to the Association Fort de Litroz, the Saint-Maurice sector comprises the Rhône narrows from just north of Saint-Maurice to Martigny, excluding Chillon and Champillon, as well as the fortifications of the lateral valleys. However, the effective control of the Saint-Maurice positions extended from Lac Léman to the Great Saint Bernard Pass.Fortress Sargans
Fortress Sargans comprises six major fortifications centered on the town of Sargans in St. Gallen canton.First Rhine Barrier Forts
Fort SchollbergFort Anstein
Major Forts
Fort Magletsch is as of 2012 still in use by the Swiss military.Shut down in 2017
Fort Castels is as of 2012 still in use by the Swiss military.
Shut down in 2017
Fort Furggels
Fort Passatiwand
Southern Forts
Fort MolinäraFort Haselboden
Second Rhine Barrier Forts
Fort TschingelFort Nusslock
Fort Tamina Ragaz
Modernization
The Redoubt positions and others in Switzerland were augmented by the Bison project, which involved the installation of anti-tank guns in new bunkers at key locations to provide a modernized pre-positioned force capable of defeating modern armor. A project to install automatic 120mm mortars was completed in 2003.Army strength reductions
In 1995, the Swiss army was reduced from 750,000 troops to 400,000. By 2004, army strength was 120,000, with 80,000 proposed by 2020.Fate
Debate continues over the usefulness of the Redoubt and other Swiss fortifications. In October 2010, Defense Minister Ueli Maurer proposed closing many of the positions after mitigating environmental issues and assuring permanent safety. A decommissioning program was expected to cost as much as a billion francs. In 2011, Maurer estimated costs to close down the system safely at more than $1 billion. Some of the facilities have been leased or sold as digital data repositories.Because the Réduit strategy was essentially one of deterrence, part of it was overt and public, and played a part in the so-called "intellectual defence of the homeland", or Geistige Landesverteidigung attempting to improve the morale and cohesiveness of the nation. The Réduit strategy's use as a deterrence/propaganda tool continued through the cold war. In 1964, the army's pavilion at the Swiss Fair in Lausanne had the shape of a giant Czech hedgehog made of concrete.
The Réduit features at the center of Swiss writer Christian Kracht´s 2008 dystopian novel Ich werde hier sein im Sonnenschein und im Schatten.
German-language references
- Hans-Rudolf Maurer : Geheime Kommandoposten der Armeeführung im Zweiten Weltkrieg: Projekte, Bauten und der Mobile Kommandoposten. Verlag Merker im Effingerhof, Lenzburg 2001,
- Willi Gautschi: General Henri Guisan: Die schweizerische Armeeführung im Zweiten Weltkrieg. 4. Auflage. Verlag NZZ, Zürich 2001,
- Roberto Bernhard: Das Reduit. Mythen und Fakten ; militärischer Notbehelf, Rettungsanker der Nation, Mythos, Gegenmythos. Institut Libertas, Biel/Bienne 2007,
- Inventar der Kampf- und Führungsbauten. Bern: Eidg. Dep. für Verteidigung, Bevölkerungsschutz und Sport, Bereich Bauten. 11-teiliges Werk, erschienen zwischen 1999 und 2006.
- Hand Rudolf, Walter Lüem, Jean-Jacques Rapin, Hans Rapold, Hans Senn: Die Geschichte der schweizerischen Landesbefestigung. Zürich: Orell Füssli, 1992.