Nakoso Thermal Power Station


The Nakoso Thermal Power Station is an coal-fired thermal power station operated by the Jōban Joint Power Co., Ltd. in the city of Iwaki, Fukushima, Japan. The facility is located on the Pacific coast of Honshu. The Jōban Joint Power Co., Ltd is a joint venture between Tohoku Electric, Tokyo Electric and a cooperative of coal producers in Fukushima Prefecture.

History

The Jōban Joint Power Co., Ltd. was founded to provide baseline electrical power to the Tokyo Metropolis using low-grade coal from the Jōban coal fields of Fukushima Prefecture. The first two units came on line in 1957, followed by Units 3 and 4 in 1960, Unit 5 in 1961, Unit 6 in 1966 and Unit 7 in 1970. Due to increasing costs for domestic coal, Units 7 through 9 were designed to burn a mixture of carbonized sewage sludge with coal and heavy oil. Units 8 and 9 came on line in 1983. In March 2011, biomass was introduced to the mixture.
A Coal Gasification Combined Cycle demonstration unit was constructed and tested from September 2007 to March 2013. Commercial operation began as Unit 10 in April 2013, and the institute was merged into Joban Joint Thermal Power.
Due to the age of the facilities and cost of maintenance and operation, Units 1-5 were abolished by 1987 and Unit 6 in November 2015.
Operations were temporarily suspended due to damage caused by the Tōhoku earthquake and tsunami in March 2011. At the time of the earthquake, Unit 8 was down for periodic maintenance. Most of the damage occurred at Onahama Port, which contained the wharf which was used for unloading coal, and to the coal conveyor to the power plant. Unit 9 resumed operation on June 30, 2012, Unit 8 on July 28 and Unit 7 on December 21.
On May 15, 2014, TEPCO and Joban Joint Thermal Power Co., Ltd. announced that it intended to construct a new large coal gasification combined cycle adjacent to this power plant as part of the Fukushima recovery project. This plant is scheduled for completion in September 2020, with a projected output of 540 MW.

Plant details

UnitFuelTypeCapacityOn lineStatus
1Coal, Heavy OilSteam turbine35 MWNov 1957Decommissioned 1983, Scrapped
2Coal, Heavy OilSteam turbine35 MW1960Decommissioned 1983, Scrapped
3Coal, Heavy OilSteam turbine75 MW1960Decommissioned 1987, Scrapped
4Coal, Heavy OilSteam turbine75 MW1960Decommissioned 1987, Scrapped
5Coal, Heavy OilSteam turbine75 MW1961Decommissioned 1987, Scrapped
6Heavy OilSteam turbine75 MWNov 1966Decommissioned 2015, Scrapped
7Coal / BiomassSteam turbine250 MWJuly 1970operational
8Coal / BiomassSteam turbine600 MWSeptember 1983operational
9Coal / Heavy Oil / BiomassSteam turbine600 MWDecember 1983operational
10CoalIGCC250 MWApril 2013operational