The station was constructed with 4 English Electric 350 MW turbo-alternators. Munmorah had a total capacity of 1,400 MW. Steam was supplied at a pressure of 2,500 psi and a temperature of 460 °C. One unit was completed in 1967, another in 1968, and the remaining two in 1969. Units 3 and 4 had fabric filters fitted in the 1980s, and this reduced load to 320 MW each. Units 1 and 2 were relegated to emergency use from 1992. Munmorah drew salt water from Lake Munmorah, part of the Tuggerah Lakes, for condenser cooling. The coal for Munmorah came from two underground mines, Munmorah State mine and Newvale No.2 Colliery, and also from Vales Point coal storage via a series of conveyor belts. In September 2007, the New South Wales State Government announced the commencement of a trial of 'clean coal' technology at Munmorah Power Station. The 5 million trial by the CSIRO and Delta Electricity was part of a larger A$150 million trial jointly funded by the coal companies. On 15 November 2007, 15 Greenpeaceactivists entered the power station property and switched off one of the conveyor belts as a protest against the climate change policies of the Liberal Party of Australia and Australian Labor Party in the run up to the 2007 federal election. In 2012 Carbon Monitoring for Action estimated the power station emitted 4.246 million tonnes of greenhouse gases as a result of burning coal.
Closure
Delta Electricity announced on 3 July 2012 the closure of Munmorah power station after 45 years of operation due to decreasing energy demand. Parts of the boilers and turbines needed to be replaced which would have cost about 400 million dollars. Units 3 and 4 had been maintained on standby but have not been in production since August 2010. Munmorah was disconnected from the grid in May 2014 and completely de-commissioned. Plans were made to demolish the station and its out-buildings and sell off the 500 acres of surrounding land for housing and sporting venues. Demolition started in 2016 and was completed by the end of 2018. In December 2015 a survey of the power station precinct found that pollutants had entered the water table and made some areas unsuitable for housing. In 2017, the time came to implode the twin chimney stacks at a height of 155m tall, both two stacks toppled over. It was a controlled demolition project. Demolition of the boilers occurred in May 2017 and 2018.
Chimney Stacks
2 Emission Stacks at a height of 155 metres tall.
Demolition
In 2013 was the beginning for demolition to begin on Munmorah Power Station facilities, the first move was to pull away parts from the boilers. That included some facilities inside the boilers and the vents that went to the emission stacks from the boiler facility. In 2015, was time to disconnect all vintage equipment from the large shed and boiler and send them off to the scrap heap. In 2017, the two Emission Stacks at 155 metres tall, came crashing down by a controlled demolition.
Popular Times at Munmorah Power Station
A documentary was based on Munmorah Power Station in the mid 1990s, detailing effects to our environment from coal fired power stations like Munmorah.