Motorway 1 (Greece)


Motorway 1 motorway, and previously as Patras-Athens-Thessaloniki-Evzonoi is the 2nd longest motorway in Greece with a length of 550 km. It is the principal north–south road connection in Greece, connecting the country's capital Athens with the regions of Thessaly and Macedonia, as well as the country's second largest city, Thessaloniki. It starts from Neo Faliro in Attica and continues north to reach the Evzonoi border station, on the Greek border with North Macedonia.
Today, the construction, operation and maintenance of Motorway 1 have been largely outsourced to private companies: Aftokinitodromos Aigaiou SA., Kentriki Odos SA and Nea Odos SA.

Route

The motorway passes through Mainland Greece and has largely replaced National Road 1. It begins at Kifissou Avenue, Athens, just north of the Bay of Phaliro, and continues northward to Evzonoi, on the border with the country's northern neighbour, North Macedonia, where it continues as the A1. Before the European routes numbers were changed, the northern part from Efzoni to EO2 was E5N, while today the entire road is part of European route E75. The task of maintaining and charging for parts of the motorway has recently been ceded to private consortia, part of the deal for the construction of the Ionia Odos, the E65, as well as the bypass of Tempe Valley.
The part west of downtown Athens runs over the Cephisus river and Kifissou Avenue. From north of the boundary of Voiotia - Phthiotis, up to near Velestino, the tollway runs close to the coast of the Aegean Sea. It then continues north of the Tempe Valley and up to the junction of the European route E90. It then shares a 25 km common part with A2 / E90, and then, at the "Axios Interchange", continues north to Evzonoi and the national border with North Macedonia. Its total length is approximately 550 km.

Cities

Motorway 1 passes near major urban centers in the country:
  1. Athens
  2. Thebes
  3. Chalcis
  4. Lamia
  5. Larissa
  6. Katerini
  7. Thessaloniki
  8. Polykastro

    Airports

The ATHE motorway is connected to the following airports:
  1. Thessaloniki
  2. Nea Anchialos -
  3. Athens -

    Harbours

The ATH motorway is connected to the following harbours:
  1. Thessaloniki
  2. Volos
  3. Piraeus

    Distances in kilometers

History

1950s-1970s

The motorway used to be entirely a 2-lane highway and ended near Katerini until 1973. The section Athens - Lamia opened in August 1962 as a 14 m width road. The section Lamia - Larissa opened in October 1967 as a 14 m width road. The section Larissa - Katerini opened in September 1959 as a 13 m width road. The section Katerini - Thessaloniki opened in September 1973 as a 14 m width road. The section Axios junction - Evzoni opened in July 1973. The section Axios junction - Polykastro opened as a 14 m width road, while the section Polykastro - Evzoni opened as a motorway.

1980-today

When it was extended to Thessaloniki and to the border with North Macedonia, the motorway had 4-lanes. It was extended during construction in the north in the 1980s and the south in the early and mid 1990s which began near the Afidnes toll. In 1995, Motorway 1 had motorway characteristics in the sections Athens - Thebes and Kleidi - Thessaloniki, while the section Thebes - Kleidi was an undivided 14 m road. In 1998, the motorway had 6-lanes up to north of Thebes, and 4 lanes from Thebes up to the Tempe Valley with a few sections at western Magnesia still having 2 lanes. Since then, the Larissa bypass has been constructed. As from 2017, it complies with all motorway standards for its whole length with either two, three or four traffic lanes in each direction plus an emergency lane.
The final part of the motorway, 25 km through the Tempe Valley including the longest road tunnel in the Balkans, which is about 6 km long, as well as 2 more tunnels, was completed in April 2017. The circular motorway around Athens, Attiki Odos, means that traffic can continue to the Peloponnese, linking up with the motorway to the port city of Patras and that of Kalamata.
In November 2017, with the launch of the tender for the privatization of Egnatia Motorway and the announcement of its terms, it was announced that the upgrade of the Halastra-Polykastro section from an expressway to as motorway was under planning. This was confirmed in September 2018. Construction costs are estimated to exceed € 200 million, and the remainder of the axis from Polykastro to Evzoni, which has already been characterized a motorway will be upgraded with more modern features such as safety barriers, new signage and road improvements.

Exit list

The exits of the completed sections of the A1 motorway:
Regional unitExitNameDestinationsNotes/Also as
KilkisEvzonoi border crossing M1 E75
5-gate customs
Speed limit 20
Height limit 4.5 m.
northern terminus of the A1
KilkisBus and truck customs one-exit interchange without ramps
KilkisEvzonoi GR-1
E75
KilkisPolykastro
E75
Rest Area of Polykastro
ThessalonikiAgios Athanasios GR-2 E86
E75
Thessaloniki19Axios interchange A2 E90
E75
Thessaloniki18Nea Malgara
E75 E90
Imathia17Kleidi interchangeWest: A2 : Kozani, Veria, Ioannina
E75
PieriaAiginio
E75
PieriaNea Agathoupoli
E75
PieriaMakrygialos
E75
Pieria Rest Area of Korinos
PieriaKorinos
E75
PieriaKaterini North,
Paralia
Katerini Ring Road,
Paralia, Kallithea
E75
PieriaKaterini East GR-1
E75
PieriaFillipos Tunnel Alexandros Tunnel
PieriaKaterini South Olympiaki Akti E75
PieriaNea Efesos Nea Efesos, Kontariotissa
E75
PieriaParalia Litochorou,
Dion
Dion
E75
PieriaLitochoroWest: Litochoro, Mount Olympus
East: Plaka
E75
PieriaPlaka Litochorou Plaka
E75
PieriaLeptokarya,
Skotina
GR-1
East: Leptokarya, Paralia Skotinas
E75
Pieria Rest Area of Skotina
PieriaPlatamonas Tunnel Platamonas Tunnel
PieriaPlatamonas,
Neoi Poroi
E75
LarissaRapsani
E75
LarissaTempe Tunnel 2 Tempe Tunnel 2
LarissaTempe Tunnel 1 Tempe Tunnel 1
LarissaEvangelismos,
Makrychori
GR-1
E75
Larissa Rest Area of Evangelismos
LarissaLarissa 1 GR-1
E75
LarissaLarissa 2
E75
LarissaLarissa 3 GR-6
E75
LarissaLarissa 4 GR-108 E92
E75
LarissaKileler
E75 E92
LarissaMega Monastiri
E75 E92
MagnesiaVelestino
Volos
GR-6 E92
E75
MagnesiaAerino GR-1
E75
MagnesiaMikrothives
Volos
Farsala
GR-30
E75
MagnesiaAlmyros
E75
MagnesiaSourpi
E75
Magnesia Rest Area of Almyros
MagnesiaAgioi Theodoroi
E75
PhthiotisPelasgia
E75
PhthiotisRaches GR-1
E75
PhthiotisStylida
Karavomylos
E75
PhthiotisAgia Marina GR-1
E75
PhthiotisAgia Paraskevi
E75
PhthiotisLamia 1 E65
E75
Phthiotis Rest Area of Lamia
PhthiotisLamia 2 A3
Planned
PhthiotisBralos GR-27 E65
E75
PhthiotisThermopyles
E75
PhthiotisMolos
E75
PhthiotisKainourgio
E75
PhthiotisKamena Vourla
E75
PhthiotisLatomeio
E75
PhthiotisAgios Konstantinos
E75
PhthiotisLongos
E75
PhthiotisArkitsa
E75
PhthiotisLivanates
E75
PhthiotisAtalanti
E75
PhthiotisTragana
E75
PhthiotisMalesina
E75
PhthiotisMartino
E75
BoeotiaKastro GR-48
E75
Boeotia33Akraifnio
E75
Boeotia31Thebes barracks
E75
BoeotiaThebes
E75
BoeotiaThebes 2 A13
Planned
Boeotia Rest Area of Tanagra
Boeotia30Ritsona GR-44
E75
BoeotiaSchimatari GR-44βA1 southbound access to A11
E75
BoeotiaChalcis interchange A11
E75
BoeotiaOinoi
E75
East AtticaOinofyta
E75
East Attica 'Serios' Rest Area
East AtticaMalakasa GR-79
E75
East AtticaMarkopoulo
E75
East AtticaKapandriti GR-81
E75
East AtticaAfidnes
E75
East AtticaAgios Stefanos GR-83
E75
North AthensVarympompi
E75
North AthensKifisia
E75
North AthensLykovrysi
E75
North AthensMetamorfosi
E75
North AthensMetamorfosi interchange A6 E94
E75
Central AthensAnagenniseos Street
E75
Central AthensKrestenis Street
E75
Central AthensVryoulon Street
E75
Central AthensAcharnon Street
E75
Central AthensAgioi Anargyroi
E75
Central AthensLiosion Street
E75
Central AthensPatisia
E75
Central AthensPeristeri north
E75
Central AthensKonstantinoupoleos Avenue
E75
Central AthensEthnarchou Makariou Street
E75
Central AthensPeristeri south GR-8
E75
West AthensIera Odos
E75
West AthensPetrou Ralli Avenue
E75
PiraeusAgias Annis Street
E75
PiraeusPeiraios Street GR-56
E75
PiraeusPiraeus E75southern terminus of the A1

Gallery