MiTEx


The Micro-satellite Technology Experiment is a microsatellite-based mission launched into geosynchronous orbit June 21, 2006 aboard a Delta II rocket. The US Air Force described the mission as a "technology demonstration" for the Defense Advanced Research Projects Agency, the U.S. Air Force and the U.S. Navy.
MiTEx consists of three spacecraft; two inspection satellites, designated USA-187 and USA-188, and an experimental upper stage, designated USA-189. The two inspection satellites were initially used to inspect each other; however, they were later used to inspect DSP-23, a failed missile detection satellite, to find out why it stopped operating.

Development

MiTEx was developed with funding from the Microsatellite Demonstration Science and Technology Experiment Program. Funding for MiDSTEP is allocated to DARPA through the "Space Programs and Technology" element of the United States Department of Defense "Advanced Technology Development" budget item. DoD budget documents from February 2008 show costs of MiDSTEP in 2007 of US$8 million, in 2008 of $10 million, and in 2009 of $8 million. Dr. Owen C. Brown was the program manager for the design, integration, test, launch, and demonstration of MiTEx, while he was a program manager in the Tactical Technology Office at DARPA.

Launch

The satellites were launched from Cape Canaveral Air Force Station Space Launch Complex 17 on 21 June 2006 at 21:34 UTC using a Delta II carrier rocket flying in a 7925-9.5 configuration. The two inspection satellites were lifted to geosynchronous orbit by a fourth stage of a new, experimental design. The stage was developed at the United States Naval Research Laboratory, and it is reportedly equipped with photovoltaic arrays for power.

Mission

Because of their small dimensions, the satellites are hard to detect in their geosynchronous orbit, and thus could approach and examine other satellites without being noticed. After completion of their primary mission, the satellites were parked on opposite sides of Earth. During the 2nd week of 2009 the MiTEx satellites were commanded to approach DSP-23, which had failed two months earlier, and had started to drift by 1 deg East from its own parking position at 8.5deg East. The MiTEx satellite parked over the mid-Atlantic rendezvoused with DSP-23 around Dec 23, 2009, followed by the 2nd MiTEx satellite one week later.