The bridge, which opened in March 2012, is the first of a series of bridges that the office of Santiago Calatrava designed to span the Trinity River in downtown Dallas. The bridge connects Spur 366 in downtown to Singleton Boulevard in West Dallas. Construction on the bridge began in December 2005. The bridge cost $117 million to build. A Dallas Morning News analysis put the project's total cost at $182 million. Beginning in 2004, successfully worked to secure private funds in support of the Trinity River Corridor Project, including the Margaret Hunt Hill Bridge, Margaret McDermott Bridge, Ronald Kirk Bridge, trails and other components of the project. On June 26, 2010, the signature 40-story center-support arch was topped with a central curved span, which can now be seen from many miles away in several directions. The arch provides an additional feature to the Downtown Dallas skyline. In 2012, the bridge received an Outstanding Civil Engineering Achievement Award from the Texas section of the American Society of Civil Engineers. The bridge also received a 2012 European Convention for Constructional Steelwork Award For Steel Bridges. On June 1, 2020 at approximately 9:00 PM, several hundred protesters marching on the bridge were arrested in a kettling maneuver when Dallas Police routed the protest onto the bridge, blocked in the demonstration on both sides, fired teargas and pepper balls into the nonviolent crowd, then detained all protesters on the bridge for several hours. On June 4, Dallas Police Chief U. Reneé Hall announced that the protesters would not be charged following several days of attention and backlash from community members, political figures, local news outlets, and activist groups.
Architecture
The cable-stayed bridge supports its length and main span with a steel arch whose peak's height is 400 feet. An array of twisting cables connect the underside of the arch's curved pylon to the bridge's platform. Fifty-eight white strands descend from the arch and secure themselves along the centerline of the platform. The diameter support is composed of 25 individual segments, secured with of bolts and additional 450 tons of concrete. The bridge provides six lanes for vehicular traffic. The bridge closely resembles two of three bridges constructed in 2005-2006 above the Autostrada A1motorway and connecting roads in Reggio Emilia, Italy, that Calatrava had earlier designed. In 2009, the European Convention for Constructional Steelwork gave the two bridges a European Steel Design Award, stating that the structures' original visual effects at different angles give the bridges "the aspect of huge musical instruments."