List of tallest buildings in Bucharest
, the capital of Romania, is the site of 100 completed high-rises, 4 of which stand taller than and 71 of which stand taller than. The tallest skyscraper in the city and Romania is the SkyTower, which rises in Sector 1. The city has been the site of several construction projects that mostly consist of new office buildings, residential towers and hotel developments.
Bucharest's history of high-rises began with the 1932 completion of the 14-story Carlton Bloc. The structure was, at the time of its completion, the tallest building in the city; it remained the tallest in Bucharest until the Telephone Palace was completed in 1934. Bucharest underwent a major building boom during the communist regime which led to many systematization works. During this time, the Casa Presei Libere became the tallest building in the city; the structure was also the tallest building in Romania until 2007, when the Tower Center International was completed. The most recent high-rise construction project to be completed in Bucharest was the Globalworth Tower. The project consisted of a office building of 27 storys. The building, located on the Barbu Văcărescu street was completed in April 2016, becoming the 2nd-tallest building in the city.
As of June 2016, there are 25 buildings under construction in Bucharest that are planned to rise over in height. The largest construction projects in the city are the Orhideea Towers, The Bridge and the Globalworth Campus. The Orhideea Towers is an under-construction dual tower complex comprising one 17-floor tall building and one 13-floor tall building linked together by a skybridge. The project is expected to be delivered by 2017. The Bridge is another large project consisting of two 10 floor office buildings located next to the Orhideea towers.
The largest and most important project in construction is the Globalworth Campus consisting of three office buildings, two of which have 12 floors and one 14 floors. The complex will be at completion, in 2017, the largest office building complex in Bucharest and Romania surpassing the Iride Business Park owned by Immofinanz. The original project of the Globalworth Campus included a fourth 25 floor building which was not included in the development.
Tallest buildings
List of tallest buildings in Bucharest
This lists ranks Bucharest high-rises that stand at least tall, based on standard height measurement. This includes spires and architectural details but does not include antenna masts.
Rank | Name | Image | Height m | Floors | Year | Coordinates | Notes |
1 | SkyTower | 37 | 2012 | Tallest building in Bucharest and Romania since completion in 2012 | |||
2 | Catedrala Mântuirii Neamului | N/A | 2024 | It is the tallest and largest Orthodox church in the world by volume and the second in the world by area.T/O in 2020 | |||
3 | Globalworth Tower | 27 | 2016 | Second tallest building in Bucharest at completion in 2016 | |||
4 | Ana Tower | 25 | 2019 | ||||
5 | Tower Center International | 26 | 2008 | Was the tallest building in Bucharest between 2007 and 2012 | |||
6 | Casa Presei Libere | 23 | 1956 | Tallest building in Bucharest between 1956 and 2007 | |||
7 | Asmita Gardens Tower 3 | 25 | 2009 | Tallest residential building in Romania | |||
8 | Orhideea Towers | 17 | 2017 | Two towers, first high and second high | |||
9 | Palace of the Parliament | 12 | 1997 | Largest building in Romania | |||
10 | Bucharest Financial Plaza | 18 | 1997 | Headquarters of BCR Bank | |||
11 | BRD Tower | 19 | 2003 | Headquarters of BRD – Groupe Société Générale | |||
12 | Asmita Gardens Tower 6 | 20 | 2009 | Second tallest residential building in Romania | |||
12 | Euro Tower | 19 | 2009 | The first green building in Bucharest | |||
12 | Globalworth Plaza | 20 | 2010 | Formerly known as Nusco Tower | |||
15 | Doamna Ghica Plaza A | 24 | 2011 | The complex has one 24 floor tower and four 16 floor towers | |||
16 | InterContinental Bucharest | 25 | 1970 | Tallest hotel in Romania | |||
16 | Monaco Towers I | 20 | 2009 | ||||
16 | Monaco Towers II | 20 | 2009 | ||||
19 | Cathedral Plaza | 19 | 2011 | The building might endanger the structural integrity of the nearby St. Joseph Cathedral | |||
20 | TVR Tower | 13 | 1968 | Headquarters of the Romanian National Television | |||
21 | Unirii View Tower | 19 | 2018 | ||||
22 | City Gate North Tower | 18 | 2009 | ||||
22 | City Gate South Tower | 18 | 2009 | ||||
22 | Crystal Tower | 15 | 2011 | The first private office building in Bucharest with a heliport and it serves as the headquarters of the Dutch banking group ING. | |||
22 | Millennium Business Center | 19 | 2009 | On June 27, 2009 the building went on fire after a big billboard exploded because it was struck by lightning | |||
26 | Alia Apartments | 20 | 2010 | ||||
26 | The Mark | 15 | 2018 | ||||
26 | Charles de Gaulle Plaza | 16 | 2005 | Has the fastest elevators in Romania having a speed of 2.5 m/s | |||
26 | Sheraton Bucharest Hotel | 18 | 1976 | Originally Hotel Dorobanți, then later on Howard Johnson Grand Plaza Hotel changed its name to Sheraton Bucharest on August 28, 2015 | |||
30 | Blocul Sarbesc | 18 | 1975 | ||||
30 | Victoria Complex | 18 | 2009 | ||||
30 | Metropolis Residence | 18 | 2008 | ||||
33 | Business Development Center | 17 | 2004 | ||||
33 | Unicredit Tower | 16 | 2012 | Headquarters of the Italian UniCredit Bank | |||
33 | Doamna Ghica Plaza C | 17 | 2011 | The complex has one 24 floor tower and four 16 floor towers | |||
35 | Doamna Ghica Plaza E | 17 | 2011 | The complex has one 24 floor tower and four 16 floor towers | |||
35 | Doamna Ghica Plaza G | 17 | 2011 | The complex has one 24 floor tower and four 16 floor towers | |||
35 | Doamna Ghica Plaza I | 17 | 2011 | The complex has one 24 floor tower and four 16 floor towers | |||
35 | InCity Residences 1 | 17 | 2009 | ||||
35 | InCity Residences 2 | 17 | 2009 | ||||
35 | InCity Residences 3 | 17 | 2009 | ||||
35 | InCity Residences 4 | 17 | 2009 | ||||
35 | InCity Residences 5 | 17 | 2009 | ||||
35 | PGV Tower | 15 | 2006 | ||||
35 | Rin Grand Hotel | 15 | 2008 | Was the largest hotel in Europe with 1,459 rooms but reduced to 489 rooms at present | |||
35 | Basarabia 96B | 17 | 2008 | ||||
35 | Bloc 9,Sala Palatului | 17 | 1960 | ||||
47 | Asmita Gardens Tower 1 | 20 | 2009 | ||||
47 | Asmita Gardens Tower 2 | 20 | 2009 | ||||
47 | Asmita Gardens Tower 4 | 20 | 2009 | ||||
47 | Asmita Gardens Tower 5 | 20 | 2009 | ||||
47 | Asmita Gardens Tower 7 | 20 | 2009 | ||||
47 | Piraeus Bank Tower | 15 | 2009 | The Romanian headquarters of the Greek Piraeus Bank is located in this building. | |||
47 | Premium Plaza | 15 | 2007 | ||||
47 | Sema Parc Building Two | 15 | 2008 | ||||
55 | Iuliu Maniu at Virtuţii Block | 16 | 1982 | ||||
55 | Vitan Platinum Towers | 16 | 2011 | Only one out of the original four towers was built | |||
57 | T69 Tower | 19 | 1980 | ||||
58 | Bucharest Corporate Center | 15 | 2007 | Headquarters of the Italian insurance company Assicurazioni Generali | |||
58 | Griro Tower | 15 | 1984 |
Tallest under construction, proposed, and approved
Under construction
This lists buildings that are under construction in Bucharest and are planned to rise at least. A floor count of 15 storys is used as the cutoff for buildings whose heights have not yet been released by their developers.Name | Image | Height m * | Floors | Year | Coordinates | Notes |
Dâmbovița Center | 34 | Unknown | Construction on hold | |||
Niro Tower | 23 | 2021 | Hotel | |||
@Expo | 18 | 2022 | 1xGF+18, 1XGF+12,1XGF+7 | |||
One Verdi Park Office Tower | 16 | 2021 | Part of One Verdi development | |||
One Verdi Park | 20 | 2021 | Part of One Verdi development | |||
One Tower | 16 | 2020 | Part of One Mircea Eliade development. One office building GF+16, one residential building GF+20, two residential buildings GF+15 | |||
One Mircea Eliade Residential Tower 1 | 20 | 2020 | Part of One Mircea Eliade development. One office building GF+16, one residential building GF+20, two residential buildings GF+15 | |||
Globalworth Square | 16 | 2020 | ||||
Sema Parc - London Building | 15 | 2021 | Part of Sema Parc complex |
Approved
This lists buildings that are approved in Bucharest and are planned to rise at least. A floor count of 15 storys is used as the cutoff for buildings whose heights have not yet been released by their developers.Name | Height | Floors | Year | Notes |
Sema Parc Tower | 42 | - | ||
Sema Parc Residential Tower 1 | 24 | - | ||
Sema Parc Residential Tower 2 | 24 | - | ||
Sema Parc Residential Tower 3 | 24 | - | ||
Sema Parc Building Four | 15 | - |
Proposed
This lists buildings that are proposed in Bucharest and are planned to rise at least. A floor count of 15 storys is used as the cutoff for buildings whose heights have not yet been released by their developers.Name | Height* | Floors | Year | Notes |
UP-site Bucharest | - | 24 | - | |
Iulian Dascalu Romexpo project | 41 | - | ||
Ion Tiriac IFMA project | - | 2023 | Demolition of old buildings on the premises started in 2020, including the demolition of Basarab Tower, a 114m elevator test tower. |
Timeline of tallest buildings
This lists buildings that once held the title of tallest building in Bucharest. The Turnul Colţei was the tallest structure in Bucharest from 1714 until 1888; because the bell tower was not a habitable building, it never stood as the tallest building in the city, but is included in this table for comparative purposes.Name | Image | Location | Years as tallest | Height m | Floors | Coordinates | Reference |
Turnul Colței | near today's University Square | 1714– 1888 | 2 | ||||
Foișorul de Foc | between Obor, Calea Moşilor and Nerva-Traian streets | 1890–1932 | 4 | ||||
Carlton Bloc | — | between Magheru and Regala streets | 1932–1934 | 14 | |||
Telephone Palace | Calea Victoriei | 1934–1956 | 10 | ||||
Casa Presei Libere | Presei Libere Square | 1956–2007 | 14 | ||||
Tower Center International | Victoria Square | 2007–2012 | 26 | ||||
Floreasca City Center | Calea Floreasca | 2012–present | 37 |