List of power stations in Indonesia
The following lists some of the larger power stations in Indonesia. Data are not included for a large number of small isolated plants in the Outer Islands. In total, the PLN operated over 5,000 plants across Indonesia in 2010 of which over 4,500 were small diesel plants outside of Java. For further details about existing capacity and operations of the electricity sector, see information about the state-owned Indonesian electricity company Perusahaan Listrik Negara.
Summary table
Non-renewable
Thermal
is the largest source of power in Indonesia. There are different types of thermal power plants based on the fuel used to generate the steam such as coal, gas, diesel etc. About 85% of electricity consumed in Indonesia is generated by thermal power plants.Bituminous coal or lignite
Existing
Note: IPP means independent power producerPower station | Location | District | Province | Region | Coordinates | Capacity per unit | Installed capacity | Operator | Sector | Notes | Refs |
Bukit Asam coal-fired | Tanjung Enim | Muara Enim | South Sumatra | Sumatra | 4 x 65 | 260 | PT. PLN | Government | Boiler from Stein, Turbines from Rateau and generators from GEC Alstom | ||
Paiton coal-fired | Paiton | Probolinggo | East Java | Java-Bali | 2 x 400 | 800 | PT. PLN | Government | Boiler from ABB Combustion Engineering, Turbines and generators from Toshiba | ||
Ombilin coal-fired | Ombilin | Sawahlunto | West Sumatra | Sumatra | 2 x 100 | 200 | PT. PLN | Government | Boiler from Stein, Turbines and generators from GEC Alstom | ||
Suralaya coal-fired | Suralaya | Cilegon | Banten | Java-Bali | 4 x 400 3 x 600 | 3,400 | PT. Indonesia Power | Government | Boiler from Babcock & Wilcox Canada, Turbines from MHI Japan; generators from Mitsubishi Electric Co. | ||
Suralaya Baru coal-fired | Suralaya | Cilegon | Banten | Java-Bali | 1 x 625 | 625 | PT. Indonesia Power | Government | Boiler from Shanghai Co. Ltd, Turbines and generators from Shanghai Co. Ltd | ||
Paiton | Paiton | Probolinggo | East Java | Java-Bali | 2 x 670 2 x 610 1 x 850 | 2,300 | PT. Paiton Energy | Private | Boiler supplied by ABB, Turbines and Generators supplied by GE | ||
Tanjung Jati-B I coal-fired | Bangsri | Jepara | East Java | Java-Bali | 2 x 662 | 1,320 | PT. Central Java Power | Private | Boiler supplied by Babcock & Wilcox, Turbines and Generators supplied by Toshiba | ||
Tanjung Jati-B II coal-fired | Bangsri | Jepara | East Java | Java-Bali | 2 x 662 | 1,320 | PT. Central Java Power | Private | Boiler supplied by Mitsubishi Heavy Industry, Turbines and Generators supplied by Toshiba | ||
Cirebon coal-fired | Kanci Kulon | Cirebon | West Java | Java-Bali | 1 x 660 | 660 | PT. Cirebon Electric Power | Private | Boiler, Turbines and Generators supplied by Doosan Heavy Industries and Construction Co., Ltd. | ||
Cilacap | Karangkandri | Cilacap | Central Java | Java-Bali | 2 x 300 | 600 | PT. Sumber Segara Primadaya | Government | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | ||
Cilacap Adipala coal-fired | Adipala | Cilacap | Central Java | Java-Bali | 1 x 660 | 660 | PT. Indonesia Power | Government | Boiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd | ||
Indramayu coal-fired | Sumur Adem | Indramayu | West Java | Java-Bali | 3 x 330 | 990 | PT. PLN | Government | Boiler supplied by Babcock & Wilcox Beijing Co., Turbines and Generators supplied by Beijing Beizhong | ||
Pacitan coal-fired | Sukorejo | Pacitan | East Java | Java-Bali | 2 x 315 | 630 | PT. PLN | Government | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | ||
Tarahan coal-fired | Tarahan | South Lampung | Lampung | Sumatra | 2 x 100 | 200 | PT. PLN | Government | Boiler supplied by Jinan Co. Ltd, Turbines and Generators supplied by Wuhan Co. Ltd | ||
Labuan coal-fired | Labuan | Pandeglang | Banten | Java-Bali | 2 x 300 | 600 | PT. Indonesia Power | Government | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | ||
Labuhan Angin coal-fired | Labuhan Angin | Central Tapanuli | North Sumatra | Sumatra | 2 x 115 | 230 | PT. PLN | Government | Boiler supplied by Foster Wheeler, Turbines and Generators supplied by Shanghai Turbine Co. Ltd. | ||
Lontar coal-fired | Lontar, Teluk Naga | Tangerang | Banten | Java-Bali | 3 x 315 | 945 | PT. Indonesia Power | Government | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | ||
Pelabuhan Ratu coal-fired | Pelabuhan Ratu | Sukabumi | West Java | Java-Bali | 3 x 350 | 1050 | PT. Indonesia Power | Government | Boiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd | ||
Rembang coal-fired | Sluke | Rembang | Central Java | Java-Bali | 2 x 315 | 630 | PT. PLN | Government | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | ||
Bangka Belitung 3 coal-fired | Air Anyir | Bangka | Bangka Belitung | Sumatera | 2 x 30 | 60 | PT. BMP | Government | |||
Total | 50 | 18,630 | - |
Proposed or under construction
ThermalPower station | Location | District | Province | Region | Capacity per Unit | Installed Capacity | Operator | Sector | Remarks and Plant Coordinates |
Java 4 coal-fired | Tubanan, Kembang | Jepara | Central Java | Java-Bali | 2 x 1000 | 2,000 | PT. Bhumi Jati Power | Private | |
Java 7 coal-fired | Kramatwatu | Serang | Banten | Java-Bali | 2 x 1000 | 2,000 | PT. Shenhua Guohua Pembangkitan Jawa Bali | Private | |
Central Java coal-fired | Ujungnegoro | Batang | Central Java | Java-Bali | 2 x 1000 | 2,000 | PT. Bhimasena Power Indonesia | Private | |
Tanjung Awar-Awar coal-fired | Kaliuntu | Tuban | East Java | Java-Bali | 2 x 350 | 700 | PT. PLN | Government | Boiler supplied by Babcock & Wilcox Beijing Co. Turbines and generators supplied by Beijing Beizhong |
Madura coal-fired | Pamekasan | East Java | Java-Bali | 2 x 100 | 200 | PT. PLN | Government | ||
Bojonegara coal-fired | Bojonegara | Cilegon | Banten | Java-Bali | 3 x 740 | 2,220 | PT. PLN | Government | |
Tanjung Jati-A coal-fired | Cirebon | Cirebon | West Java | Java-Bali | 2 x 660 | 1,320 | PT. Bakrie Power | Private | |
Nusa Penida coal-fired | Nusa Penida | Bali | Java-Bali | 2 x 100 | 200 | PT. PLN | Government | ||
Anyer coal-fired | Anyer | Banten | Java-Bali | 1 x 330 | 330 | PT. PLN | Government | ||
Kuala Tanjung coal-fired | Kuala Tanjung | South Sumatra | Sumatra | 2 x 112 | 224 | PT. Ranyza Energi | Private | ||
Banjarsari coal-fired | Banjarsari | Lahat | South Sumatra | Sumatra | 2 x 100 | 200 | PT. Bukit Pembangkit Innovative | Private | |
Banyuasin coal-fired | Banyuasin | Banyuasin | South Sumatra | Sumatra | 2 x 100 | 200 | PT. Banyuasin Power Energy | Private | |
Baturaja coal-fired | Baturaja | Ogan Komering Ulu | South Sumatra | Sumatra | 2 x 100 | 200 | PT. Priamanaya Power Energi | Private | |
Simpang Belimbing coal-fired | Gunung Raja | Muara Enim | South Sumatra | Sumatra | 2 x 150 | 300 | PT. GH EMMI | Private | |
Arahan coal-fired | Arahan | Muara Enim | South Sumatra | Sumatra | 4 x 600 | 2,400 | PT. PLN | Government | |
Central Bangko coal-fired | Bangko Tengah | Muara Enim | South Sumatra | Sumatra | 4 x 620 | 2,480 | PT. BA & CHD | Private | |
West Kalimantan 1 coal-fired | Tanjung Gundul | Bengkayang | West Kalimantan | Kalimantan | 2 x 100 | 200 | PT. GCL Indotenaga | Government - Private | |
Tanjung coal-fired | Tanjung | Tabalong | South Kalimantan | Kalimantan | 2 x 55 | 110 | PT. PLN | Government | |
Total | 34 | 17,264 |
Gas or liquid fuel
Renewable
Geothermal
Note: IPP means independent power producerPower station | Location | District | Province | Region | Capacity per Unit | Installed Capacity | Operator | Sector | Remarks |
Kamojang geothermal | Kamojang | Garut | West Java | Java-Bali | Unit I = 30 Unit II = 55 Unit III = 55 Unit IV = 60 Unit V = 35 | 235 | PT. Indonesia Power | Government | Unit IV 63 MW turbine capacity and 80 MVA generator capacity both from Fuji Electric, Kawasaki, Japan |
Darajat geothermal | Kamojang | Garut | West Java | Java-Bali | Unit I = 55 | 55 | PT. Indonesia Power | Government | |
Darajat geothermal | Kamojang | Garut | West Java | Java-Bali | Unit II = 90 Unit III = 110 | 200 | PT. Pertamina, Chevron Geothermal Indonesia, Ltd, | Private | Turbines Unit II = 81.3 MW & Unit III = 110 MW and Generators Unit II = 101.625 MVA & Unit III = 137.5 MVA both supplied by Fuji Electric, Kawasaki, Japan |
Gunung Salak geothermal | Parung Kuda | Sukabumi | West Java | Java-Bali | 3 x 60 | 180 | PT. Indonesia Power | Government | Turbines @ 55 MW and Generators @ 55 MVA both supplied by Ansaldo Energia, Italy |
Gunung Salak geothermal | Parung Kuda | Sukabumi | West Java | Java-Bali | 3 x 55 | 165 | Chevron Geothermal Salak Ltd and Dayabumi Salak Pratama Ltd | Private | Turbines @ 59.5 MW and Generators @ 74.375 MVA both from Fuji Electric, Kawasaki, Japan |
Ulubelu Geothermal Power Station | Ulubelu | Tanggamus | Lampung | Sumatra | 2 x 55 | 110 | PT.PLN | Government | Turbines 2 x 55 MW and Generators 2 x 55 MVA both from Fuji Electric, Kawasaki, Japan |
Wayang Windu geothermal | Pengalengan | Bandung | West Java | Java-Bali | 1 x 110 1 x 117 | 227 | PT. Pertamina and Magma Nusantara Ltd. | Private | Turbines 110 MW & 117 MW and Generators 2 x 137.5 MVA both from Fuji Electric, Kawasaki, Japan |
Dieng geothermal | Dieng | Banjarnegara | Central Java | Java-Bali | 1 x 60 | 60 | PT. Geo Dipa Energi | Private | |
Lahendong geothermal | Lahendong | Minahasa | North Sulawesi | Sulawesi | Unit I = 20 Unit II = 20 Unit III = 20 Unit IV = 20 | 80 | PT. PLN | Government | * Unit I: turbines = 20 MW and generator = 25 MVA both from Alstom * Unit II: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan * Unit III: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan * Unit IV: turbines = 20 MW and generator = 25 MVA both supplied by Fuji Electric, Kawasaki, Japan |
Sibayak geothermal | Sibayak | Karo | North Sumatra | Sumatra | 2 x 5.65 | 11.3 | PT. Dizamatara Powerindo | Private | Turbines @ 5.85 MW and Generators @ 6 MVA, 5.65 MW at PF 0.94 |
Patuha geothermal | Patuha | Bandung | West Java | Java-Bali | Unit 1 = 55 | 55 | PT. Geo Dipa Energi | Private | Turbines Unit 1 = 60 MW and Generator Unit 1 = 75 MVA both supplied by Toshiba |
Total | 19 | 1,344 |
Hydroelectric
Note: IPP means independent power producerPower station | Location | District | Province | Region | Capacity per Unit | Installed Capacity | Operator | Sector | Remarks |
Agam hydro | Batang Agam | Agam | West Sumatra | Sumatra | 3 x 3.5 | 10 | PT. PLN | Government | Turbines @ 3.55 MW and Generators @ 3.95 MVA both supplied by Ebara |
Maninjau hydro | Maninjau | Agam | West Sumatra | Sumatra | 4 x 17 | 68 | PT. PLN | Government | Turbines @ 17.4 MW and Generators @ 20 MVA both supplied by Toshiba |
Singkarak hydro | Singkarak | Solok | West Sumatra | Sumatra | 4 x 43.75 | 175 | PT. PLN | Government | Turbines @ 43.75 MW supplied by VoestAlpine and Generators @ 52 MVA supplied by ELIN |
Koto Panjang hydro | Koto Panjang | Kampar | Riau | Sumatra | 3 x 38 | 114 | PT. PLN | Government | Turbines @ 39.4 MW supplied by Kvaerner Boving and Generators @ 45 MVA supplied by ELIN |
Test I hydro | Tes | Rejang Lebong | Bengkulu | Sumatra | 4 x 4 | 16 | PT. PLN | Government | Turbines @ 4.7 MW supplied by Ansaldo Energia |
Musi hydro | Ujanmas Atas | Kepahiang | Bengkulu | Sumatra | 3 x 70 | 210 | PT. PLN | Government | Turbines @ 70 MW and Generators @ 86 MVA both supplied by VA Tech Hydro |
Besai hydro | Sumberjaya | West Lampung | Lampung | Sumatra | 2 x 45 | 90 | PT. PLN | Government | Turbines @ 46.4 MW and Generators @ 53 MVA both supplied by VA Tech Hydro |
Batutegi hydro | Tanggamus | West Lampung | Lampung | Sumatra | 2 x 14 | 28 | PT. PLN | Government | Turbines @ 14.2 MW and Generators @ 15.7 MVA both supplied by Toshiba |
Lau Renun hydro | Silalahi | Dairi | North Sumatra | Sumatra | 2 x 41 | 82 | PT. PLN | Government | Turbines @ 41 MW and Generators @ 47.5 MVA both supplied by VA Tech Hydro |
Sipansihaporas hydro | Sipansihaporas | Central Tapanuli | North Sumatra | Sumatra | 1 x 33 1 x 17 | 50 | PT. PLN | Government | Power Station 1 = Turbines 34 MW by Meiden, Japan and Generator 39 MVA by Toshiba Power Station 2 = 17.6 MW Meiden, Japan and Generator 20 MVA by Toshiba |
Asahan I hydro | Parmaksian | Toba Samosir | North Sumatra | Sumatra | 2 x 90 | 180 | PT. Bajradaya Sentranusa | Private | Turbines and Generators supplied by Dongfang Electric Corp. Ltd |
Asahan III hydro | Pintu Pohan Meranti | Toba Samosir | North Sumatra | Sumatra | 2 x 87 | 174 | PT. PLN | Government | |
Sigura-gura hydro | Simorea | Asahan | North Sumatra | Sumatra | 4 x 71.50 | 286 | PT. Inalum | Private | Turbines @ 71.5 MW and Generators @ 80 MVA both supplied by Toshiba |
Tangga hydro | Tangga | Asahan | North Sumatra | Sumatra | 4 x 79.25 | 317 | PT. Inalum | Private | Turbines @ 81.1 MW supplied by Hitachi Ltd. and Generators @ 90 MVA supplied by Mitsubishi Electric |
Wampu hydro | Kota Buluh | Karo | North Sumatra | Sumatra | 3 x 15 | 45 | PT. Wampu Electric Power | Private | |
Kerinci hydro | Batang Merangin | Kerinci | Jambi | Sumatra | 6 x 30 | 180 | PT. PLN | Government | Turbines @ 30 MW and Generators @ 33.33 MVA |
Saguling hydro | Rajamandala | Cimahi | West Java | Java-Bali | 4 x 175.18 | 701 | PT. Indonesia Power | Government | Turbines @ 175.18 MW supplied by Toshiba and Generators @ 194? MVA supplied by Mitsubishi Electric Co,. |
Cirata hydro | Plered | Purwakarta | West Java | Java-Bali | 8 x 126 | 1,008 | PT. Pembangkitan Jawa Bali | Government | Turbines @ 129.6 MW supplied by VoestAlpine and Generators @ 140 MVA supplied by ELIN |
Jatiluhur hydro | Jatiluhur | Purwakarta | West Java | Java-Bali | 6 x 31 | 186 | PT. Jasa Tirta II | Government | Turbines @ 32.3 MW supplied by NEYRPIC and Generators @ 35 MVA supplied by GEC Alsthom Jeumont |
PB. Sudirman hydro | Mrica | Banjarnegara | Central Java | Java-Bali | 3 x 60.3 | 181 | PT. Indonesia Power | Government | Turbines supplied by Boving and Generators supplied by ASEA |
Sutami hydro | Karangkates | Malang | East Java | Java-Bali | 3 x 35 | 105 | PT. Pembangkitan Jawa Bali | Government | |
Wlingi hydro | Wlingi | Malang | East Java | Java-Bali | 2 x 27 | 54 | PT. Pembangkitan Jawa Bali | Government | |
Tonsea Lama hydro | Tondano | Minahasa | North Sulawesi | Sulawesi | 1 x 4.44 1 x 4.50 1 x 5.44 | 14 | PT. PLN | Government | |
Tanggari I & II hydro | Tondano | Minahasa | North Sulawesi | Sulawesi | 1 x 17.20 1 x 19 | 36 | PT. PLN | Government | |
Bakaru I & II hydro | Bakaru | Pinrang | South Sulawesi | Sulawesi | 2 x 63 1 x 65 | 191 | PT. PLN | Government | |
Larona hydro | Soroako | East Luwu | South Sulawesi | Sulawesi | 3 x 65 | 195 | INCO | Private | Turbines @ 67.3 MW supplied by Sulzer & GE and Generators @ 85 MVA supplied by Hitachi & VA Tech Hydro |
Balambano hydro | Soroako | East Luwu | South Sulawesi | Sulawesi | 2 x 70 | 140 | INCO | Private | Turbines @ 68.5 MW and Generators @ 80.6 MVA both supplied by Canadian General Electric |
Karebbe hydro | Soroako | East Luwu | South Sulawesi | Sulawesi | 2 x 66 | 132 | INCO | Private | Turbines @ 63.7 MW and Generators @ 78 MVA both supplied by VA Tech Hydro |
Pamona 2 hydro | Pamona Utara | Poso | Central Sulawesi | Sulawesi | 4 x 65 | 260 | PT. Poso Energi | Private | Turbines @ 66.66 MW and Generators @ 72.2 MVA |
Riam Kanan hydro | Aranio | Martapura | South Kalimantan | Kalimantan | 3 x 10 | 30 | PT. PLN | Government | Turbines @ 10.5 MW and Generators @ 11 MVA both supplied by Fuji Electric Co,. Ltd, Japan |
Total | 88 | 4,755 |
Pumped-storage hydroelectric
Currently under construction or planned:Power station | Location | District | Province | Region | Capacity per Unit | Installed Capacity | Operator | Sector | Remarks |
Upper Cisokan pumped storage hydro | Cianjur Cisokan river and Cirumamis river | Cianjur and Bandung Barat | West Java | Java-Bali | 4 x 260 MW pump turbine or 4 x 275 MVA motor generator | 1,040 MW pump turbine or 1,100 MVA motor generator | PT. PLN | Government | |
Matenggeng pumped storage hydro | Majenang Cijolang river and Cimancing river | Ciamis | West Java | Java-Bali | 2 x 443 MW pump turbine or 2 x 460 MVA motor generator | 886 MW pump turbine or 920 MVA motor generator | PT. PLN | Government | |
Grindulu pumped storage hydro | Tegalombo | Pacitan | East Java | Java | 4 x 260 MW pump turbine or 4 x 75 MVA motor generator | 1,040 MW pump turbine or 1,100 MVA motor generator | PT. PLN | Government | |
Kali Konto pumped storage hydro | Bandar Kedungmulyo | Jombang | East Java | Java-Bali | 4 x 260 MW pump turbine or 4 x 275 MVA motor generator | 1,040 MW pump turbine or 1,100 MVA motor generator | PT. PLN | Government | |
Lake Toba pumped storage hydro | Toba | Toba Samosir | North Sumatera | Sumatera | 4 x 110 MW pump turbine or 4 x 125 MVA motor generator | 4900 MW pump turbine or 500 MVA motor generator | PT. PLN | Government | |
Total | 18 Units | 1364 MW pump turbine or 4,720 MVA motor generator |