List of power stations in Indonesia


The following lists some of the larger power stations in Indonesia. Data are not included for a large number of small isolated plants in the Outer Islands. In total, the PLN operated over 5,000 plants across Indonesia in 2010 of which over 4,500 were small diesel plants outside of Java. For further details about existing capacity and operations of the electricity sector, see information about the state-owned Indonesian electricity company Perusahaan Listrik Negara.

Summary table

Non-renewable

Thermal

is the largest source of power in Indonesia. There are different types of thermal power plants based on the fuel used to generate the steam such as coal, gas, diesel etc. About 85% of electricity consumed in Indonesia is generated by thermal power plants.

Bituminous coal or lignite

Existing
Note: IPP means independent power producer
Power stationLocationDistrictProvinceRegionCoordinatesCapacity per unit
Installed capacity
OperatorSectorNotesRefs
Bukit Asam coal-firedTanjung EnimMuara EnimSouth SumatraSumatra4 x 65260PT. PLNGovernmentBoiler from Stein, Turbines from Rateau and generators from GEC Alstom
Paiton coal-firedPaitonProbolinggoEast JavaJava-Bali2 x 400800PT. PLNGovernmentBoiler from ABB Combustion Engineering, Turbines and generators from Toshiba
Ombilin coal-firedOmbilinSawahluntoWest SumatraSumatra2 x 100200PT. PLNGovernmentBoiler from Stein, Turbines and generators from GEC Alstom
Suralaya coal-firedSuralayaCilegonBantenJava-Bali4 x 400
3 x 600
3,400PT. Indonesia PowerGovernmentBoiler from Babcock & Wilcox Canada, Turbines from MHI Japan; generators from Mitsubishi Electric Co.
Suralaya Baru coal-firedSuralayaCilegonBantenJava-Bali1 x 625625PT. Indonesia PowerGovernmentBoiler from Shanghai Co. Ltd, Turbines and generators from Shanghai Co. Ltd
PaitonPaitonProbolinggoEast JavaJava-Bali2 x 670
2 x 610
1 x 850
2,300PT. Paiton Energy PrivateBoiler supplied by ABB, Turbines and Generators supplied by GE
Tanjung Jati-B I coal-firedBangsriJeparaEast JavaJava-Bali2 x 6621,320PT. Central Java Power PrivateBoiler supplied by Babcock & Wilcox, Turbines and Generators supplied by Toshiba
Tanjung Jati-B II coal-firedBangsriJeparaEast JavaJava-Bali2 x 6621,320PT. Central Java Power PrivateBoiler supplied by Mitsubishi Heavy Industry, Turbines and Generators supplied by Toshiba
Cirebon coal-firedKanci KulonCirebonWest JavaJava-Bali1 x 660660PT. Cirebon Electric Power PrivateBoiler, Turbines and Generators supplied by Doosan Heavy Industries and Construction Co., Ltd.
CilacapKarangkandriCilacapCentral JavaJava-Bali2 x 300600PT. Sumber Segara Primadaya GovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Cilacap Adipala coal-firedAdipalaCilacapCentral JavaJava-Bali1 x 660660PT. Indonesia PowerGovernmentBoiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd
Indramayu coal-firedSumur AdemIndramayuWest JavaJava-Bali3 x 330990PT. PLNGovernmentBoiler supplied by Babcock & Wilcox Beijing Co., Turbines and Generators supplied by Beijing Beizhong
Pacitan coal-firedSukorejoPacitanEast JavaJava-Bali2 x 315630PT. PLNGovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Tarahan coal-firedTarahanSouth LampungLampungSumatra2 x 100200PT. PLNGovernmentBoiler supplied by Jinan Co. Ltd, Turbines and Generators supplied by Wuhan Co. Ltd
Labuan coal-firedLabuanPandeglangBantenJava-Bali2 x 300600PT. Indonesia PowerGovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Labuhan Angin coal-firedLabuhan AnginCentral TapanuliNorth SumatraSumatra2 x 115230PT. PLNGovernmentBoiler supplied by Foster Wheeler, Turbines and Generators supplied by Shanghai Turbine Co. Ltd.
Lontar coal-firedLontar, Teluk NagaTangerangBantenJava-Bali3 x 315945PT. Indonesia PowerGovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Pelabuhan Ratu coal-firedPelabuhan RatuSukabumiWest JavaJava-Bali3 x 3501050PT. Indonesia PowerGovernmentBoiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd
Rembang coal-firedSlukeRembangCentral JavaJava-Bali2 x 315630PT. PLNGovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Bangka Belitung 3 coal-firedAir AnyirBangkaBangka BelitungSumatera2 x 3060PT. BMP Government
Total5018,630 -
Proposed or under construction
Thermal
Power stationLocationDistrictProvinceRegionCapacity per Unit
Installed Capacity
OperatorSectorRemarks and Plant Coordinates
Java 4 coal-firedTubanan, KembangJeparaCentral JavaJava-Bali2 x 10002,000PT. Bhumi Jati PowerPrivate
Java 7 coal-firedKramatwatuSerangBantenJava-Bali2 x 10002,000PT. Shenhua Guohua Pembangkitan Jawa BaliPrivate
Central Java coal-fired UjungnegoroBatangCentral JavaJava-Bali2 x 10002,000PT. Bhimasena Power IndonesiaPrivate
Tanjung Awar-Awar coal-firedKaliuntuTubanEast JavaJava-Bali2 x 350700PT. PLNGovernmentBoiler supplied by Babcock & Wilcox Beijing Co. Turbines and generators supplied by Beijing Beizhong
Madura coal-firedPamekasanEast JavaJava-Bali2 x 100200PT. PLNGovernment
Bojonegara coal-firedBojonegaraCilegonBantenJava-Bali3 x 7402,220PT. PLNGovernment
Tanjung Jati-A coal-firedCirebonCirebonWest JavaJava-Bali2 x 6601,320PT. Bakrie PowerPrivate
Nusa Penida coal-firedNusa PenidaBaliJava-Bali2 x 100200PT. PLNGovernment
Anyer coal-firedAnyerBantenJava-Bali1 x 330330PT. PLNGovernment
Kuala Tanjung coal-firedKuala TanjungSouth SumatraSumatra2 x 112224PT. Ranyza EnergiPrivate
Banjarsari coal-firedBanjarsariLahatSouth SumatraSumatra2 x 100200PT. Bukit Pembangkit InnovativePrivate
Banyuasin coal-firedBanyuasinBanyuasinSouth SumatraSumatra2 x 100200PT. Banyuasin Power EnergyPrivate
Baturaja coal-firedBaturajaOgan Komering UluSouth SumatraSumatra2 x 100200PT. Priamanaya Power EnergiPrivate
Simpang Belimbing coal-firedGunung RajaMuara EnimSouth SumatraSumatra2 x 150300PT. GH EMMIPrivate
Arahan coal-firedArahanMuara EnimSouth SumatraSumatra4 x 6002,400PT. PLNGovernment
Central Bangko coal-firedBangko TengahMuara EnimSouth SumatraSumatra4 x 6202,480PT. BA & CHD Private
West Kalimantan 1 coal-firedTanjung GundulBengkayangWest KalimantanKalimantan2 x 100200PT. GCL IndotenagaGovernment - Private
Tanjung coal-firedTanjungTabalongSouth KalimantanKalimantan2 x 55110PT. PLNGovernment
Total3417,264

Gas or liquid fuel

Renewable

Geothermal

Note: IPP means independent power producer
Power stationLocationDistrictProvinceRegionCapacity per Unit
Installed Capacity
OperatorSectorRemarks
Kamojang geothermalKamojangGarutWest JavaJava-BaliUnit I = 30
Unit II = 55
Unit III = 55
Unit IV = 60
Unit V = 35
235PT. Indonesia PowerGovernmentUnit IV 63 MW turbine capacity and 80 MVA generator capacity both from Fuji Electric, Kawasaki, Japan
Darajat geothermalKamojangGarutWest JavaJava-BaliUnit I = 5555PT. Indonesia PowerGovernment
Darajat geothermalKamojangGarutWest JavaJava-BaliUnit II = 90
Unit III = 110
200PT. Pertamina, Chevron Geothermal Indonesia, Ltd,
PrivateTurbines Unit II = 81.3 MW & Unit III = 110 MW and Generators Unit II = 101.625 MVA & Unit III = 137.5 MVA both supplied by Fuji Electric, Kawasaki, Japan
Gunung Salak geothermalParung KudaSukabumiWest JavaJava-Bali3 x 60180PT. Indonesia PowerGovernmentTurbines @ 55 MW and Generators @ 55 MVA both supplied by Ansaldo Energia, Italy
Gunung Salak geothermalParung KudaSukabumiWest JavaJava-Bali3 x 55165Chevron Geothermal Salak Ltd and Dayabumi Salak Pratama Ltd PrivateTurbines @ 59.5 MW and Generators @ 74.375 MVA both from Fuji Electric, Kawasaki, Japan
Ulubelu Geothermal Power Station UlubeluTanggamusLampungSumatra2 x 55110PT.PLNGovernmentTurbines 2 x 55 MW and Generators 2 x 55 MVA both from Fuji Electric, Kawasaki, Japan
Wayang Windu geothermalPengalenganBandungWest JavaJava-Bali1 x 110
1 x 117
227PT. Pertamina and Magma Nusantara Ltd. PrivateTurbines 110 MW & 117 MW and Generators 2 x 137.5 MVA both from Fuji Electric, Kawasaki, Japan
Dieng geothermalDiengBanjarnegaraCentral JavaJava-Bali1 x 6060PT. Geo Dipa Energi Private
Lahendong geothermalLahendongMinahasaNorth SulawesiSulawesiUnit I = 20
Unit II = 20
Unit III = 20
Unit IV = 20
80PT. PLNGovernment* Unit I: turbines = 20 MW and generator = 25 MVA both from Alstom
* Unit II: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan
* Unit III: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan
* Unit IV: turbines = 20 MW and generator = 25 MVA both supplied by Fuji Electric, Kawasaki, Japan
Sibayak geothermalSibayakKaroNorth SumatraSumatra2 x 5.6511.3PT. Dizamatara Powerindo
PrivateTurbines @ 5.85 MW and Generators @ 6 MVA, 5.65 MW at PF 0.94
Patuha geothermalPatuhaBandungWest JavaJava-BaliUnit 1 = 5555
PT. Geo Dipa Energi
PrivateTurbines Unit 1 = 60 MW and Generator Unit 1 = 75 MVA both supplied by Toshiba
Total191,344

Hydroelectric

Note: IPP means independent power producer
Power stationLocationDistrictProvinceRegionCapacity per Unit
Installed Capacity
OperatorSectorRemarks
Agam hydroBatang AgamAgamWest SumatraSumatra3 x 3.510PT. PLNGovernmentTurbines @ 3.55 MW and Generators @ 3.95 MVA both supplied by Ebara
Maninjau hydroManinjauAgamWest SumatraSumatra4 x 1768PT. PLNGovernmentTurbines @ 17.4 MW and Generators @ 20 MVA both supplied by Toshiba
Singkarak hydroSingkarakSolokWest SumatraSumatra4 x 43.75175PT. PLNGovernmentTurbines @ 43.75 MW supplied by VoestAlpine and Generators @ 52 MVA supplied by ELIN
Koto Panjang hydroKoto PanjangKamparRiauSumatra3 x 38114PT. PLNGovernmentTurbines @ 39.4 MW supplied by Kvaerner Boving and Generators @ 45 MVA supplied by ELIN
Test I hydroTesRejang LebongBengkuluSumatra4 x 416PT. PLNGovernmentTurbines @ 4.7 MW supplied by Ansaldo Energia
Musi hydroUjanmas AtasKepahiangBengkuluSumatra3 x 70210PT. PLNGovernmentTurbines @ 70 MW and Generators @ 86 MVA both supplied by VA Tech Hydro
Besai hydroSumberjayaWest LampungLampungSumatra2 x 4590PT. PLNGovernmentTurbines @ 46.4 MW and Generators @ 53 MVA both supplied by VA Tech Hydro
Batutegi hydroTanggamusWest LampungLampungSumatra2 x 1428PT. PLNGovernmentTurbines @ 14.2 MW and Generators @ 15.7 MVA both supplied by Toshiba
Lau Renun hydroSilalahiDairiNorth SumatraSumatra2 x 4182PT. PLNGovernmentTurbines @ 41 MW and Generators @ 47.5 MVA both supplied by VA Tech Hydro
Sipansihaporas hydroSipansihaporasCentral TapanuliNorth SumatraSumatra1 x 33
1 x 17
50PT. PLNGovernmentPower Station 1 = Turbines 34 MW by Meiden, Japan and Generator 39 MVA by Toshiba
Power Station 2 = 17.6 MW Meiden, Japan and Generator 20 MVA by Toshiba
Asahan I hydroParmaksianToba SamosirNorth SumatraSumatra2 x 90180PT. Bajradaya Sentranusa
PrivateTurbines and Generators supplied by Dongfang Electric Corp. Ltd
Asahan III hydroPintu Pohan MerantiToba SamosirNorth SumatraSumatra2 x 87174PT. PLNGovernment
Sigura-gura hydroSimoreaAsahanNorth SumatraSumatra4 x 71.50286PT. InalumPrivateTurbines @ 71.5 MW and Generators @ 80 MVA both supplied by Toshiba
Tangga hydroTanggaAsahanNorth SumatraSumatra4 x 79.25317PT. InalumPrivateTurbines @ 81.1 MW supplied by Hitachi Ltd. and Generators @ 90 MVA supplied by Mitsubishi Electric
Wampu hydroKota BuluhKaroNorth SumatraSumatra3 x 1545PT. Wampu Electric Power
Private
Kerinci hydroBatang MeranginKerinciJambiSumatra6 x 30180PT. PLNGovernmentTurbines @ 30 MW and Generators @ 33.33 MVA
Saguling hydroRajamandalaCimahiWest JavaJava-Bali4 x 175.18701PT. Indonesia PowerGovernmentTurbines @ 175.18 MW supplied by Toshiba and Generators @ 194? MVA supplied by Mitsubishi Electric Co,.
Cirata hydroPleredPurwakartaWest JavaJava-Bali8 x 1261,008PT. Pembangkitan Jawa BaliGovernmentTurbines @ 129.6 MW supplied by VoestAlpine and Generators @ 140 MVA supplied by ELIN
Jatiluhur hydroJatiluhurPurwakartaWest JavaJava-Bali6 x 31186PT. Jasa Tirta IIGovernmentTurbines @ 32.3 MW supplied by NEYRPIC and Generators @ 35 MVA supplied by GEC Alsthom Jeumont
PB. Sudirman hydroMricaBanjarnegaraCentral JavaJava-Bali3 x 60.3181PT. Indonesia PowerGovernmentTurbines supplied by Boving and Generators supplied by ASEA
Sutami hydroKarangkatesMalangEast JavaJava-Bali3 x 35105PT. Pembangkitan Jawa BaliGovernment
Wlingi hydroWlingiMalangEast JavaJava-Bali2 x 2754PT. Pembangkitan Jawa BaliGovernment
Tonsea Lama hydroTondanoMinahasaNorth SulawesiSulawesi1 x 4.44
1 x 4.50
1 x 5.44
14PT. PLNGovernment
Tanggari I & II hydroTondanoMinahasaNorth SulawesiSulawesi1 x 17.20
1 x 19
36PT. PLNGovernment
Bakaru I & II hydroBakaruPinrangSouth SulawesiSulawesi2 x 63
1 x 65
191PT. PLNGovernment
Larona hydroSoroakoEast LuwuSouth SulawesiSulawesi3 x 65195INCOPrivateTurbines @ 67.3 MW supplied by Sulzer & GE and Generators @ 85 MVA supplied by Hitachi & VA Tech Hydro
Balambano hydroSoroakoEast LuwuSouth SulawesiSulawesi2 x 70140INCOPrivateTurbines @ 68.5 MW and Generators @ 80.6 MVA both supplied by Canadian General Electric
Karebbe hydroSoroakoEast LuwuSouth SulawesiSulawesi2 x 66132INCOPrivateTurbines @ 63.7 MW and Generators @ 78 MVA both supplied by VA Tech Hydro
Pamona 2 hydroPamona UtaraPosoCentral SulawesiSulawesi4 x 65260PT. Poso Energi
PrivateTurbines @ 66.66 MW and Generators @ 72.2 MVA
Riam Kanan hydroAranioMartapuraSouth KalimantanKalimantan3 x 1030PT. PLNGovernmentTurbines @ 10.5 MW and Generators @ 11 MVA both supplied by Fuji Electric Co,. Ltd, Japan
Total884,755

Pumped-storage hydroelectric

Currently under construction or planned:
Power stationLocationDistrictProvinceRegionCapacity per Unit
Installed Capacity
OperatorSectorRemarks
Upper Cisokan pumped storage hydro Cianjur
Cisokan river and Cirumamis river
Cianjur and
Bandung Barat
West JavaJava-Bali4 x 260 MW pump turbine or
4 x 275 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLNGovernment
Matenggeng pumped storage hydro Majenang
Cijolang river and Cimancing river
CiamisWest JavaJava-Bali2 x 443 MW pump turbine or
2 x 460 MVA motor generator
886 MW pump turbine or
920 MVA motor generator
PT. PLNGovernment
Grindulu pumped storage hydro TegalomboPacitanEast JavaJava4 x 260 MW pump turbine or
4 x 75 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLNGovernment
Kali Konto pumped storage hydro Bandar KedungmulyoJombangEast JavaJava-Bali4 x 260 MW pump turbine or
4 x 275 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLNGovernment
Lake Toba pumped storage hydro TobaToba SamosirNorth SumateraSumatera4 x 110 MW pump turbine or
4 x 125 MVA motor generator
4900 MW pump turbine or
500 MVA motor generator
PT. PLNGovernment
Total18 Units1364 MW pump turbine or
4,720 MVA motor generator