Line 6 of the Mumbai Metro, or the Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Line, is part of the metro system for the city of Mumbai, India. This line is fully elevated.

Plans

The 14.47 km long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Metro-VI corridor is to have 13 stations and cost Rs. 6,672 crore. It is to be an elevated corridor.
It is to connect Swami Samarth Nagar-Lokhandwala in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, Jogeshwari-Vikhorli Link Road, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg and Vikhroli - Eastern Express Highway. Metro 6 is to provide interchange with Metro 2 at Adarsh Nagar, with Metro 3 at SEEPZ, with Metro 4 at Kanjurmarg, with Metro 7 at Jogeshwari Vikhroli Link Road and the Mumbai Suburban Railway at Jogeshwari on Western Railways and Kanjurmarg on Central Railway. Construction is to begin by December 2018. It is to be ready by 2021–22.

History

The line was approved by Chief Minister Fadnavis on 19 October 2016. The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities were to determine the location of trees along the alignment with an accuracy of up to 10 cm, utilizing a differential GPS, while a digital aerial triangulation system is to help determine the types of trees, their heights and diameters.

Current status

Stations

The line will consist of 13 stations starting from Swami Samarth Nagar in Lokhandwala Complex, Andheri to Vikhroli. It will have interchanges with Lines 2, 7, 3 and 4.
#StationInterstation DistanceGradeConnections
1Swami Samarth NagarElevated-
2Adarsh NagarElevatedLine 2
3Jogeshwari ElevatedJogeshwari railway station
Western Line
4Jogeshwari-Vikhroli Link RoadElevated Line 7
5Shyam NagarElevated-
6Mahakali CavesElevated-
7SEEPZ VillageElevatedLine 3
8Saki Vihar RoadElevated-
9RambaugElevated-
10Powai LakeElevated-
11IIT PowaiElevated-
12Kanjurmarg ElevatedLine 4
Kanjurmarg railway station
Central Line
13Vikhroli Elevated-