The idea of constructing the canal came from the Russian tsar and reformer Peter I. He decided to decorate the Summer Garden with fountains supplied by water delivered by gravity feed. A small river, Liga, near, became the source of the water. The project's designer was G. Skornyakov-Pisarev, who also supervised the canal's construction. Except for the basic function of activating the fountains, the canal was used as a water main and as a defensive boundary, protecting the capital from the southeast. The project was completed in three years, 1718–21. It is known that the canal had at least two bridges, one at Moskovsky Prospekt and one at Znamenskya Square. Later when the Obvodny Canal was built at the beginning of the 20th century, Yamskoi Vodoprovodniy Aqueduct was built by Russian engineer Ivan Gerard. Later a bridge over was constructed. Details of its dismantling are not extant. It is probable it was demolished together with the canal and has remained underground. The Flooding of destroyed the fountains of the Summer Garden and the reason for the canal disappeared. In addition, the water in the canal became muddy and undrinkable. The canal gradually became unfit for use and was gradually filled in:
In 1891–92, the site from Tauride garden to Obvodny Canal was filled in. Yamskoi Vodoprovodniy Aqueduct was reconstructed in 1895 and was renamed Novo-kamenniy bridge. Granite basins by the bridge existed before the beginning 20th century, when they were dismantled as superfluous.
In 1926, the site from Obvodny Canal to Moskovsky Prospekt was filled in
Near to a railway line the Luga canal waters go underground and come to the surface near the Krasnenkaya River. There the canal is divided into two channels: the majority of the canal waters are carried away by the Krasnenkaya River, the smaller branch goes underground and exits into the ponds of the Aviatorov Garden. The length of the remaining part is. in 1834–38 on the bank of the canal the Moscow Triumphal Gate was constructed. It was built mainly in cast iron. The filled in Ligovsky Canal became a hindrance to the subsequent construction of a metro stationPloshchad Vosstaniya - a wet stratum greatly complicated works. They were overcome, applying a caisson with an hydrochloric solution in 1950.