Kağıthane is a proposed rapid transit complex, currently under construction, on the M7 and M11 lines of the Istanbul Metro. The complex will be located above ground on the metro viaducts crossing the Kağıthane Creek. The M7 platform of the complex is expected to open in 2020, with the expected opening of the M11 platform in the early 2020s.
Kağıthane station was originally planned to be completed in 2017, however construction delays have pushed the opening back to first 2018 and then 2019. The complex will be the first metro station within central Kağıthane.