Interstate 96


Interstate 96 is an east–west Interstate Highway that runs for approximately entirely within the Lower Peninsula of the US state of Michigan. The western terminus is at an interchange with US Highway 31 and Business US 31 on the eastern boundary of Norton Shores southeast of Muskegon, and the eastern terminus is at I-75 near the Ambassador Bridge in Detroit. From Grand Rapids through Lansing to Detroit, the freeway parallels Grand River Avenue, never straying more than a few miles from the decommissioned US 16. The Wayne County section of I-96 is named the Jeffries Freeway from its eastern terminus to the junction with I-275 and M-14. Though maps still refer to the freeway as the Jeffries, the portion within the city of Detroit was renamed by the state legislature as the Rosa Parks Memorial Highway in December 2005 in honor of the late civil rights pioneer. There are four auxiliary Interstates as well as two current and four former business routes associated with I-96.
Grand River Avenue originated as an Indian trail before Michigan statehood. It later was used as a wagon road across the state. The roadway was included in the State Trunkline Highway System in 1919 as M-16 and later the United States Numbered Highway System as US 16. Construction of a freeway along the length of the corridor was proposed in the 1940s, and included as part of the Interstate Highway System in the mid-1950s. This construction was started in 1956 and initially completed across the state to Detroit in 1962. The proposed route for the Jeffries Freeway in Detroit was moved in the 1960s; it was built in the 1970s. I-96 was completed on November 21, 1977, in the Detroit area, closing the last gap along the route. Since then, additional interchanges and lanes have been added in places to accommodate traffic needs.

Route description

I-96 is maintained by the Michigan Department of Transportation as a segment of the larger State Trunkline Highway System. In 2011, the department's traffic surveys showed that on average, 201,200 vehicles used the highway daily between 6 and 7 Mile roads in Livonia. Near Norton Shores, 20,638 vehicles did so each day between Airline and Fruitport roads. These are the highest and lowest counts along the highway, respectively. As an Interstate Highway, all of I-96 is included in the National Highway System, a network of roads important to the country's economy, defense, and mobility. In addition, the highway in Detroit has been named the Rosa Parks Memorial Highway by the Michigan Legislature to honor the civil rights pioneer Rosa Parks. The segment from Livonia west to I-275 is the Jeffries Freeway, named for a former mayor of Detroit, Edward Jeffries.

Muskegon to Grand Rapids

I-96 begins at a three-quarter cloverleaf interchange with US 31 northeast of the Muskegon County Airport in Norton Shores, near Muskegon. At the starting terminus, the highway has a grassy median and two lanes in each direction as it travels southeasterly through rural Muskegon County. The freeway is paralleled by Airline Highway in an area with a mix of fields and residences as far as Fruitport. I-96 bypasses that village to the north and east before crossing into Ottawa County at Fruitport Road. After a distance of about in the county, the trunkline reaches Nunica. The highway crosses the Crockery Creek and turns eastward toward Coopersville. The freeway runs parallel to the Grand River, about to the north. Near Ironwood Drive, I-96 turns southeasterly again and goes through Marne.
Beyond Marne, I-96 passes the western end of M-11 and crosses into Kent County, curving around a rest area for the eastbound lanes. The freeway runs eastward through a light industrial area of the suburb of Walker as it enters the Grand Rapids metropolitan area. At the interchange with Alpine Avenue, M-37 merges onto the freeway and the two run concurrently past the studios for WZZM-TV with its iconic weatherball, a sphere above the ground that uses colored lights to display a weather forecast. Adjacent to the studios are the ramps from eastbound I-96 to southbound US 131 and from northbound US 131 to westbound I-96. These ramps mark the northern end of I-296, an unsigned auxiliary Interstate Highway designation applied to them and the US 131 freeway south to downtown Grand Rapids. I-96 turns northeasterly past a commercial area to a three-quarter cloverleaf interchange that provides all of the other connections with US 131 next to a crossing of the Grand River.
East of the river, I-96 and M-37 pass through the northern suburb of Comstock Park, intersecting Connector M-44 near Lamberton Lake. Past that interchange, the freeway angles southeasterly and then southward, bypassing Grand Rapids to the northeast. East of downtown, I-96/M-37 meets I-196 at a partial interchange; traffic headed eastbound on I-196 must enter I-96 eastbound and only westbound I-96 traffic may enter I-196. Immediately east of the interchange is another for M-44 where M-37 separates from the freeway to turn southward. Through this series of interchanges, I-96 curves to the east and then turns back southward after passing through them. There are two more interchanges for M-21 and Cascade Road before I-96 meets the eastern end of M-11 at 28th Street. The next interchange for 36th Street provides access to the Gerald R. Ford International Airport. The freeway continues to the east of the airport and then intersects the eastern end of M-6 at an interchange over the confluence of the Thornapple and Grand rivers.

Grand Rapids to Howell

The freeway exits the edges of the Grand Rapids urban area past the interchange with M-6, turning due east and paralleling the northern edge of Cascade Road. I-96 curves to the south of Pratt Lake near the county line, crossing into Ionia County. Grand River Avenue is the frontage road as the freeway heads east through farm fields. South of Ionia, I-96 intersects M-66. Near Portland, the trunkline turns to the southeast to cross the Grand River again. On the east side of town, the freeway crosses Grand River Avenue, its former business spur into town. I-96 continues southeasterly, crossing into Clinton County, and passes the community of Eagle. Entering the western reaches of the Lansing metropolitan area, I-96 merges with I-69 and turns southward at an interchange in the southwestern corner of the county; this interchange also provides access to Business Loop I-96.
These two Interstates run southward together for about on the west side of the metropolitan area, picking up a third lane in each direction. The exit numbers and mileposts along the concurrency reflect those of I-96, which is considered the dominant designation of the pair. South of that interchange, the freeway crosses into Eaton County and over the Grand River. The trunkline passes near residential subdivisions, and next to the interchange for BL I-69/M-43, there is a large retail development. Further south, I-496 branches off to run into downtown Lansing before the split between I-96 and I-69. I-69 turns southward while I-96 turns southeasterly, dropping back to four lanes in total. After the Lansing Road interchange, the freeway crosses the Grand River one last time and runs due east to bypass Lansing.
I-96 crosses into Ingham County and continues along the southern edges of the Lansing metro area. It passes through areas with residential subdivisions and commercial developments, coming to a pair of interchanges including one for the eastern end of BL I-96. Near the crossing of the Red Cedar River, I-96 goes through the interchange for I-496/US 127. East of that interchange, the freeway begins to exit the metro area as the landscape transitions back to farm fields. I-96 continues eastward, bypassing Williamston and Webberville to the south. Near the latter, the freeway turns more southeasterly and crosses into Livingston County. In Livingston County, I-96 passes to the south of Fowlerville and then enters the far northwestern edge of Metro Detroit, passing south of Howell. From this point, the freeway expands to six lanes and runs parallel to Grand River Avenue on the southern side of town.

Metro Detroit

Near the Livingston County Spencer J. Hardy Airport on the western edge of Howell, I-96 meets M-59, which runs to Pontiac and carries the Howell business loop easterly to Grand River Avenue. The business loop reconnects near Lake Chemung on the east side of town, and I-96 turns further to the southeast. On the northeast side of Brighton, I-96 crosses over Grand River Avenue and the landscape transitions to include residential subdivisions. I-96 proceeds to cross US 23.
I-96 passes through an area with several lakes as it crosses into Oakland County. This area includes the Island Lake State Recreation Area to the south and the Kensington Metropark to the north of the freeway in an area where it crosses the Huron River. The Interstate runs through Wixom into Novi, where it passes to the south of the Twelve Oaks Mall. Southeast of the mall, I-96 enters a complex interchange on the border between Novi and Farmington Hills that connects it to M-5, I-275 and I-696. The trunkline drops a lane in each direction as it enters the interchange and turns southward. The freeway then merges into I-275 and increases to four lanes in each direction running south in Farmington Hills.
According to the Federal Highway Administration, I-275 ends at the junction with I-96 and M-14 along the boundary between Livonia and Plymouth Township and not at the interchange in Novi and Farmington Hills. MDOT considers I-275 to extend northward concurrently with I-96 to the Novi and Farmington Hills, and maps from other providers follow MDOT's lead and label the freeway north of M-14 as I-96/I-275.
I-96/I-275 runs southward for about before crossing into Wayne County at the interchange with 8 Mile Road near the Meadowbrook Country Club. The freeway curves to the east around Schoolcraft College; then, south of 5 Mile Road, I-96 meets the interchange with M-14 and I-275 where it turns to the east along the Jeffries Freeway. To the north and south sides of I-96 are a pair of service drives named Schoolcraft Road which follow the 4 Mile location on the Mile Road System for Detroit. To the north of the Jeffries are residential neighborhoods and to the south are commercial or industrial areas. At Inkster Road, the freeway crosses into Redford Township where it intersects US 24 near Eliza Howell Park. East of the park, I-96 enters Detroit.
Past the Outer Drive interchange, I-96 splits into a local-express lanes configuration. There are two carriageways in each direction, and the central ones have three lanes that bypass almost all of the exits while the outer ones have two lanes that have access to each exit. The Jeffries turns southeasterly and separates from Schoolcraft Road shifting to the south. The interchange with M-39 features slip ramps so that traffic can pass between the local and express lanes. Further east, I-96 turns northeasterly to cross Grand River Avenue at the southern end of M-5. I-96 curves over to the interchange with M-8 and the local-express configuration ends as the freeway turns back to the south to cross over Grand River Avenue.
From the crossing south of Davison, I-96 runs parallel to Grand River Avenue southeasterly with eight lanes total. The two run together as far as the interchange with I-94 near Bishop Park. I-96 turns more south-southeasterly there through residential neighborhoods on Detroit's southeastern side. I-96 terminates at an interchange that connects it to I-75 and to the Ambassador Bridge.

History

Interstate 96 was mostly constructed in sections that opened from 1957 to 1962, but it was not completed in the Detroit area until 1977. Even before the National Interstate and Defense Highways Act was signed in 1956, the route was being planned as a replacement of the old US 16, which was decommissioned in 1962.

Beginnings

The Muskegon–Grand Rapids–Lansing–Detroit corridor was initially named the Grand River Road, an Indian trail that was designated as a military highway in 1825. The roadway was included as a branch of "Division 2" of the State Trunkline Highway System when that was created in May 1913. When the system was signposted in 1919, the highway was assigned the M-16 designation. Grand River Avenue was the first paved highway across the state when paving was completed in 1926. The entire highway was designated as part of US 16 later that year.
East of Grand Rapids, the highway was a major artery of national importance, and was added to the proposed "Interregional Highway System" as part of a northern route between Chicago and Detroit by the 1940s. A branch from Grand Rapids to Muskegon was added later that decade, and in 1957 the Chicago–Detroit route was labeled as part of Interstate 94, with Interstate 94N on the spur to Muskegon. Michigan, believing that this would "cause considerable confusion to the public", requested a change in April 1958, which would move I-94 to the shorter Kalamazoo route, make the Muskegon–Detroit route I-96, and assign I-67 to the connection from I-94 to I-96 at Grand Rapids, but this was initially rejected by the American Association of State Highway Officials. By mid-1959, Michigan's plan had been approved, with one change: I-96 would take the south leg from I-94 at Benton Harbor to Grand Rapids, and the north leg to Muskegon would be I-196.
Construction of the Brighton–Farmington Expressway piece of the US 16 upgrade began in 1956, and, when a piece opened on August 1, 1957, it was the first section of funded Interstate to open in Michigan. The entire freeway from east of Brighton to a bypass of Farmington was completed in December of that year. By early 1959, when signs for I-96 and I-196 were posted, of the "Detroit–Muskegon Freeway" had been completed and marked as US 16. With the opening of from west of Lansing to east of Howell, the entire route, except in the Detroit area, opened for travel on December 12, 1962. US 16 was decommissioned in the state at that time; the portions into Muskegon and Detroit, beyond the ends of the freeway, became separate related highways named Business Spur Interstate 196 for Muskegon and for Detroit.
In 1963, the Michigan State Highway Department petitioned AASHO to again make the change it had requested back in 1958, moving I-96 over I-196 to end at Muskegon and renumbering I-96 west of Grand Rapids to I-67. The state cited problems with destination signing and numerous complaints from the public about confusion caused by the numbering. At their October 21, 1963 meeting, AASHO approved the relocation of I-96, but rejected I-67, stating that the number should be kept for a more major route in case the system is expanded, and instead assigned I-196 to the not-yet-complete Benton Harbor–Grand Rapids highway. The signage was switched in January 1964. With the scheduled completion of the Lodge Freeway on October 29, 1964, a full freeway route was available from I-96 into downtown Detroit via I-696 and the Lodge, but it would be some time before I-96 was finished into the city.

Construction of the Jeffries Freeway

The Detroit Expressway and Transit System plan, prepared in 1945 for the city of Detroit, included a Grand River Expressway, which was to parallel Grand River Avenue into downtown and relieve congestion on that artery. A rail line would be built in the median of the freeway west of West Chicago Street, where streetcars would exit onto the existing surface tracks on Grand River Avenue into downtown. The plan called for a future conversion to rapid transit with a grade-separated route to downtown. The Department of Street Railways determined in 1947 that the operation would cost $6 million per year, and the planned transit line was dropped from the plans. By 1961, the proposed highway was renamed the Jeffries Freeway, after Edward Jeffries, who served as Detroit mayor from 1940 to 1948.
The first piece of the Jeffries Freeway connected the Fisher Freeway with the Ford Freeway in 1970. It was extended northwest to Livernois Avenue in July 1971, and then to Grand River Avenue at Schaefer Highway in 1973. In 1976, the freeway was extended west to the Southfield Freeway, and the entire I-275 concurrent section was opened. The final piece was completed on November 21, 1977, connecting the Detroit section to I-275. The I-96 designation was assigned along the I-275 freeway south to the Jeffries Freeway, and eastward along the new freeway to the M-39 interchange; the remaining stub of I-96 around Farmington was redesignated as an extension of M-102.
Originally, the route of Interstate 96 from the east end of the existing freeway in Farmington through Detroit, named the Jeffries Freeway, was to closely parallel Grand River Avenue. However, by 1963, several freeway revolts were taking place in urban locations throughout the country, including Detroit. Several of Detroit's planned freeways were modified, scaled back, or outright cancelled. To minimize the impact to existing communities and businesses, it was decided that the Jeffries Freeway would no longer utilize the Grand River Avenue corridor. Instead, the new I-96 freeway corridor would partially use right-of-way from the C&O Railroad through the city of Livonia, and utilize the planned I-275 freeway bypassing Detroit to the west to connect back to the existing freeway.

Subsequent history

Since the completion of I-96 in 1977, several changes to the freeway have taken place. Beginning in 1984, an extension of the US 27 freeway bypassing Lansing opened; US 27 was then cosigned with I-96 along the western side of Lansing. Three years later, the I-69 designation was applied to this new bypass, resulting in a triple concurrency that existed until 2002, when US 27 was decommissioned in Michigan.
From 2003 to 2005, the Beck Road interchange in Novi was reconstructed as a single point urban interchange, the first in the metropolitan Detroit area and the first on I-96.
An interchange between 36th Street and I-96 was built starting in 2005 and was completed in 2006. The project aimed to improve access to the Gerald R. Ford International Airport southeast of Grand Rapids. The reconstruction of the Wixom Road interchange near Novi as a SPUI was completed in late fall of 2008. Another interchange at Latson Road in Howell was approved for construction on July 19, 2012. This interchange was designed to bring improved access to the eastern Howell area, which prior to construction of the Latson Road exit was only accessible from westbound I-96. The project was completed on December 2, 2013. Also in 2013, the two interchanges near Nunica serving M-104 and B-31 were reconstructed, with two ramps removed from the former and two added to the latter; a new partial interchange was also built in preparation of M-231, which opened on October 30, 2015.
On April 5, 2014, MDOT closed I-96 between Newburgh Road and US 24. The project was estimated to cost $148 million, and would rebuild the of roadway, replace two bridges, and repair 32 other bridges. The department also planned to install new drainage and replace the signs along I-96. The project was expected to be completed in October 2014. Instead, it was finished ahead of schedule, and that segment of I-96 was re-opened on September 21, 2014.
Also in 2015, work began on bypassing the 1960s interchange with US 23 near Brighton. A new set of through lanes was built on I-96 between the current eastbound and westbound lanes with three new bridges over northbound and southbound US 23, and over Old US 23. The existing lanes of I-96 were changed to be collector-distributor lanes for ramp traffic. This project was completed in November 2016.

Gateway Project

Beginning on February 25, 2008, MDOT and the Detroit International Bridge Company initiated the Ambassador Gateway Project at the eastern end of I-96. The adjacent section of I-75 closed completely to traffic in both directions to start the complete reconstruction of the road to better connect I-75 and I-96 to the Ambassador Bridge, and the plans included the reconstruction of a mile of I-96. That segment of I-96 closed on July 14, 2008, and it was scheduled to reopen a month early the following September. The overall project to realign ramps and connect the bridge to the freeways was mired in lawsuits between MDOT and the private company that owns the bridge. The company's owner was jailed for contempt of court during court proceedings in early 2012. MDOT was later ordered to assume responsibility for construction, and the department completed the project on September 21, 2012.

Incidents

On January 12, 2005, a large multiple-vehicle collision consisting of over 200 motor vehicles occurred on both directions of I-96 near Williamston in Ingham County. Two people, Douglas James Baker and Jason Eldridge were killed in the incident. It was one of the largest collisions in US history and was blamed on heavy fog.
In October 2012, reports of a sniper shooting cars along I-96 in four counties led to a federal investigation and a multi-jurisdictional task force of 100 law enforcement officials. As of October 30, 2012, 25 shootings had been linked to one suspect. The Federal Bureau of Investigation, the Bureau of Alcohol, Tobacco, Firearms and Explosives, and Crime Stoppers offered a $102,000 reward for information leading to the arrest of the perpetrator. The suspect, Raulie Casteel of Wixom, was arrested on November 5, 2012, and ordered to stand trial in 2013 in Oakland County for 60 charges in one case, with a second trial on terrorism and murder charges to be brought by the Michigan Attorney General. On October 30, 2013, the suspect pleaded no contest, but mentally ill, in the Oakland County case, and he was sentenced to serve anywhere from six years and eight months to 10 years in prison on multiple assault charges for that case on February 4, 2014. The trial for the Livingston County case began on January 14, 2014, and after being convicted on the terrorism charge, Casteel was sentenced to 16 to 40 years in state prison.

Exit list

Related trunklines

Auxiliary Interstates

I-96 has four related, auxiliary Interstate highways that connect the main freeway to downtowns and other cities. I-196 is a relatively long freeway spur, beginning at I-96 east of downtown Grand Rapids and heading west through downtown to Holland, and then south to I-94 near Benton Harbor. The unsigned I-296 connects I-96 north of downtown Grand Rapids with I-196 in downtown, and is signed as US 131. I-496 is a loop through downtown Lansing, which I-96 bypasses to the south, and I-696 is a northern bypass of Detroit, connecting I-96 in Novi with I-75 in Royal Oak and I-94 in St. Clair Shores.

Business routes

There have been six business routes of Interstate 96 in the US state of Michigan. There are two business loops designated Business Loop Interstate 96 : one through Lansing and one through Howell. Both follow the old route of US 16, with appropriate connections to I-96. There are three former business spurs that were designated Business Spur Interstate 96. One connected to the carferry docks in Muskegon, running concurrently with part of Business US 31 along former US 16, but it has been eliminated. The second spur ran into downtown Portland until it was decommissioned in 2007. Two routes in the Detroit area—a loop through Farmington and a spur into Detroit—both using Grand River Avenue, and meeting at the temporary end of I-96 near Purdue Avenue, were eliminated when I-96 was moved to the completed Jeffries Freeway in 1977. The Farmington business route is still state-maintained as an unsigned highway, while the Detroit business route remained unsigned until it was decommissioned in 2016 and replaced by an extension of M-5.