International Quarter London




International Quarter London is a business development project built by Lendlease and commercial developer LCR in a subdivision of Stratford, London, England. It is located between the site of the Westfield Stratford City shopping centre and the Queen Elizabeth Olympic Park. The postcode designations are part of E20. Endeavour Square is part of the International Quarter.

Construction

Construction began in 2014 and is ongoing as of 2018, with an estimated cost of £2.1 billion currently.
The code names, designated by the plots being occupied for the most significant buildings were "S5" and "S6", now primarily occupied by the Financial Conduct Authority and Transport for London respectively.
Planning permission was granted for International Quarter London North in 2017 and the first buildings were designated code names "N22" and "N21". following the publishing of the design development report.

Segmentation

The International Quarter spans two core areas, South and North.

IQL South

IQL South was the first to be developed and is partially occupied, with parts still under construction. It is located between Westfield Stratford City and Queen Elizabeth Olympic Park.

IQL North

IQL North was the second core area to be developed. It received planning permission in 2017 and received building code names "N22" and "N21" by the architects, Rogers Stirk Harbour + Partners. The site is located between Penny Brookes Street and International Way, north of Westfield Stratford City.

Tenants

Current commercial office tenants

Current tenants include:
Whilst UNICEF are located inside Endeavour Square, their primary entrance is through 1 Westfield Avenue, occupying the top five floors of the FCA building at number 12 Endeavour Square. Some key tenants have connected shared infrastructure with the extended Westfield Stratford City campus, including badge access, fire and safety systems.

Retail units

There are a number of retail units occupied by Pret a Manger, Tonkotsu and an independent cafe, whilst the others remain unoccupied or are in the process of being fitted out.

Future commercial office tenants

, bespoke building construction is underway for future tenants, including: