Inner Loop (Washington, D.C.)


The Inner Loop was two planned freeways around downtown Washington, D.C. The innermost loop would have formed an oval centered on the White House, with a central freeway connecting the southern segment to the northern segment and then continuing on to Interstate 95. Interstate 95 would have met Interstate 66, Interstate 295, Interstate 695, and US 50 while traversing the Inner Loop. A second loop was an arc across the northern section of the city, beginning at East Capitol Street at the Anacostia River and using the Missouri Avenue NW and Nebraska Avenue NW commercial corridors to terminate in Georgetown.

History and proposed loops

In 1956, federal and regional transportation planners proposed an Inner Loop Expressway composed of three circumferential beltways for the District of Columbia. The majority of the innermost loop would have been a minimum of six lanes, with the portions used by I-95 having a minimum of eight lanes. The final design for the innermost loop made heavy use of cut-and-cover tunnels in order to minimize impacts to the city; one notable example that was built is the tunnel under the National Mall, between C Street SW and D Street NW, used by Interstate 395.
The innermost beltway would have formed a flattened oval centered on the Kennedy Center/Watergate complex in the west, running southeast along what is currently Ohio Drive SW until it linked with the Southwest Freeway portion of I-395, north along I-395 to L Street NW, and then west along a tunnel beneath K Street NW to join near the western nexus with the Whitehurst Freeway and Interstate 66—completing the loop.
The middle beltway would have formed an arc along the northern portion of the city, running from the proposed Barney Circle Freeway through Anacostia Park, cut northeast through the Trinidad neighborhood along Mt. Olivet Road NE, followed the Amtrak rail line north to Missouri Avenue NW, along Missouri Avenue NW to Military Road NW, along Military Road NW across Rock Creek Park to Nebraska Avenue NW, down Nebraska Avenue NW to New Mexico Avenue NW, down New Mexico Avenue NW and across Glover-Archbold Park until it terminated near 37th Street NW at the north end of Georgetown.
The outermost route, the Capital Beltway, would encircle the city of Washington.
D.C. residents strongly opposed both inner loops, upset that the freeways would have required the demolition of large numbers of houses and greatly affected city neighborhoods. As a result, all portions of the network that were not yet started were completely canceled in 1977. This left some portions of the innermost loop incomplete, and the northern arc completely unbuilt.

Built portions