Haymarket Metro station


Haymarket is a station on the Tyne and Wear Metro, serving the city centre in Newcastle upon Tyne. The station joined the network in August 1980, following the opening of the line between Haymarket and Tynemouth – the first stage of the network to open.
Following the opening of the line between Haymarket and Heworth in November 1981, the station opened to through services. Prior to this, trains reversed using the crossover between Haymarket and Monument.
Haymarket is located at the northern end of Northumberland Street. It is a short walk from both Newcastle and Northumbria University, Newcastle Civic Centre and the. It is located around from Haymarket Bus Station, and from Eldon Square Bus Station.
It is the deepest station on the Tyne and Wear Metro network. Prior to the station's refurbishment in the late 2000s, the staircase had 105 steps. The station also has underground rooms, restricted from the public, which contain archives and various historical documents.
The station was used by 3,216,144 passengers in 2017–18, making it the second-most-used station on the network after Monument.

''Haymarket Hub''

In August 2006, final plans for the complete reconstruction of the station, costing £20 million, were released. Plans for a proposed £9 million facelift for the station had previously been announced, in 2004.
Tolent Construction was appointed as contractor for the project, and was headed by the development vehicle, 42nd Street Haymarket Hub. Reid Jubb Brown were the building's architects, with Arup employed as consulting engineers.
Newcastle-based creative communications agency, Gardiner Richardson, alongside University of Sunderland lecturer, Lothar Goetz, worked on redeveloping the station's passenger areas. Gardiner Richardson's work centred on updating Tyne and Wear Metro corporate branding, including the colour palette and signage. Lothar Goetz created an artwork, Canon, using a number of coloured vitreous enamel panels in the concourse, escalator shaft and platform area.
A total of £5 million was spent on refurbishing the passenger area of the station, with work completed in 2009. The station now serves as a blueprint for other station modernisation projects within the Metro: All Change programme, with Central refurbished to a similar style in 2017.
The Princess Royal, Princess Anne, officially opened the newly refurbished Haymarket on 29 March 2010, after travelling on the Tyne and Wear Metro from Jesmond. Haymarket Hub was shortlisted for the 2010 Carbuncle Cup – an architecture prize, given annually by Building Design to "the ugliest building in the United Kingdom completed in the last 12 months".

Facilities

Step-free access is available at all stations across the Tyne and Wear Metro network, with a lift providing step-free access to platforms at Haymarket. As part of the station's refurbishment, lifts and escalators were replaced, with an additional third escalator installed. The station is equipped with ticket machines, seating, next train information displays, timetable posters, and an emergency help point on both platforms. Ticket machines are able to accept payment with credit and debit card, notes and coins. The station is fitted with automatic ticket barriers, which were installed at 13 stations across the network during the early 2010s, as well as smartcard validators, which feature at all stations. The station houses a number of shops, services and offices, as well as a Nexus TravelShop.
There is no dedicated car parking available at the station. There is a taxi rank located adjacent to the nearby Haymarket Bus Station. There is also the provision for cycle parking, with 46 cycle spaces and 20 cycle racks available for use.

Service and frequency

Haymarket is served by the, which operates between South Hylton and Airport, with an end-to-end journey time of 64 minutes, and the, which operates between South Shields and St. James, with an end-to-end journey time of 83 minutes.
Services from platform 1 operate towards South Hylton and South Shields, with the first trains departing at 05:14 and 05:07. Services from platform 2 operate towards Airport and St. James via Whitley Bay, with the first trains departing at 05:58 and 05:49.
Trains run frequently across the network, at intervals of up to every 12 minutes, and every 15 minutes, with the last trains departing at around midnight. Combined, trains run at intervals of up to every 6 minutes, and every 7–8 minutes between Pelaw and South Gosforth.
Additional trains run during morning and evening peak hours between Pelaw and Regent Centre or Monkseaton. This provides a train up to every 3 minutes through the station at peak times.
Journey times from Haymarket are:

Gallery