Harland and Wolff
Harland & Wolff is a shipyard, specialising in ship repair, conversion, and offshore construction, located in Belfast, Northern Ireland. Harland & Wolff is famous for having built the majority of the ships intended for the White Star Line. Well-known ships built by Harland & Wolff include the Olympic-class trio:, and RMS Britannic, the Royal Navy's, Royal Mail Line's Andes, Shaw Savill's, Union-Castle's, and P&O's. Harland and Wolff's official history, Shipbuilders to the World, was published in 1986.
As of 2011, the expanding offshore wind power industry had been the prime focus, and 75% of the company's work was based on offshore renewable energy.
Early history
Harland & Wolff was formed in 1861 by Edward James Harland and Hamburg-born Gustav Wilhelm Wolff. In 1858 Harland, then general manager, bought the small shipyard on Queen's Island from his employer Robert Hickson.After buying Hickson's shipyard, Harland made his assistant Wolff a partner in the company. Wolff was the nephew of Gustav Schwabe, Hamburg, who was heavily invested in the Bibby Line, and the first three ships that the newly incorporated shipyard built were for that line. Harland made a success of the business through several innovations, notably replacing the wooden upper decks with iron ones which increased the strength of the ships; and giving the hulls a flatter bottom and squarer cross section, which increased their capacity. Walter Henry Wilson became a partner of the company in 1874.
When Harland died in 1895, William James Pirrie became the chairman of the company until his death in 1924. Thomas Andrews also became the general manager and head of the draughting department in 1907. It was in this period that the company built and the two other ships in her class, and, between 1909 and 1914, commissioning Sir William Arrol & Co. to construct a massive twin slipway and gantry structure for the project.
In 1912, due primarily to increasing political instability in Ireland, the company acquired another shipyard at Govan in Glasgow, Scotland. It bought the former London & Glasgow Engineering & Iron Shipbuilding Co's Middleton and Govan New shipyards in Govan and Mackie & Thomson's Govan Old Yard, which had been owned by William Beardmore and Company. The three neighbouring yards were amalgamated and redeveloped to provide a total of seven building berths, a fitting-out basin and extensive workshops. Harland & Wolff specialised in building tankers and cargo ships at Govan. The nearby shipyard of A. & J. Inglis was also purchased by Harland & Wolff in 1919, along with a stake in the company's primary steel supplier, David Colville & Sons. Harland & Wolff also established shipyards at Bootle in Liverpool, North Woolwich in London and Southampton. However, these shipyards were all eventually closed from the early 1960s when the company opted to consolidate its operations in Belfast.
The war years
In the First World War, Harland and Wolff built monitors and cruisers, including the 15-inch gun armed "large light cruiser".In 1918, the company opened a new shipyard on the eastern side of the Musgrave Channel which was named the East Yard. This yard specialised in mass-produced ships of standard design developed in the First World War.
During the 1920s, Catholic workers were routinely expelled from working in the shipyard.
The company started an aircraft manufacturing subsidiary with Short Brothers, called Short & Harland Limited in 1936. Its first order was for 189 Handley Page Hereford bombers built under licence from Handley Page for the Royal Air Force. In the Second World War, this factory built Short Stirling bombers as the Hereford was removed from service.
The shipyard was busy in the Second World War, building six aircraft carriers, two cruisers and 131 other naval ships; and repairing over 22,000 vessels. It also manufactured tanks and artillery components. It was in this period that the company's workforce peaked at around 35,000 people. However, many of the vessels built in this era were commissioned right at the end of World War II, as Harland and Wolff were focused on ship repair in the first three years of the war. The yard on Queen's Island was heavily bombed by the Luftwaffe in April and May 1941 causing considerable damage to the shipbuilding facilities and destroying the aircraft factory.
Post-war period
With the rise of the jet-powered airliner in the late 1950s, the demand for ocean liners declined. This, coupled with competition from Japan, led to difficulties for the British shipbuilding industry. The last liner that the company launched was MV Arlanza for Royal Mail Line in 1960, whilst the last liner completed was SS Canberra for P&O in 1961.In the 1960s, notable achievements for the yard included the tanker Myrina, which was the first supertanker built in the UK and the largest vessel ever launched down a slipway, as it was in September 1967. In the same period the yard also built the semi-submersible drilling rig Sea Quest which, due to its three-legged design, was launched down three parallel slipways. This was a first and only time this was ever done.
In the mid-1960s, the British government started advancing loans and subsidies to British shipyards to preserve jobs. Some of this money was used to finance the modernisation of the yard, allowing it to build the much larger post-war merchant ships including one of 333,000 tonnes.
The shipyard already had a reputation as a Protestant factory, and in 1970, during the Troubles, 500 Catholic workers were expelled from their role.
Continuing problems led to the company's nationalisation, though not as part of British Shipbuilders, in 1977. In 1971, the Arrol Gantry complex, within which many ships were built until the early 1960s, was demolished. The nationalised company was sold by the British government in 1989 to a management/employee buy-out in partnership with the Norwegian shipping magnate Fred Olsen; leading to a new company called Harland & Wolff Holdings Plc. By this time, the number of people employed by the company had fallen to around 3,000.
For the next few years, Harland & Wolff specialised in building standard Suezmax oil tankers, and has continued to concentrate on vessels for the offshore oil and gas industry. It has made some forays outside this market.
In the late 1990s, the yard was part of the then British Aerospace's team for the Royal Navy's Future Carrier programme. It was envisaged that the ship would be assembled at the Harland & Wolff dry-dock in Belfast. In 1999 BAE merged with Marconi Electronic Systems. The new company, BAE Systems Marine, included the former Marconi shipyards on the Clyde and at Barrow-in-Furness thus rendering H&W's involvement surplus to requirements.
The company bid unsuccessfully tendered against Chantiers de l'Atlantique for the construction of Cunard line's new.
Restructuring and 2019 financial collapse
Faced with competitive pressures, Harland & Wolff sought to shift and broaden their portfolio, focusing less on shipbuilding and more on design and structural engineering, as well as ship repair, offshore construction projects and competing for other projects to do with metal engineering and construction. This led to Harland and Wolff constructing a series of bridges in Britain and also in the Republic of Ireland, such as the James Joyce Bridge and the restoration of Dublin's Ha'penny Bridge, building on the success of its first foray into the civil engineering sector with the construction of the Foyle Bridge in the 1980s.Harland & Wolff's last shipbuilding project was MV Anvil Point, one of six near identical s built for use by the Ministry of Defence. The ship, built under licence from German shipbuilders Flensburger Schiffbau-Gesellschaft, was launched in 2003.
Harland and Wolff tendered for the contract to build RMS Queen Mary 2 in 2003, but was not given the government guarantee necessary to do so. As a result, the contract was awarded to Chantiers de l'Atlantique. The ship entered service in 2004.
In recent years the company had seen its ship-related workload increase slightly. Whilst Harland & Wolff had no involvement in any shipbuilding projects for the foreseeable future, the company is increasingly involved in overhaul, re-fitting and ship repair, as well as the construction and repair of off-shore equipment such as oil platforms. On 1 February 2011 it was announced that Harland & Wolff had won the contract to refurbish, effectively rekindling its nearly 150-year association with the White Star Line. Structural steel work on the ship began on 10 February 2011 and was completed in time for the 2012 Belfast Titanic Festival. In July 2012 Harland & Wolff was to carry out the dry docking and service of the Husky Oil SeaRose FPSO vessel.
Belfast's skyline is still dominated today by Harland & Wolff's famous twin gantry cranes, Samson and Goliath, built in 1974 and 1969 respectively. There is also speculation about a resurgence in the prosperity of the shipyard thanks to the company's diversification into emerging technologies, particularly in renewable energy development, such as offshore wind turbine and tidal power construction, which may provide an opportunity to further improve the company's fortunes in the long term. For example, the United Kingdom planned to build 7,500 new offshore wind turbines between 2008 and 2020, creating great demand for heavy assembly work. Unlike land-based wind turbines, where assembly occurs on site, offshore wind turbines have part of their assembly done in a shipyard, and then construction barges transport the tower sections, rotors, and nacelles to the site for final erection and assembly. As a result of this, in late 2007, the 'Goliath' gantry crane was re-commissioned, having been moth-balled in 2003 due to the lack of heavy-lifting work at the yard.
In June 2008, assembly work at the Belfast yard was underway on 60 Vestas V90-3MW wind turbines for the Robin Rigg Wind Farm. This was the second offshore wind farm assembled by the company for Vestas having completed the logistics for the Barrow Offshore Wind Farm in 2006. In August 2011 Harland and Wolff completed the logistics for the Ormonde Wind Farm which consisted of 30 REpower 5MW turbines.
In March 2008, the construction of the world's first commercial tidal stream turbine, for Marine Current Turbines, was completed at the Belfast yard. The installation of the 1.2MW SeaGen Tidal System was begun in Strangford Lough in April 2008.
In July 2010, Harland & Wolff secured a contract to make a prototype tidal energy turbine for Scotrenewables Ltd. Manufacture of the SR250 device was completed in May 2011 and has been undergoing testing in Orkney since.
As of April 2012, the booming offshore wind power industry had taken centre stage. Harland & Wolff had been working on three innovative meteorological mast foundations for the Dogger Bank and Firth of Forth offshore wind farms, as well as putting the finishing touches to two Siemens substations for the Gwynt y Môr offshore wind farm. Seventy-five per cent of the company's work was based on offshore renewable energy. Harland & Wolff was one of many UK and international companies profiting from the emergence of UK wind- and marine-generated electricity, which had been attracting significant inward investment. As the business environment became increasingly competitive the yard began to have difficulty in generating enough business to meet overhead expenses. The yard was last profitable in 2015 and the following year it had an operating loss of 6M GBP. In 2018 the parent company underwent a restructuring and decided to place Harland and Wolff up for sale. No buyer emerged and on August 5, 2019 the company announced that they would cease trading and entered formal administration.
Subsequently, on the 1st of October 2019, It was announced that the company was bought for £6m by the London-based energy firm, InfraStrata.