The current service is co-extensive with the BMT Franklin Avenue Line. It parallels Franklin Avenue, hence the shuttle's name. It was originally a part of the mainline of the BMT Brighton Line and opened as part of that steam railroad line in 1878. On November 1, 1918, a five-car woodenelevated train left the tracks and crashed into one of the new tunnel walls, killing at least 93. This accident, called the Malbone Street Wreck, was among the worst rapid transit disasters ever. The mainline was shifted in 1920, with subway trains from Manhattan and elevated trains from Franklin Avenue sharing operations to Coney Island. After the city gained ownership of the line in 1940, Brighton-Franklin services gradually declined. A major blow to through service viability occurred in 1954 when the train of the IND Division was extended to Coney Island via the Culver Line, deprived the Franklin of a major source of transfer traffic, consisting of passengers from Harlem and the Bronx, who now had a more direct route to Coney Island.
Truncation
Brighton-Franklin express service ended by 1959, and the Franklin Avenue Line became a full-time shuttle in 1963. On November 1, 1965, when R27s started going into service, this service was named SS, and in 1985, when the practice of using double letters was eliminated, this service became the S. On December 1, 1974, a southbound shuttle train of R32s was approaching the tunnel portal en route from Franklin Avenue when it derailed on the crossover and smashed the same place where BRT car 100 had hit in the Malbone Street Wreck. This derailment resulted in some injuries, with R32 car 3668 damaged beyond repair, but there were no reported fatalities, because time signals limit the speed of trains coming down the hill from Crown Heights.
Deterioration and renovation
Alternate SF bullet
In 1981, the MTA proposed abandoning the service under the failed Program for Action. At the time, only 10,000 passengers used the shuttle per day, and in addition, the Franklin Avenue Line was severely deteriorated. It was proposed that additional B48 bus service along nearby Franklin Avenue could substitute for the line. During the winter, the line would often be closed because there was fear that trains would derail. Stations were in horrible condition; portions of the wooden platforms were sealed off because they had burned or collapsed. In January 1982, the line needed to close for emergency repair work because a retaining wall along the line was in danger of collapse. In the 1990s the Franklin Avenue Shuttle was known as the "ghost train". It was shrunk in size to only two cars, and the Dean Street station, which had 50 paying riders per day, was closed in 1995. The entire line was under consideration for abandonment, and community leaders were opposed to the move. They showed up to town hall meetings, news conferences and they sat down with transit officials. They also formed the Committee to Save the Franklin Avenue Shuttle. The coalition included the Straphangers Campaign, a local church, local community boards and the New York CityEnvironmental Justice Alliance. They argued that subway station repair work occurred elsewhere, while no attention was paid to the Franklin Avenue Shuttle. In the end they convinced the New York State Assembly to force the MTA to rebuild rather than abandon the line, and as a result most of the supporting infrastructure and stations were completely rehabilitated for 18 months, between July 1998 and October 1999 at a cost of $74 million. While the closure of the line started in July 1998, work began in September 1997. During the renovation, a temporary shuttle bus and the B48 bus replaced train service. The line reopened on October 18, 1999, three months ahead of schedule. , the Franklin Avenue Shuttle is the most punctual train in the New York City Subway system with a 99.7 percent on-time average. The shuttle averages 20,000 riders per day.
Stations
For a more detailed station listing, see BMT Franklin Avenue Line.