The Fahrettin Altay—Evka 3 Line, unofficially referred to as M1, is a 20.1 km long route of the Izmir Metro. It is the only operating line of the İzmir Metro system, although the construction of two new lines is expected to begin in 2018. The line originally opened on 22 May 2000 and operated between Bornova and Üçyol. Between 2012 and 2014 the line was gradually expanded to its current route. The Fahrettin Altay—Evka 3 Line is the fourth rapid transit line to open in Turkey, after the M1 in Istanbul and Ankaray and the M1 in Ankara.

Stations

StationOpeningStructure ConstructionStructure PlatformTracks
Fahrettin Altay26 July 2014Cut-and-Cover Tunnel2 Side Platforms2
Poligon26 July 2014Cut-and-Cover Tunnel2 Side Platforms2
Göztepe25 March 2014Deep Tunnel2 Side Platforms2
Hatay29 December 2012Cut-and-Cover Tunnel2 Side Platforms2
İzmirspor29 December 2012Cut-and-Cover Tunnel2 Side Platforms2
Üçyol22 May 2000Deep Tunnel2 Side Platforms2
Konak22 May 2000Cut-and-Cover Tunnel1 Island Platform2
Çankaya22 May 2000Cut-and-Cover Tunnel1 Island Platform2
Basmane22 May 2000Cut-and-Cover Tunnel1 Island Platform2
Hilal22 May 2000Viaduct2 Side Platforms2
Halkapınar22 May 2000Grade2 Island Platforms3
Stadyum22 May 2000Viaduct2 Side Platforms2
Sanayi22 May 2000Grade1 Island Platform2
Bölge22 May 2000Grade1 Island Platform2
Bornova22 May 2000Splitting Tunnel1 Island Platform2
Ege Üniversitesi30 March 2012Cut-and-Cover Tunnel2 Side Platforms2
Evka 330 March 2012Cut-and-Cover Tunnel2 Side Platforms2

Connections

At Basmane station, there are connections available to Turkish State Railways.