Echigo Tokimeki Railway


The Echigo TOKImeki Railway Company is a Japanese third-sector railway operating company established in 2010 to operate passenger railway services on the sections of the JR East Shinetsu Main Line and JR West Hokuriku Main Line within Niigata Prefecture when they were separated from the respective JR Group operators in March 2015, coinciding with the opening of the Hokuriku Shinkansen extension from to. The main shareholders of the company are Niigata Prefecture, the city of Joetsu, the city of Itoigawa, and the city of Myoko.

Lines

Since 14 March 2015, Echigo Tokimeki Railway operates local passenger operations on two lines: 10 stations on the 37.7 km Myōkō Haneuma Line between and, and 11 stations on the 59.3 km Nihonkai Hisui Line between Naoetsu and.

Myōkō Haneuma Line

Service outline

In addition to all-stations "Local" services operated by ETR, the line is used by JR East Shirayuki limited express services operating over the section between and, providing connections with the Hokuriku Shinkansen at Naoetsu, and also by one return "Rapid" service daily operated by the Hokuetsu Express, to and from and using the section of the line between Naoetsu and.

Stations

Rolling stock

Local services on the Myōkō Haneuma Line use a fleet of ten ET127 series 2-car electric multiple unit trains transferred from JR East. These have reinforced front-end skirts, and feature a new livery. They operate as two- or four-car formation during the off-peak periods, and as six-car formations during peak periods. Shirayuki limited express services operated by JR East use four-car E653-1100 series EMUs.

Nihonkai Hisui Line

Service outline

While the western boundary of the Nihonkai Hisui Line is at Ichiburi Station, most services on the line operate between Naoetsu and on the Ainokaze Toyama Railway Line. At Tomari Station, both ETR trains and Ainokaze Toyama Railway trains use platform 2, allowing a same-platform transfer.

Stations

Rolling stock

The eastern section of the line is electrified at 1,500 V DC and the western section of the line is electrified at 20 kV AC overhead, with a dead section separating the two different power supplies between Itoigawa and Kajiyashiki stations, but in order to eliminate the need to procure new dual-voltage rolling stock, local services on the Nihonkai Hisui Line use a fleet of eight new ET122 single-car diesel multiple unit trains based on the JR West KiHa 122 series design. This fleet includes two special-event cars. Services normally operate as single-car trains during the off-peak periods, increased to two cars during the peaks.
Until March 2017, a seasonal limited-stop "Rapid" service operating between and Itoigawa ran once a day in each direction using a 6-car JR East 485 series EMU.

History

The company was founded on 22 November 2010. The new names for the two lines to be operated by the company were announced in June 2012, and the company name was changed to Echigo Tokimeki Railway Company from 1 July 2012. The company was formally granted a railway operating license by the Ministry of Land, Infrastructure, Transport and Tourism on 28 February 2014.

Resort train

A two-car ET122-1000 series diesel multiple unit resort train is due to enter service from 23 April 2016, operating over both of the ETR lines. The two-car diesel train will be branded.