Dornier Do 228
The Dornier Do 228 is a twin-turboprop STOL utility aircraft, designed and first manufactured by Dornier GmbH from 1981 until 1998. 245 were built in Oberpfaffenhofen, Germany. In 1983, Hindustan Aeronautics bought a production licence and manufactured another 125 aircraft in Kanpur, India. In July 2017, 63 aircraft were still in airline service.
In 2009, RUAG started building a Dornier 228 New Generation in Germany. The fuselage, wings and tail unit are manufactured by Hindustan Aeronautics Limited in Kanpur, India, and transported to Oberpfaffenhofen, where RUAG Aviation carries out aircraft final assembly. The Do 228NG is basically the same aircraft with improved technologies and performances, such as a new five-blade propeller, glass cockpit and longer range. The first delivery was made in September 2010 to a Japanese operator.
Development
Origins
In the late 1970s, Dornier GmbH developed a new kind of wing, the TNT, subsidized by the German Government. Dornier tested it on a modified Do 28D-2 Skyservant and with Pratt & Whitney Canada PT6A-110 turboprop engines. Finally, Dornier changed the engine and tested the new aircraft, which was named Do 128 with two Garrett AiResearch TPE-331-5 engines. The company developed a new fuselage for the TNT and TPE 331–5 in two variants and named both project-aircraft E-1 and E-2. At the ILA Berlin Air Show in 1980, Dornier presented the new aircraft to the public. Both of the prototypes were flown on 28 March 1981 and 9 May 1981 for the first time.colors, its first operator
After German certification was granted on 18 December 1981, the first Do 228-100 entered service in the fleet of Norving in July 1982. The first operator of the larger Do 228-200 entered service with Jet Charters in late 1982. Certification from both British and American aviation authorities followed on 17 April and 11 May 1984 respectively. By 1983, the production rate of the Do 228 had risen to three aircraft per month; at this point, Dornier had targeted that 300 Do 228s would be produced by the end of the 1980s. In November 1983, a major license-production and phased technology-transfer agreement was signed between Dornier and Hindustan Aeronautics Limited was signed; a separate production line was established and produced its first aircraft in 1985. By 2014, a total of 125 Do 228s had been produced in India.
Over the years, Dornier offered the 228 in upgraded variants and fitted with optional equipment for performing various special missions. In 1996, it was announced that all manufacturing operations would be transferred to India. In 1998, activity on the German production line was halted, in part to concentrate on the production of the larger Fairchild-Dornier 328 and in response to Dornier's wider financial difficulties.
Do 228NG
acquired the Do 228 type certificate in 2003. In December 2007, RUAG announced their intention to launch a modernized version of the aircraft, designated as the Do 228 Next Generation, or Do 228 NG.At the 2008 Berlin Air Show, HAL agreed on supplying the first three components sets — fuselage, wings and tail — for €5 million, as a part of an €80 million ten-year contract.
In June 2010, the passenger aircraft was priced at €5.2 million, €5.8–5.9 million with JAR-Ops equipment; restarting its production cost €20 million.
On 18 August 2010, the Do 228NG received its airworthiness certification from the European Aviation Safety Agency. The final assembly for the type is located in Germany; however, most airframe subassemblies, such as the wings, tail and fuselage, are produced by HAL in India. The main changes from the previous Dornier 228-212 model were a new five-blade propeller made of composite material, more powerful engines and an advanced glass cockpit featuring electronic instrument displays and other avionics improvements.
The first delivery, to the Japanese operator New Central Aviation, took place in September 2010. RUAG decided to suspend production of the Do 228 NG after the completion of an initial batch of eight aircraft in 2013. In 2014, RUAG and Tata Group signed an agreement for the latter to become a key supplier of the program. Production was restarted in 2015, with deliveries of four per year planned from 2016. In February 2016, RUAG announced that they were set to begin serial production of the Do 228 NG at its German production line in mid-2016; the assembly line is reportedly capable of producing a maximum of 12 aircraft per year.
Indian production
The aircraft was made eligible to fly commercial flights in Europe after the European Aviation Safety Agency accepted the Directorate General of Civil Aviation certification for the aircraft on 30 August 2019.Hybrid-Electric Demonstrator
Supported by Bavarian funding, the German DLR is modifying one of its two Do 228 into a demonstrator hybrid electric aircraft.The first fully electric flight is planned for 2020 and the first hybrid-electric flight for 2021, apparently from Cochstedt Airport.
Partners include MTU Aero Engines and Siemens, of which Rolls-Royce plc is acquiring the electric propulsion unit.
Design
The Dornier 228 is a twin-engine general purpose aircraft, capable of transporting up to 19 passengers or various cargoes. It is powered by a pair of Garrett TPE331 turboprop engines. The Do 228 is commonly classified as a Short Takeoff and Landing -capable aircraft, being capable of operating from rough runways and in hot climates. This capability has been largely attributed to the type's supercritical wing which generates large amounts of lift at slow speeds. The Do 228 is typically promoted for its versatility, low operational costs, and a high level of reliability – possessing a dispatch reliability of 99%. RUAG Aviation have claimed that no other aircraft in the same class may carry as much cargo or as many passengers over a comparable distance as fast as the Do 228 NG.The rectangular shape of the Do 228's fuselage section and large side-loading doors make it particularly suitable for utility operators, which is a market that Dornier had targeted with the type from the onset. According to Flight International, one of the more distinguishing features of the Do 228 is the supercritical wing used. The structure of the wing is atypical, consisting of a box formed from four integrally-milled alloy panels, while kevlar is used for the ribs, stringers, trailing edge and fowler flaps, the wing's leading edge is conventional alloy sheet metal. Benefits of this wing over conventional methodology include a 15% reduction in weight, the elimination of 12,000 rivets, and lowering the per-aircraft manufacturing workload by roughly 340 man hours. Both the fuselage and tail are of a conventional design, but make use of chemical milling in order to save weight.
The Do 228 has been promoted in various capacities, including as a commuter aircraft, a military transporter, cargo hauler, or as a special missions aircraft. Special missions include maritime surveillance, border patrol, medevac, search and rescue, paradrop and environmental research missions, in which capacity the type has proven useful due to a ten-hour flight endurance, a wide operating range, low operational cost, and varied equipment range. Special equipment available to be installed include a 360-degree surveillance radar, side-looking airborne radar, forward-looking infrared sensor, search light, operator station, real-time datalink, enlarged fuel tanks, satellite uplink, stretches, air-openable roller door, and infrared/ultraviolet sensors. In addition to a 19-seat commuter configuration for airlines, a VIP cabin configuration is also offered; the cabin can also be customized as per each client's specifications. The Do 228 is the only aircraft of its class to be fitted with air conditioning as standard.
Do 228NG
More than 350 design changes are present between the Do 228 and the re-launched Do 228 NG. Amongst the principal changes is the adoption of Universal's UNS-1 glass cockpit, which means that standard aircraft are equipped to be flown under single-pilot instrument flight rules in addition to visual flight rules ; according to RUAG Aviation, the Do 228 NG is the first aircraft in its class to be certified with equivalent electronics. A total of four large displays are used in the cockpit, two primary flight displays and two multifunction displays, to present all key flight data. The navigation system includes VHF omnidirectional range, distance measuring equipment, automatic direction finder, radar altimeter, Global Positioning System, air data computer, and a flight management system. A three-axis autopilot can be optionally incorporated, as can a weather radar and high frequency radio. While designed for two-pilot operation, the Dornier 228 can be flown by only one crewmember.Additional changes include the Garrett TPE331-10 engines, which have been optimized to work with the redesigned five-bladed fibre-composite propellers now used by the type, which are more efficient, quick to start, and produces substantially less vibration and noise than the original metal four-bladed predecessor. Through its engines, the Do 228 NG has the longest time between overhaul of any 19-seat aircraft, reportedly up to 7,000 hours. An engine-indicating and crew-alerting system is also present for safety purposes; additional optional safety equipment akin to much larger passenger aircraft, including airborne collision avoidance system and terrain awareness and warning system, can be incorporated as well.
Operators
In July 2018, 57 aircraft were in airline service.Other operators include police, law enforcement, para-military operators and military operators.
By July 2018, the fleet accumulated over four million flight hours.
Accidents and incidents
The Do 228 has been involved in 49 aviation accidents and incidents including 40 hull losses.Those resulted in 187 fatalities.
Date | Flight | Fat. | Location | Event | Surv. |
26 March 1982 | Dornier | 3 | Germany, near :de:Igenhausen|Igenhausen | Prototype test flight, Loss of control | 0 |
24 February 1985 | AWI Polar 3 | 3 | West Sahara, near Dakhla | Shot down by the Polisario Front guerrillas | 0 |
23 September 1989 | Vayudoot PF624 | 11 | India, near Indapur | Loss of control | 0 |
18 April 1991 | Air Tahiti 805 | 10 | French Polynesia, near Nuku Hiva | Engine failure in approach not acknowledged then ditching | 12 |
2 January 1993 | Indian Coast Guard | 4 | India, near Paradip | Crashed into sea | 2 |
28 February 1993 | Formosa Airlines | 6 | Taiwan, near Orchid Island | Struck the sea while approaching Orchid Island in heavy rain | 0 |
31 July 1993 | Everest Air | 19 | Nepal, near Bharatpur Airport | Controlled Flight Into Terrain while on approach | 0 |
10 August 1997 | Formosa Airlines | 16 | Taiwan, near Matsu Airport | Crashed while attempting to land | 0 |
6 September 1997 | Royal Brunei 238 | 10 | Malaysia, near Miri Airport | Crashed at Lambir Hills National Park on approach | 0 |
30 July 1998 | Indian Airlines 503 | 9 | India Cochin airport | Poor stabilizer maintenance, loss of control, 3 killed on ground | 0 |
7 August 1999 | TACV Flight 5002 | 18 | Cape Verde, Santo Antão Airport | Controlled Flight Into Terrain – Mountain | 0 |
17 September 2006 | Nigerian Air Force | 13 | Nigeria, near Vandeikya | Controlled Flight Into Terrain – Mountain | 5 |
24 August 2010 | Agni Air Flight 101 | 14 | Nepal, near Shikharpur, Narayani | Controlled Flight Into Terrain – Mountain | 0 |
14 May 2012 | Agni Air | 15 | Nepal, near Jomsom Airport | Crashed while attempting to land | 6 |
28 September 2012 | Sita Air Flight 601 | 19 | Nepal, near Kathmandu Airport | Engine bird strike, crashed and burned shortly after takeoff | 0 |
9 September 2013 | CorpFlite | 2 | Chile, near Viña del Mar Airport | Crashed into power lines whilst attempting to land in fog | 0 |
24 March 2015 | Indian Navy | 2 | Indian Ocean, near Goa, India | Believed to have plunged into the sea after technical problems | 0 |
8 June 2015 | Indian Coast Guard | 3 | Indian Ocean, near Pichavaram | Crashed into sea, located on 10 July, 16.5 nmi off coast | 0 |
29 August 2015 | Nigerian Air Force | 7 | Kaduna, Nigeria | Crashed into a house and burned near departure airport | 0 |
24 November 2019 | Busy Bee Congo | 20+6 | Goma, DR Congo | Crashed on takeoff from Goma Airport | 0 |