Conestoga Parkway


The Conestoga Parkway is a freeway in the Regional Municipality of Waterloo, in the Canadian province of Ontario. It runs northeast/southwest through the cities of Kitchener and Waterloo, and is connected to Highway 401 via the Highway 8 Freeport Diversion and King Street East. The name "Conestoga Parkway" is not a formal designation, but rather a local name applied to the divided expressway portions of Highway 7, Highway 8 and Highway 85 through Kitchener and Waterloo. When the parkway opened in the late 1960s there were a few large green and white signs reading "Conestoga Parkway" with a picture of a Conestoga wagon on them located along the parkway. By the 1990s after several sections of the parkway had undergone reconstruction and expansion, these signs had been removed but many maps still show this as the name of the freeway. Most residents of Kitchener and Waterloo refer to the parkway as "The Expressway". By contrast, the portion of Highway 8 which departs from the parkway at King Street East in Kitchener and runs to Highway 401 is often referred to as the Freeport Diversion, "Highway 8 Expressway" or "King Street Bypass" by local residents.

Route description

The multiplex of Highway 7 and Highway 8 enters the city of Kitchener as a controlled-access freeway from the west; it takes on the name Conestoga Parkway at the Trussler Road exit at the western edge of the city. The Parkway continues east until Highway 8 branches off toward the southeast via an interchange. At this point, the Conestoga Parkway turns northward and becomes Highway 7.
At the Victoria Street exit, the Parkway sheds the Highway 7 designation and becomes Highway 85. It continues through the city of Waterloo towards St. Jacobs, where the freeway alignment ends and becomes Regional Road 85, or Arthur Street South.
Note that the Parkway is merely a controlled-access portion of the three numbered highways, two of which continue for some distance beyond the freeway referred to as the Conestoga Parkway. Thus, the freeway has the distinction of being one of the few Ontario-maintained freeways not numbered according to the 400-Series Highway network, even though it is busier and wider than many rural 400-series highways, because the freeway upgrade has joined together only parts of existing routes. In comparison, the 400-series highways are intended to be full freeways for their entire length.
The speed limit on the Conestoga Parkway is 90 km/h. From its completion in the late 1960s its speed limit was 100 km/h, but the limit was lowered in the late 1990s due to collisions across the grass median. Highway 7/8 between Courtland Avenue and Fischer-Hallman Road has an abnormally narrow median, and overpasses are single structures with simple curbs as median dividers instead of the usual Jersey barrier or Ontario tall-wall. The portion of Highway 7/8 which was converted into a freeway in the 1990s does not have this deficiency, nor do the portions of the Parkway signed as Highways 7 and 85.

History

The parkway is one of the busiest roads in the region. It was completed as a four-lane freeway in the late 1960s, with the exception of the short eight-lane collector–express system serving Highway 7/Victoria Street and Wellington Street. Mainline traffic on Highway 8 could continue under the Conestoga, where the route defaults to King Street, to enter downtown Kitchener. The Conestoga east/north of this junction serves as a bypass of King Street.
At the time, the Conestoga Parkway and Highway 8 Freeport Diversion freeways were isolated from the 400-series highway network, as the Freeport Diversion ended at an at-grade Y-junction with King Street East. Traffic from the Freeport Diversion was treated as the mainline traffic at this interchange and King East continued to a cloverleaf interchange with Highway 401.
A direct freeway connection between Highway 401 and the Conestoga was made possible when a new bypass was opened in 1987; it featured a Y-junction with Highway 401 to serve traffic east of that junction. The cloverleaf interchange with the existing Highway 8 had several ramps realigned, and it continues to serve traffic from eastbound Highway 401. There remains no direct freeway connection to Highway 8 from Highway 401 westbound. Drivers wishing to travel from Kitchener-Waterloo onto Highway 401 Westbound are required to divert onto "old Highway 8", through several sets of traffic lights, causing considerable traffic congestion.
In 1993, a four-lane extension to Baden was opened, linking up with an existing undivided four-lane expressway at New Hamburg.
Since the late 1990s, the Conestoga has undergone extensive reconstruction between Courtland Avenue and Lancaster Street, with the addition of an Ontario "tall-wall" concrete median barrier and high-mast lighting replacing the conventional mercury truss lights. The widening project resulted that stretch of the Parkway being expanded to at least six lanes by using the grass median, and eight lanes between Highway 8 and a location midway between Ottawa and Frederick Streets by using the right-of-way afforded by the shoulders. In 2004, extensive improvements were completed around the former obsolete and bottlenecked "half-cloverleaf" junction with the freeway section of Highway 8, that links it to Highway 401. This included a new flyover semi-directional ramp from Conestoga westbound to Highway 8 eastbound, while the ramp in the opposite direction was realigned to allow it to carry two lanes of traffic at a higher speed.
Starting in 2013, the section running from just east of Courtland Avenue to just west of Fischer-Hallman Road has undergone widening and upgrading. Replacement of the Westmount Road overpass and a rebuild of the Fischer-Hallman interchange happened in the first year; the remainder is set to be completed by 2015.
In addition to the proposed Highway 7 freeway between Kitchener and Guelph, the Ministry of Transportation has long term plans to widen and reroute Highway 7/8 westward to Stratford. How this will affect the village of Shakespeare, which the open highway currently bisects, is an issue of some concern.

Highway 7 freeway to Guelph

There is a stark difference between the congested, inefficient exit for Highway 7/Victoria Street, and the high-capacity but underused Wellington Street exit just north of it, both which are served by the short collector–express system on the Conestoga Parkway. This is due to the expectation that Highway 7 would be redirected as a controlled-access highway that would link up Conestoga Parkway and Hanlon Parkway, bypassing Victoria Street, connecting to the Conestoga via a 4-level interchange to be built over the existing Wellington Street parclo junction. However, these plans have languished for over 30 years and were still in the planning stages as of 2017. Opposition has arisen due to the new alignment of this Highway 7 freeway passing through environmentally sensitive lands. In particular, the 4-level interchange's $25 million cost represents a quarter of the projected $100 million budget for the total Highway 7 project, with the high cost partly due to the difficulty in land acquisition to accommodate the flyover ramps. The Victoria Street overpass was demolished on February 23–24, 2018, and was replaced with a new structure that reopened to traffic on October 28, 2018; the new bridge is longer and has a higher elevation to accommodate the future ramps between Highway 7 and the Conestoga.

Exit list